Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.0 LAccepted-AOC | ₹36.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹42.8 L+₹6.8 L (19.0%)Rejected-AOC KORATHARA KANNADY P O PULINCUNNOO ALAPPUZHA | PULINCUNNOO | ALAPPUZHA | KERALA | ₹42.8 L+₹6.8 L (19.0%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Thomas Joseph L2 | PK CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Appendix 1 - Outer bund protection with Pile and slab construction works | |||||
| 1.00 | OD37753/2025-2026:Providing,and conveying Pre-cast reinforced cement concrete piles of
specified
size in M-25 cement concrete to carry safe working load not less than specified, including
centering,
shuttering, etc. complete but excluding the cost of steel reinforcement. (Length of pile for
payment shall be
measured from top of the shoe to the top of pile cap). | 336 | 1 meter | 4,052 ₹13,61,472 | 3,400 ₹11,42,400 Lowest |
| 1.00 | OD37754/2025-2026:Driving and installing Pre-cast reinforced cement concrete piles of
any size and
length in M-25 cement concrete , etc. complete | 196 | 1 metre | 1,370 ₹2,68,520 | 1,200 ₹2,35,200 Lowest |
| 1.00 | OD37757/2025-2026:Providing,conveying, hoisting and fixing precast reinforced cement
concrete in
slabs including setting in cement mortar 1:3 ( 1 cement : 3 coarse sand), cost of required
centering,
shuttering and finishing with neat cement punning on exposed surfaces but excluding the cost of
reinforcement, with machine batched and machine mixed design mix M - 25 grade cement
concrete | 16.2 | cum | 22,580 ₹3,65,796 | 19,500 ₹3,15,900 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 7.88 | cum | 303 ₹2,386.13 | 250 ₹1,968.75 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 127.41 | sqm | 455 ₹57,969.28 | 401 ₹51,089.41 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 17.95 | cum | 12,371 ₹2,22,121.31 | 10,400 ₹1,86,732 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 13,183.15 | kilogram | 132 ₹17,40,175.8 | 109 ₹14,36,963.35 Lowest |
| 1.01 | OD37756/2025-2026:Protecting the filled earth through gap using Geo- fabric filter GWF -
26-130 as per the direction from the departmental officers at site including all cost of material , labour ,
conveyance and all other incidental charges involved etc.complete. | 249.9 | sqm | 113 ₹28,238.7 | 100 ₹24,990 Lowest |
| 1.01 | OD38341/2025-2026:Earthwork in rough excavation banking excavated earth in layers not exceeding 20 cm in
depth,breaking clods and dressing up in embankment for roads ,flood banks,marginal banks and
guide banks with all leads and lifts in all kinds of soil(based on DSR 2.2.1-2.4-2.5+20% )under
excavation in stiff kayal clay. | 169.05 | cum | 1,369 ₹2,31,429.45 | 1,200 ₹2,02,860 Lowest |
Tender Value
₹39.0 L
EMD Value
₹50,000
Closing Date
11 Jun 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
Office of Executive Engineer KD Division Mancompu
GENERAL Flood mitigation programme in Kavalam Panchayath in Kuttanad Assembly Constituency Pile and Slab Protection work for Mangalam Manikkamangalam Padashekharam Reach new breach portion General Civil Work
2026_Irrig_853948_1
IRR/KP/TR/7684/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
540 days
Kavalam Panchayat
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,760
Yes
₹50,000
Yes
16 Sept 2026
3 Jun 2026
15 Jun 2026
3 Jun 2026
11 Jun 2026
3 Jun 2026
3 Jun 2026 - 11 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix 1 - Outer bund protection with Pile and slab construction works | |||||
| 1.001 | OD37753/2025-2026:Providing,and conveying Pre-cast reinforced cement concrete piles of
specified
size in M-25 cement concrete to carry safe working load not less than specified, including
centering,
shuttering, etc. complete but excluding the cost of steel reinforcement. (Length of pile for
payment shall be
measured from top of the shoe to the top of pile cap). | - | 1 meter | - | - |
| 1.002 | OD37754/2025-2026:Driving and installing Pre-cast reinforced cement concrete piles of
any size and
length in M-25 cement concrete , etc. complete | - | 1 metre | - | - |
| 1.003 | OD37757/2025-2026:Providing,conveying, hoisting and fixing precast reinforced cement
concrete in
slabs including setting in cement mortar 1:3 ( 1 cement : 3 coarse sand), cost of required
centering,
shuttering and finishing with neat cement punning on exposed surfaces but excluding the cost of
reinforcement, with machine batched and machine mixed design mix M - 25 grade cement
concrete | 1 | cum | - | - |
| 1.004 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.005 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | - | sqm | - | - |
| 1.006 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.007 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.008 | OD37756/2025-2026:Protecting the filled earth through gap using Geo- fabric filter GWF -
26-130 as per the direction from the departmental officers at site including all cost of material , labour ,
conveyance and all other incidental charges involved etc.complete. | - | sqm | - | - |
| 1.009 | OD38341/2025-2026:Earthwork in rough excavation banking excavated earth in layers not exceeding 20 cm in
depth,breaking clods and dressing up in embankment for roads ,flood banks,marginal banks and
guide banks with all leads and lifts in all kinds of soil(based on DSR 2.2.1-2.4-2.5+20% )under
excavation in stiff kayal clay. | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1443246.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tendernotice_2.pdf
PDF • 3.75 MB
BOQ_1443246.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .