Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | L1 | Accepted-AOC lowest bidder | |
| 2 | L2₹1.9 L+₹2,751.12 (1.47%)Rejected-Finance 1 1 NORTH ROAD JADAVPUR KOLKATA | KOLKATA | WEST BENGAL | L2 | Rejected-Finance higher than L1 | |
| 3 | L3₹1.9 L+₹3,743.46 (2.00%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L3 | Rejected-Finance higher than L1 | |
| 4 | L4₹1.9 L+₹4,645.03 (2.48%)Rejected-Finance 344 1 SB GORAI ROAD HILL VIEW PARK NORTH ASANSOL | ASANSOL | WEST BENGAL | L4 | Rejected-Finance higher than L1 |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
10 Dec 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive_Engineer_NTKMD_PHED
Utility_Bldg__Beside_Delhi_Public_School_AA_ID_New_Town_Kol_700156
Overhauling_of_11KV_Breaker_and_LT_panel_with_allied_works_at_DPS_Point-F_AA-I_under_NTK_Project
2022_PHED_426304_13
PHE/NTKMD/e-08 of 2022-23
Open Tender
Project Work
Item Wise
15 days
work
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
6 Jan 2023
25 Nov 2022
12 Dec 2022
26 Nov 2022
10 Dec 2022
27 Nov 2022
Amount
For HT panel : Thorough testing and calibration of 11KV VCB 3 Panel distribution board at site: A) Disconnection of 11KV HT cables. B) Cleaning of entire panel by carbon cleaner to remove all carbon particles. C) Cleaning of all dismantled components to remove all carbon particles and sulphation to improve insulation resistor (IR). D) 11KV Breaker completely servicing, cleaning by CRC & checking of all parts and make it in proper condition. E) Cable and termination to be cleaned by carbon cleaner. F) After servicing of all switch gear & checking its IR with respect to earth and phase to phase, they are racked in service position & kept at ON condition. At this condition High Voltage testing. G) All over current and earthfall relays tested by secondary injection. H) IR value checking of PT & CT. I) Tripping test of Breaker by primary injection. J)After testing all the HT cables (11KV) reconnected for successfully charging of 11KV supply on put on load condition. For LT PCC panel : A) Thorough cleaning of entire PCC panel & lighting. B) Testing & servicing of Air Circuit Breaker C) Testing of all MCCB, SFU, CT etc. D) All tightness checking fitting fixing.
Dehydration & filtrtation of 2 nos. 11/0.433KV 1000KVA transformer oil of the existing trasnformer (2 nos. x 1070 ltr.) = 2140 ltr.
Dielectric strength test as per specification of the I.E rules (2 nos. 1000KVA transformer).
Transportation charges of filtration machine (to & fro).
Supply, delivery and filling of Silica Gel at 1000KVA transformer after taking out the damaged gel as per direction.
GST @18% of Total Value in Amount
CESS @ 1% of Total Value in Amount
MACHINE SUPPLIERS SYNDICATE PVT LTD
ORIENTAL ENGINEERING CO.
EASTERN INDIA SALES AND SERVICE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .