Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Finance 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | L1 | Admitted-Finance | |
| 2 | L2₹5.0 L+₹17,934.47 (3.72%)Admitted-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical AT ARGADA DISTT RAMGARH JHARKHAND | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | M/S ADITYA ENTERPRISES L1 | coalfields engineering works L2 |
|---|---|---|---|---|---|
| 1.00 | Cost of Copper wire/strip | 390 | Kg | 1,228 ₹4,78,920 Lowest | 1,265 ₹4,93,350 |
| 2.00 | Cost of insulating materials | 1 | Job | 71,838 ₹71,838 Lowest | 74,002.5 ₹74,002.5 |
| 3.00 | Less Scrap Value | 1 | No. | 2,87,352 ₹-2,87,352 Lowest | 2,96,010 ₹-2,96,010 |
| 4.00 | Labour cost | 1 | Job | 71,838 ₹71,838 Lowest | 74,002.5 ₹74,002.5 |
| 5.00 | Cost of LT Side Bushing insulator with studs | 2 | Nos | 6,500 ₹13,000 Lowest | 7,168 ₹14,336 |
| 6.00 | Filtration of Transformer Oil | 600 | Ltr | 30 ₹18,000 Lowest | 33 ₹19,800 |
| 7.00 | Contractor Profit | 1 | Job | 37,136.4 ₹37,136.4 Lowest | 38,518.1 ₹38,518.1 |
| 8.00 | Cost of Gasket/Corksheet | 2 | Nos | 2,560 ₹5,120 Lowest | 2,850 ₹5,700 |
| 9.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 73,530.07 ₹73,530.07 Lowest | 76,265.84 ₹76,265.84 |
Tender Value
₹4.5 L
EMD Value
₹5,600
Closing Date
4 Sept 2025, 4:00 pmClosed
PE(EnM), Gidi-A
Office of the PE(EnM), Gidi-A
Repairing and rewinding of one no. 500KVA, 3.3KV/440Volt, Oil cooled Transformer at Gidi-A Colliery under Argada Area.
2025_CCL_342454_1
PE(EnM)/GDW/eNT/25-26/06 Dated 26.08.2025
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
Gidi-A Project
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,600
10 Oct 2025
26 Aug 2025
5 Sept 2025
27 Aug 2025
4 Sept 2025
27 Aug 2025
27 Aug 2025 - 4 Sept 2025
Amount
Cost of Copper wire/strip
Cost of insulating materials
Less Scrap Value
Labour cost
Cost of LT Side Bushing insulator with studs
Filtration of Transformer Oil
Contractor Profit
Cost of Gasket/Corksheet
Total impact of GST for the purpose of CTC
coalfields engineering works (BID ID -1180500)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .