Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 Cr+₹15.2 L (10.5%)Rejected-AOC | ₹1.6 Cr+₹15.2 L (10.5%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.6 Cr+₹18.9 L (13.1%)Rejected-AOC GROUND FLOOR 1 MELARMAITH AGARTALA TRIPURA W | AGARTALA | TRIPURA | ₹1.6 Cr+₹18.9 L (13.1%) | L3 | Rejected-AOC L3 |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
27 Jan 2023, 3:00 pmClosed
Executive Engineer, Agartala Division No.I
Executive Engineer, Agartala Division No.I
Special Repair, Conservation and Beautification of Ujjaytanta Palace and South Entrance Gate at Agartala, Tripura
2023_CEPWD_36737_1
CE(Buildings)/PWD/DNIT/ACE/Pro
Open Tender
Civil Works - Building
Works
60 days
AGARTALA
Please refer Tender documents.
7 documents required · 7 mandatory
₹8,000
₹3.4 L
28 Mar 2023
13 Jan 2023
27 Jan 2023
13 Jan 2023
27 Jan 2023
13 Jan 2023
Amount
Providing and laying POP on the existing flooring upto required thick 40mm to protect the Floor during retrofitting work and removal of the same after completion of work all including cost of materials, labour, equipments, transporting , lead, lift tools etc all including disposal of debris etc complete
Providing and applying washable acrylic co-polymer penetrating silane-siloxane coating upto NOT LESS THAN 200 micron DFT which shall be . High Performance Anticarbonation, high resistance to C02/S02/chloride ions diffusion, resistance to UV rays, elastoplastic, including skilled labours as per the manufactures specification including tools , tackles etc. complete, including water repellent coating over the painted surface as per manufacturer specification.. Surface preparation All surfaces should be dry and free from contamination such as oil, grease, loose particles, decayed matter, moss, algae growth, laitance, and all traces of mould release oils and curing compounds. This is best achieved by lightly grit blasting the surface. Where moss, algae or similar growths have occurred, treatment with a proprietary biocide should be carried out after the grit blasting process.
Removal of existing plaster on external, internal walls, towers upto any thick wherever found required including deep raking the joints , providing suitable treatment to remove the formation of alkali salts rinsing with hot water or by chemical wash (if required) without eroding the brick surface etc. complete including materials, chemicals, cost of labour, tools and tackles complete including wetting/damping or drying the wall etc. complete and disposal of debris etc complete
Providing and applying composite polymer Stucco plaster upto required thick to match the existing profile with appropriate Mix with addition of Polypropylene Fibre as per manufacture specification and admixture to minimums the permeability over an bond coat of SBR cement slurry for both negative cast (if required) and finishing coat , finish coat shall be 1:1 stucco (1: Cement, 1: fine Marble powder, mixed with wtaer:SBR at the rate of 1:1 ratio i.e. 1 water: 1 SBR) upto 1mm to 5mm thick by brush or towelled smooth or floated etc as per the requirement including materials, skilled masons, curing etc., complete., Existing masonry joints which are exposed shall be deep raked and repointed before plastering.
Providing and laying cement concrete 1:1.5:3 (1 cement : 1.5 fine sand : 3 graded stone aggregate 6mm done chips of 10mm to 20 mm depending on the site condition) with addition of Polypropylene fibre as per manufactures specification or at the rate of 200 gms per one bag of cement and admixture at the rate of 200 ml per bag of cement etc. mixing, pouring, levelling, curing etc including lift etc. complete for PCC flagging or wherever required.
Providing and fixing seismic element, fixing with epoxy/Micro concrete as per manufactures specification, drilling 10mm/20mm dia hole upto a depth of 100mm, cleaning the holes with blowers etc. and fixing connectors with 8mm steel upto a length of 100mm including cutting and bending with labour, equipment, machinery etc. complete wherever required, as per the seismic requirements etc complete
loading and Unloading of stone boulder, stone aggregate, brick aggregate, Kankar, earth crushed slag, stone for masonry work by mechanical means including a lead up to 10Km
Finishing all architectural elements like kumbha tadi, stylobate, stambham , kalasa, fillet, flute , arrises, annulets , hypotrachelion etc, echinus, abacus, volute, resete if any etc for mix doric , carinthian orders etc complete including skilled sculptor etc complete with all tooles and tackles Brick work (precast or siteinto), cement concrete both (RCC & PCC), shear connectors, centering, Reinforcement, scaffolding etc shall be paid seperately
Finishing all architectural elements like ovola , cuma recta , cyma reverse , any dentils , combined with any type of anthemion, fillets astragal , corona , cavetto , corona , scotia , torus, fillet etc including skilled sculptor etc complete with 1 : 1 : 6 (1 Cement, 1 Lime, 6 River Sand) with addition of Polypropylene Fibre as per manufacture's specification and admixture to minimize the permeability over an bond coat of SBR cement slurry for both negative cast (if required) and finishing coat. Finishing coat shall be 1 : 1 stucco (1 Cement, 1 Fine Marble powder, mixed with water : SBR at the rate of 1 : 1 ratio i.e. 1 water: 1 SBR) brick work, shear connectors, centering, Reinforcement, scaffolding etc shall be paid seperately
Finishing all architectural elements like crepidoma of any modul, entasis , coveing three set of pediment type , frieze , cornice moulding with baton/canal/ tyochilas/ovolo/gorg/ cymatium,dourcioc etc , semicircular bargeboards with mouldings with acroterion , mutules , guttae , triglyph , tania, rugula etc, intrados,sets of frieze,cornice, four Colossal comppier type (doric or any order) with echinus, necking,astragal etc including shaft,Torus, sole, arrises , flutes or equ , rest,of any type, four corif, two moulded scrolled, fiscial etc complete with applying composite Stucco plaster upto required thick to match the existing profile with 1:1:6 (1:Cement,1:Lime, 6: River Sand) with addition of Polypropylene Fiber per manufacture specification and admixture to minimums the permeability over an bond coat of SBR cement slurry for both negative cast (if required) and finishing coat , finish coat shall be 1:1 stucco (1: Cement, 1: fine Marble powder, mixed with wtaer:SBR at the rate of 1:1 ratio i.e. 1 water: 1 SBR) upto 1mm to 5mm thick by brush or troweled smooth or floated etc as per the requirement including materials, skilled sculptor curing etc., complete The negative shape shall be brought with first class brick bates.(If the ornament found to be more than 50 mm thick reinforcement shall be anchored with epoxy ) Brick work (precast or siteinto), cement concrete both (RCC & PCC), shear connectors, centering, Reinforcement, scaffolding etc shall be paid seperately
Providing and applying one cement primer of approved brand and manufacture on wall surface complete. Ground Floor Walls, ceiling etc where ever found required including damping wall tools tackles brush etc complete
Wall Painting with plastic Emulsion paint (one or More Coat) of required color of approved brand and manufacture on new work to give an even shade including tools tackles etc complete
Providing and applying a layer of epoxy rasin fairing coat at 1mm thickness on the external/internal surface of the wall. The epoxy fairing coat should be a two component thixotropic, solvent free, compound based on epoxy resins, graded fillers and thixotropic agents. It is applied directly to concrete substrates, without primer, and cures to a surface ready for over coating.
Providing and laying 110mm dia PVC pipes (6 kgs/cm2) including bends, specials, couplings, clamps, sealing the joints with jointing solutions and labour etc. complete for sanitary lines, rainwater down take etc. wherever found required.
Providing and applying Polyurethane polishing on wooden surface,which shall protect against dust, weathering, abrasion, and other processes which damage it with PU polish over time. The Polish PU protects moisture, scratches, dust, water, UV radiation, and weathering, etc complete including labour, tooles tackels etc complete.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
(i) Thermo-Mechanically Treated bars of grade Fe-500D or more
First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:-
In cement mortar 1:5 ( 1 cement : 5 fine sand ).
Providing and fixing Marble stone in floors over 20 mm thick bed of cement mortar 1 : 4 ( 1 cement : 4 fine sand ) jointed with ordinary cement slurry including pointing with white cement mixed with of matching shade, including rubbing and polishing complete
BBR INDIA PVT LTD
AIR ENGINEERING
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_37318.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .