| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹52.8 LAccepted-AOC HOUSE NO M 28 R R I T COLONY AT WARD NO 08 PO RANGADHAMA DIST SUNDARGARH PIN 770002 | SUNDARGARH | SUNDARGARH | ODISHA | 770002 | ₹52.8 L | 1st | Accepted-AOC 1st lowest in lottery |
| 2 | 1st₹52.8 LRejected-AOC | ₹52.8 L | 1st | Rejected-AOC Not qualified |
| 3 | 1st₹52.8 LRejected-AOC JAGANNATHPOSH HAMIRPUR PANCHAMAHALA SUBDEGA SUNDARGARH | MALKANGIRI | ODISHA | 764044 | ₹52.8 L | 1st | Rejected-AOC Not qualified |
| 4 | 1st₹52.8 LRejected-AOC AT WORDNO 15 PS BOUCH TOAN DIST BOUCH PIN 762014 | BOUDH | ODISHA | 762014 | ₹52.8 L | 1st | Rejected-AOC Not qualified |
| 5 | 1st₹52.8 LRejected-AOC | ₹52.8 L | 1st | Rejected-AOC Not qualified |
Tender Value
₹62.1 L
EMD Value
₹62,056
Closing Date
16 Dec 2025, 5:00 pmClosed
Project Administrartor
ITDA sundargarh
Construction of Additional classroom at Chakramal Ashram School in Tangarpali Block
2025_STSCD_121904_2
ITDASNG-05/2025-26
National Competitive Bid
Civil Works - Buildings
270 days
Sundargarh
As per DTCN
2 documents required · 2 mandatory
₹10,000
₹62,056
Yes
9 Apr 2026
28 Nov 2025
17 Dec 2025
28 Nov 2025
16 Dec 2025
28 Nov 2025
Earth work excavation of foundation in hard or gravelly soil within initial lead of 50m and initial lift of 1.5m including dressing the sides, leveling the bed and depositing the excavated materials away from the work site, shoring etc if required, complete the item of work in all respect as per direction of the Engineer-in-charge.
Filling foundation and plinth with filling sand laying in layers including ramming, watering, compacting including cost, conveyance and royalty of sand from approved quarry and other taxes if any with all leads, lifts, T&P etc complete the items of work in all respect as per specification and direction of Engineer in charge.
Filling foundation and plinth with sand well watered and rammed with cost of all materials labor etc. complete.
CC (1:3:6) using 40 mm size and down graded crusher broken HG stone metal free from weathered surface of approved quality from approved quarry in foundation and plinth including laying concrete in layers with due compaction, watering and curing including cost, conveyance, royalty and taxes of all materials with all lead, lifts and delifts, T&P etc required for completion of the work in all respect as per direction of the Engineer-in-charge.
RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all taxes of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge.
Column base & Footing
Plinth Bend
Lintel Bend
First floor
Chhaja
First floor
Column & Beam
First floor
2nd Floor
Roof Slab
First floor
2nd Floor
Staircase
First floor
Labour charges for straightening coiled or bent up MS rods including cutting, bending and welding if required and tying the grills, laying and placing in proper position as per design including cost, conveyance, , taxes etc of tested MS/TS rod with testing data of required specification & cost of binding wires of 18 to 20 gauge, labour, T&P required for the work complete and as per the specification and direction of the Engineer-in-charge.
First floor
2nd Floor
Brick work with Fly Ash Bricks in cement mortar (1:6) in foundation & plinth including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.
Brick work with Fly Ash bricks in cement mortar (1:6) in superstructure including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge.
First floor
2nd Floor
Providing and supplying M.S. doors and windows of approved design made out of M.S. angle frame and C.R. sheet with all cost etc.
First floor
2nd Floor
Window
First floor
Grill
First floor
Labour for fitting fixing of M.S. door and window etc all complete
First floor
2nd Floor
2.5 cm thick grading concrete in CC (1:2:2) on roof slab using 6mm hard granite chips including cost, carriage and royalty of materials complete.
First floor
2nd Floor
12mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.
First floor
2nd Floor
16mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.
First floor
2nd Floor
Supplying, fitting and fixing vitrified tile (Plain) in floors of size 600mm x 600mm of approved make conformaing to IS : 13755 laid on 20 mm thick cement mortar (1:4) (1 cement :4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of E.I.C.
First floor
Fixing Vitrified tiles (size 600mmx600mm) (Plain) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including cost, carriage, cost of all labour etc. complete.
First floor
Fixing granite tile (Above 0.40 Sqm) (20mm thick) in floors treads or steps and landing on 20mm thick bed of cement mortar 1:4 (1cement : 4sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost, carriage, royalty & taxes of all material, cost of all labour T&P etc. complete.
First floor
Fixing Granaite tiles in dado, skirting & riser of steps. Etc complete
First floor
Finishing wall surface of walls with cement based wall putty ( water based ) with all cost etc.
First floor
2nd Floor
Priming one coat with any approved primer (Plaster surface) with all cost etc.
First floor
2nd Floor
Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mmx32mmx2mm @ 0.90m C/C and stainless square pipe bracing of size 32mmx32mmx2mm in 3 rows in staircase as per approved design and specification, buffing, polishing etc. with cost, conveyance, taxes of all materials, labour, T&P etc. required for completion of work in all respect as per direction of Engineer-in-charge.
First floor
Painting two coats of synthetic enamel paint over a coat of primer of approved quality, brand and shade including smoothening the surface by sand paper and filler etc complete with cost, conveyance, royalty, taxes of all materials, labours T&P required as per specification and direction of Engineer-in-charge.
First floor
2nd Floor
Finishing to walls with two coats distemper over a coat of primer of approved brand with putty and approved colour and shade including cleaning the surface with cost, conveyance, royalty taxes of all materials labour T&P and scaffolding as required for the work and as per specification and direction of Engineer-in-charge.
First floor
2nd Floor
Finishing to walls with two coats weather coat over one coat primer including cleaning the surface with cost, conveyance, royalty taxes of all materials labour T&P and scaffolding as required for the work and as per specification and direction of Engineer-in-charge.
First floor
2nd Floor
stage.html
html • 0.07 MB
technical_566704.pdf
techsummary_566704.pdf
finance_566704.pdf
BOQ Comparative Chart
xlsx
finsummary_566704.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
DTCN2.pdf
Tender Documents • 1.90 MB
BOQ_566704.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid