Tender Value
₹43.9 L
EMD Value
₹44,000
Closing Date
14 Oct 2026, 6:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, U.L.B.C.Inv.Dn.No.2,Valod
Restoration work of Flood Damage of Bhatpur Distry & its minors.
350556
E Tender Notice No.6 of 2026-27
Open
Civil Works
Works
Tapi
13 documents required · 11 mandatory · 2 optional
₹1,500
Executive Engineer, U.L.B.C.Inv.Dn.No.2,Valod
₹44,000
30 Sept 2026
30 Sept 2026
30 Sept 2026
14 Oct 2026
30 Sept 2026
BILL OF QUANTITIESAquaduct
Name of work:- Restoration work of Flood Damage of Bhatpur Distry & its minors.
BILL OF QUANTITIES
Item Description of Item (with brief specification and Quantity Unit Rate in Amount in Rs.
No. reference to book of specifications) Figures
Removing of exiting disturbed C.C. Block lining including
1 opening of joints, stacking the same and disposing of stuff as 7324.70 m2 29.10
directed etc. complete with all leads and lifts.
Excavation of canal/drains in all sorts of soils (dry condition of
soil) including depositing the excavated stuff in uniform layers
in canal banks or in spoil banks or as and where directed
2 including dressing the canal section upto lead of 50 meter and 732.47 CM 74.20
all lift including clearing the site etc. complete (By machinery
for canal/drain maintanance) (upto 1.5 cumecs capcity of
Earthwork in embankment using selected soil, soft & hard
murrum excavated from approved borrow area/village tanks
3 etc.including breaking clods, dressing to the design section 3243.47 CM 67.00
with lead up to following .(By poclane machinary) (a) lead up
to 3.0 kilometer.
Compaction of selected soil/hard murrum/soft murrum in even
4 thickness of 15 to 20 cms including watering rolling of 3243.47 CM 12.40
suitable capacity etc. complete as directed.
Providing and laying plain/reinforced cement concrete lining
of M-15 grade in bed, side slope sand curvature including
batching, mixing, transporting placing, smooth finishing,
curing including dewatering where required. (machinary
based without Paver).
(a) 7.5cm thick lining in Bed & slope
5(a) (c) 15 cm thick lining in Bed & slope 120.40 m2 659.40
Dismentalling the R.C.C.work & disposing off the stuff
6 including stacking of the useful materials etc. complete as 48.00 CM 1747.70
directed. (a)Light reinforcement. (Main bar up to 16mm dia.)
Excavation for foundation in all sorts of soil including yellow,
sandy, gravelly soil, soft & hard murrum, etc. dry condition
7 including depositingtheexcavatedstuff inuniformlayers 169.23 CM 81.50
inbanksorasdirectedetc. complete for lead uo to 1.0 Km and all
lifts. (By machinery) (a) Above water table.
Providing and laying plain/reinforced Nominal Mix cement
concrete of various grade with cement, sand and coarse
aggregates including centering, shuttering, batching, mixing,
transporting, placing, vibrating, smooth finishing, curing etc.
8 complete for all lead and lift.(Manually With Conventional 26.37 CM 4479.80
Mixer, Including dewatering)
(B) Raft, Bottom slab of barel, footing of columns, piers,
abutment and bottom slab of sump etc. (ii) M-15 grade.
(C) Piers, abutment, wingwalls, headwall, returnwall etc. (iii)
M-20 grade.(1:1.5:3)
Providing and placing in position reinforcement bars including
9 cutting, bending welding, joints where necessary, hooking 16.79 Qtl 7194.00
etc.complete as per drawing for all lead and lifts. (b) TMT
10 Providing and fixing in position(different diameter) I.S NP3
class reinforced pipe with caulking the joints with cement
mortar 1:1 proportion using jutestring soaked in cement slurry,
finishing joints, and laying pipes to the designed grade and
levels, curing etc.complete for all lead and lifts.
(a) NP3 class 300mm dia pipe.
11 Backfiing the foundation trenches around the structures
etc.with selected excavated stuff including watering, ramming, 78.36 CM 19.50
compacting etc complete.(By machinary)
Providing video graphy on the ocassion of function or for
12 ongoing construction work including dubbing, titeling etc. 1.00 4Hrs 1230.51
complete including cost of cassette/CD (b) Up to 4.00 hours
Schedule B Page
BILL OF QUANTITIESAquaduct
Item Description of Item (with brief specification and Quantity Unit Rate in Amount in Rs.
No. reference to book of specifications) Figures
I/We am/are willing to carry out the work at _________________________________________________________________ %
* Estimated Amount put to tender * Estimated Amount put to tender
*(Please strike out whichever is not applicable).
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
SIGNATURE OF CONTRACTOR Executive Engineer
U.L.B.C.Inv.Dn No.2
Schedule B Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD FDR Bhatpur.pdf
Sch B Bhatpur.pdf
E Tender Notice No.6 of 2026-27 for upload.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .