Tender Value
Refer Docs
EMD Value
₹84,000
Closing Date
30 Sept 2026, 3:00 pm3d left
SE Ayodhya Circle
SE ayodhya Circle office complex Angoori bagh Ayodhya
CONSTRUCTION OF BOUNDARY WALL OF KASTURBA GANDHI BALIKA VIDYALAYA AT BHADAIYAN DISTT. SULTANPUR AND CONSTRUCTION OF SEPTIC TANK AT AMETHI DISTT AMETHI (U.P.)
2026_UPHDB_1188444_1
1635/M-10/445 Dated 14-09-2026
Open Tender
Civil Works
Percentage
180 days
Sultanpur Amethi
Technical Bid
3 documents required · 3 mandatory
₹1,770
Executive Engineer CD Ayodhya-02
₹84,000
22 Sept 2026
22 Sept 2026
30 Sept 2026
22 Sept 2026
30 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil 0.30 m & Avobe | 321.03 | CUM | 129.24 | ₹41,489.92 |
| - | Providing and laying in cement concrete 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). excluding the cost of centering and shuttering . | 32.93 | CUM | 4,960.03 | ₹1,63,333.79 |
| - | Providing and laying in position specfied grade of reinforcement cement concrete, excluding the cost of centering,shuttering,finishing & reinforcement. All work up to plinth level.1:1.5:3 (1 cement,1.5 coarse sand zone-iii,3 graded stone aggregate 20mm. (Nominal size) | 88.32 | CUM | 6,586.49 | ₹5,81,718.8 |
| - | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 16.02 | CUM | 7,902.37 | ₹1,26,595.97 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chaijjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone- lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 11.45 | CUM | 8,377.51 | ₹95,922.49 |
| 6.1 | Centering,shuttering inluding strutting,proping etc. & removal of form for.
Foundations, footings, bases of columns, etc. for mass concrete | 120.55 | SQM | 285.54 | ₹34,421.85 |
| 6.2 | Lintels, beams, plinth beams, girders, bressumers and
cantilevers. | 265.2 | SQM | 536.2 | ₹1,42,200.24 |
| 6.3 | Columns, Pillars, Piers, Abutments, Posts and Struts. | 290.4 | SQM | 699.95 | ₹2,03,265.48 |
| 6.4 | Suspended floors, roofs, landings, balconies and access platform | 17.5 | SQM | 687.9 | ₹12,038.25 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class-150 in foundation & plinth in. Cement morter 1:6 (1
cement:6 coarse sand) | 56.58 | CUM | 6,102.03 | ₹3,45,252.86 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.80 MB
TBhadaiyan.pdf
Tender Documents • 20.50 MB
FBhadaiyan.pdf
Tender Documents • 36.81 MB
BOQ_2238838.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .