| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.3 LAccepted-AOC | L1 | Accepted-AOC BEING L1 | |
| 2 | L2₹45.3 L+₹91,472 (2.06%)Rejected-Finance | L2 | Rejected-Finance BEING L2 | |
| 3 | L3₹46.6 L+₹2.2 L (5.06%)Rejected-Finance 58 MODERN MARKET NEAR AMBER CINEMA JAMNAGAR | JAMNAGAR | L3 | Rejected-Finance BEING L3 | |
| 4 | L4₹47.7 L+₹3.3 L (7.34%)Rejected-Finance INS VALSURA JAMNAGAR | JAMNAGAR | GUJARAT | 360520 | L4 | Rejected-Finance BEING L4 | |
| 5 | L5₹50.4 L+₹6.0 L (13.5%)Rejected-Finance 121 MADHAV SQUAR OPP AVANTIKA COMPLEX LIMDA LANE JAMNAGAR 361001 | JAMNAGAR | GUJARAT | 361001 | L5 | Rejected-Finance BEING L5 |
| Sl No | Description | Qty | Unit | fakhrie apostrical L3 | jitendra c joisar L2 | SURESH ELECTRICALS L5 | JAMNAGAR ELECTRIC AND MACHINERY CO L4 | SHREEJI ENTERPRISE L6 | SURAJ ENTERPRISE L1 | Ravi enterprise L8 | VIVEK JITENDRABHAI KATAR L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0.00Schedule 'A' B/R | |||||||||||
| 1.00 | Excavation in trenches not exceeding 1.5 Metre wide and not exceeding 1.5 Metre in depth for foundation etc., not exceeding 10 Sqm on plan and not exceeding 1.5 Metre in depth and getting out in soft/loose soil, complete all as specified and directed by Engr-in-charge. | 136 | Cubic Metre | 410 ₹55,760 | 405 ₹55,080 | 455 ₹61,880 | 425 ₹57,800 | 480 ₹65,280 | 380 ₹51,680 Lowest | 450 ₹61,200 | 500 ₹68,000 |
| 2.00 | Material & Labour for Plain Cement Concrete 1:4:8 type D-2 (using 40mm graded stone agg) as in foundation, filling and mass concrete, complete all as specified and directed by Engr-in-charge. | 2 | Cubic Metre | 6,711 ₹13,422 | 6,600 ₹13,200 | 6,850 ₹13,700 | 7,500 ₹15,000 | 8,563 ₹17,126 | 6,500 ₹13,000 Lowest | 7,000 ₹14,000 | 8,610 ₹17,220 |
| 3.00 | Material & Labour for (Porbandar stone of size 20cm x40 cm) Walling of squared rubble, regular coursed, well bonded, bedded and solidly hearted, built in cement mortar (1:4), complete all as specified and directed by Engr-in-charge. | 7 | Cubic Metre | 7,145 ₹50,015 | 7,075 ₹49,525 | 9,090 ₹63,630 | 7,500 ₹52,500 | 8,510 ₹59,570 | 7,000 ₹49,000 Lowest | 7,500 ₹52,500 | 9,610 ₹67,270 |
| 4.00 | Material & Labour for Rendering 15mm thick in cement mortar 1:4 on concrete/stone masonary surfaces finished even and fair without using extra cement, complete all as specified and directed by Engr-in-charge. | 5 | Square Metre | 366 ₹1,830 | 3,065 ₹15,325 | 3,161 ₹15,805 | 375 ₹1,875 | 3,910 ₹19,550 | 350 ₹1,750 Lowest | 450 ₹2,250 | 4,000 ₹20,000 |
| 5.00 | Returning filling in, including spreading leveling, watering and well ramming in layer not exceeding 25 cm in soft/loose soil, complete all as specified and directed by Engr-in-charge. | 120.4 | Cubic Metre | 114 ₹13,725.6 | 115 ₹13,846 | 247 ₹29,738.8 | 135 ₹16,254 | 305 ₹36,722 | 110 ₹13,244 Lowest | 125 ₹15,050 | 335 ₹40,334 |
| 6.00 | Removal of excavated soil to a distance not exceeding 50 Metre and depositing where directed at level not exceeding 1.5 Metre above the starting point, complete all as specified and directed by Engr-in-charge. | 15.6 | Cubic Metre | 321 ₹5,007.6 | 320 ₹4,992 | 357 ₹5,569.2 | 375 ₹5,850 | 305 ₹4,758 | 300 ₹4,680 Lowest | 350 ₹5,460 | 335 ₹5,226 |
| 7.00 | Material & Labour for RCC M-30, using 20mm graded stone aggregate for foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete, complete all as specified and directed by Engr-in-charge. | 2 | Cubic Metre | 7,199 ₹14,398 | 6,900 ₹13,800 Lowest | 8,100 ₹16,200 | 7,500 ₹15,000 | 88,654 ₹1,77,308 | 8,500 ₹17,000 | 8,900 ₹17,800 | 84,060 ₹1,68,120 |
| 8.00 | Material & Labour for RCC M-30 (using 20mm graded stone agg) as in Beams and alike, complete all as specified and directed by Engr-in-charge. | 4 | Cubic Metre | 7,199 ₹28,796 | 6,900 ₹27,600 | 8,100 ₹32,400 | 7,500 ₹30,000 | 5,050 ₹20,200 Lowest | 8,500 ₹34,000 | 8,900 ₹35,600 | 5,100 ₹20,400 |
| 9.00 | Material & Labour for RCC M-30, using 20mm graded stone aggregate, as in Columns, pillars, piers, posts and struts, complete all as specified and directed by Engr-in-charge. | 1 | Cubic Metre | 7,222 ₹7,222 | 6,900 ₹6,900 | 8,200 ₹8,200 | 7,500 ₹7,500 | 5,050 ₹5,050 Lowest | 8,500 ₹8,500 | 8,900 ₹8,900 | 6,540 ₹6,540 |
Tender Value
₹43.9 L
EMD Value
₹88,000
Closing Date
25 Mar 2026, 6:00 pmClosed
GE (I) CG PORBANDAR
COAST GUARD DHQ NO 1, OPP BIRLA FACTORY
PROVN OF SECURITY HOOTER AND INSTALLATION OF CEILING FAN AT INAZ VILLAGE ICGS VERAVAL AND PROVN OF FLAG MAST IN PARADE GROUND AT ICGS PIPAVAV UNDER GE (I) CG PORBANDAR
2026_MES_755338_1
8175A/E8
Open Tender
Civil Works - Others
Item Rate
180 days
VERAVAL
AS PER NIT
10 documents required · 10 mandatory
₹500
GE (I) CG PORBANDAR
₹88,000
Yes
11 May 2026
6 Mar 2026
27 Mar 2026
6 Mar 2026
25 Mar 2026
20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Schedule 'A' B/R | - | - | - | - |
| 1 | Excavation in trenches not exceeding 1.5 Metre wide and not exceeding 1.5 Metre in depth for foundation etc., not exceeding 10 Sqm on plan and not exceeding 1.5 Metre in depth and getting out in soft/loose soil, complete all as specified and directed by Engr-in-charge. | - | Cubic Metre | - | - |
| 2 | Material & Labour for Plain Cement Concrete 1:4:8 type D-2 (using 40mm graded stone agg) as in foundation, filling and mass concrete, complete all as specified and directed by Engr-in-charge. | 2 | Cubic Metre | - | - |
| 3 | Material & Labour for (Porbandar stone of size 20cm x40 cm) Walling of squared rubble, regular coursed, well bonded, bedded and solidly hearted, built in cement mortar (1:4), complete all as specified and directed by Engr-in-charge. | 7 | Cubic Metre | - | - |
| 4 | Material & Labour for Rendering 15mm thick in cement mortar 1:4 on concrete/stone masonary surfaces finished even and fair without using extra cement, complete all as specified and directed by Engr-in-charge. | 5 | Square Metre | - | - |
| 5 | Returning filling in, including spreading leveling, watering and well ramming in layer not exceeding 25 cm in soft/loose soil, complete all as specified and directed by Engr-in-charge. | - | Cubic Metre | - | - |
| 6 | Removal of excavated soil to a distance not exceeding 50 Metre and depositing where directed at level not exceeding 1.5 Metre above the starting point, complete all as specified and directed by Engr-in-charge. | - | Cubic Metre | - | - |
| 7 | Material & Labour for RCC M-30, using 20mm graded stone aggregate for foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete, complete all as specified and directed by Engr-in-charge. | 2 | Cubic Metre | - | - |
| 8 | Material & Labour for RCC M-30 (using 20mm graded stone agg) as in Beams and alike, complete all as specified and directed by Engr-in-charge. | 4 | Cubic Metre | - | - |
| 9 | Material & Labour for RCC M-30, using 20mm graded stone aggregate, as in Columns, pillars, piers, posts and struts, complete all as specified and directed by Engr-in-charge. | 1 | Cubic Metre | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
8175AT.pdf
Tender Documents • 4.45 MB
BOQ_846026.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .