| 1 | L1₹11.5 LAccepted-AOC 106 AGARWAL AND COMPANY PROFESSOR COLONY OPP OF WALL FORT CITY RING ROAD NO 01 RAIPUR CHHATTISGARH 492001 | RAIPUR | CHHATTISGARH | 492001 | L1 | Accepted-AOC BEING THE LOWEST BIDDER | |
| 2 | L2₹15.9 L+₹4.4 L (37.8%)Rejected-Finance 74 AJANTA COMMERCIAL CENTRE ASHRAM ROAD AHMEDABAD 380014 | AHMEDABAD | AHMEDABAD | GUJARAT | 380014 | L2 | Rejected-Finance OTHER THAN THE LOWEST BIDDER | |
| 3 | L3₹15.9 L+₹4.4 L (38.5%)Rejected-Finance 274 210 DAFNALA ROAD SHAHIBAUG AHMEDABAD GUJARAT 380009 | AHMADABAD | GUJARAT | 380009 | L3 | Rejected-Finance OTHER THAN THE LOWEST BIDDER | |
| 4 | L4₹16.1 L+₹4.6 L (39.9%)Rejected-Finance | L4 | Rejected-Finance OTHER THAN THE LOWEST BIDDER | |
| 5 | L5₹16.2 L+₹4.7 L (40.5%)Rejected-Finance 200 NAVAGAM NAVAGAM TA SAYLA SURENDRA NAGAR GUJARAT 363430 | SURENDRANAGAR | GUJARAT | 363430 | L5 | Rejected-Finance OTHER THAN THE LOWEST BIDDER |
Tender Value
Refer Docs
EMD Value
₹33,000
Closing Date
12 May 2020, 6:00 pmClosed
GE AF CHILODA
VAYU SHAKTI NAGAR CHILODA
MANNING AND OPERATION OF CENTRALISED PLANT 350 TR-02 NOS, 50 TR-03 NOS AND DG SET INSTALLATIONS AT HQ SWAC OF VAYU SHAKTI NAGAR CHILODA
2020_MES_336505_1
8805/20-21/E8
Open Tender
Miscellaneous Works
Item Rate
215 days
VAYU SHAKTI NAGAR CHILODA
AS PER NOTICE OF TENDER
8 documents required · 8 mandatory
₹500
Yes
GE AF CHILODA
₹33,000
Yes
26 May 2020
27 Mar 2020
14 May 2020
27 Mar 2020
12 May 2020
30 Apr 2020
27 Mar 2020 - 10 Apr 2020
Amount
Out sourcing of services for Manning and & Operation of Central Air Conditioning plant at HQ SWAC, AF Stn Chiloda with appropriate categories of industrial personnel (Operator)/Ref Mech in one shifts (01) of 08 Hours each per day at AC Plant as per working hours of HQ SWAC complete all as directed by Engr-in-charge . Consisting under and contractor responsibilities of maintaining the following :- (a) Water Chiling Maching 350 TR - 02 Nos (02 Nos Working) (b) Pumps for chilled water, Condensor water, Primary Pumps, Secondary Pumps, Draining out of Plant complet. (c) Cooling tower of Capacity 350TR - 02 No (d) Valrious capacity of AHUs-24 Nos
(e) All types/sizes of Pipes and valves in Plant Room and AHUs Rooms (f) various sizes of Dudcting (g) All LT Panels/AHU Panels/APFC Panels (h) All types/sizes of cables & Earthings (j) Transfomer, VCB, Busbar trunking, Voltage Stablizers, RMU Etc (k) Internal Fixtures at AC Plant Room (l) Running record to AC plant wih log sheets. (m) Sundry works such as temperature maintaining inside building/each room, repair to minor leakage, seepage if any all as directed by Engr-in-charge.
Out sourcing of services for Manning and & Operation of Central Air Conditioning plant at 'B' Block HQ SWAC, AF Stn Chiloda with appropriate categoriesof industrial personnel (Operator)/Ref Mech in three shifts (03) of 08 Hours each per day at AC Plant . Consisting under :- (a) Water Chiling Maching 50 TR - 03 Nos (02 Nos Working+one No Standby) (b) Pumps for chilled water, Condensor water, Primary Pumps, Secondary Pums (c) Cooling tower of Capacity 50TR - 03 No (d) Valrious capacity of AHUs-04 Nos (e) All types/sizes of Pipes and valves in Plant Room and AHUs Rooms
(f) Dudcting (g) All LT Panels/AHU Panels/APFC Panels Earthing etc (h) All types/sizes of cables (j) Internal Fixtures at AC Plant Room (l) Running record to AC plant wih log sheets. (m) Sundry works such as temperature maintaining inside building/each room, repair to minor leakage, seepage if any all as directed by Engr-in-charge.
Out sourcing of services for Manning and & Operation of DG Sets installed at various locations of HQ SWAC AF Stn Chiloda with appropriate categories of highly skilled DG set operator in three shifts (03) of 08 hours per day each for proper operating of the following: (a) All types/sizes of cables (b) All types capacity of LT Panel, AHU Panels and earthings etc. (c) Log sheet of DG set with running records (Sample to be collected from office of AGE E/M sub division)
Notes for Item No. 1.00 to 3.00 above:-
Electricians hand tools, tester, Meggar or test lamp,safety shoes and hand gloves suitable for working pressure 1100 Volts and tested up to 11000 Volts, discharge rod upto 11000 Volts, pipe wrench upto 300 mm, taflon tape, earth tester, multimeter, tounge tester, First Aid kit with standard kit, proper sitting arrangement to operator at Installation, torch light, cleaning material shall be provided by the contractor without any extra cost.
DHPP for running of DG set shall be issued by department and proper record to maintain by the contractor all as directed by Engineer - in - Charge.
Rates quoted shall be including minor repair as per daily weekly or monthly check.
Electrcity as required shall be made available to the contractor free of cost by department.
Contractor shall also maintain the DG daily log sheets for running of DG set as per format and all as specified and directed by Engineer in charge.
Cleaning of installation premises, plant machinery alongwith building and surrounding area complete shall be all responsibility of contractor.
Emergency light will be provided by the contractor during night hours without any extra cost.
All safety precautions as per IE rules should be strictly followed by contracted employees & department shall not be held responsible for any untowards incident.
Attendence Register of Staff Employed will be maintained by JE E/M. If any labour found absent, necessary penalty/recovery will be made by Engineer-in-charge as per CA clause.
The contractor should always keep in mind that it is only the services of these contract labours is outsourced & not manpower. So providing reliever will be sole responsibility of contractor.
Qualification & experience certificate of contracted labours should be produced by contractor and shall also be forwarded to E-8 for technical check.
Contractor has to produce Photo ID of the staff employed with security pass number issued by Main Guard Room Air force Station.
Staff employed will be given 2 sets of uniform by the contractor with Name and Logo of MES.
GST / EPF paid certificate, attendance of employee etc. shall be enclosed with RAR.
The payment to every staff employed on work shall be made in the Aadhaar linked bank account through account payee cheque only and details of Payment, GST, EPF etc shall be forwarded with RAR by concerned JE E/M .
Note for Item No. 01 and 02: (a) Ref Mech Minimum ITI, Diploma holder in Mechanical/Minimum 5 to 10 Years experience in particular field (Air Conditioning) operating of above mentioned equipments.
Electricals India
ALBA AC AND REF SERVICES
Dighard Electricals
ARTI CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .