| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.5 CrAccepted-AOC | L1 | Accepted-AOC lowest | |
| 2 | L2₹28.6 Cr+₹1.9 L (0.07%)Rejected-AOC | L2 | Rejected-AOC 2nd lowest | |
| 3 | L3₹29.6 Cr+₹1.1 Cr (3.69%)Rejected-AOC | L3 | Rejected-AOC 3rd lowest | |
| 4 | L4₹30.5 Cr+₹2.0 Cr (6.94%)Rejected-AOC | L4 | Rejected-AOC 4th lowest | |
| 5 | L5₹34.2 Cr+₹5.7 Cr (19.9%)Rejected-AOC | L5 | Rejected-AOC 5th lowest |
Tender Value
₹32.2 Cr
EMD Value
₹5 L
Closing Date
17 Aug 2023, 3:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF THE SUPERINTENDING ENGINEER,KWA,PH CIRCLE, THANA, KANNUR
Construction Of 2.5LL OHSR at Pandy-Laying Distribution System and Providing FHTCs
2023_KWA_593952_1
75/2023-24/PHC/KNR
Open Tender
Civil Works - Water Works
Item Rate
180 days
DELAMBADY
Please refer Tender documents.
10 documents required · 10 mandatory
₹19,518
₹5 L
KWA,PH CIRCLE, THANA, KANNUR
1 Nov 2023
8 Aug 2023
18 Aug 2023
8 Aug 2023
17 Aug 2023
10 Aug 2023
10 Aug 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A-Construction of 2.5LL capacity OHSR at PANDY | |||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.002 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 0.6 | cum | - | - |
| 1.003 | 100.41.40:Supply, stacking, spreading and consolidating of Red earth in the trench of pipe line for cushion including carriage, loading, unloading & stacking up to any lead. | 1 | cum | - | - |
| 1.004 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 1.005 | 5.37.1:Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately.All wiork upto plinth level | 1 | cum | - | - |
| 1.006 | 5.37.2:Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately.All work above plinth level upto floor V level | 1 | cum | - | - |
| 1.007 | 5.34.1:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum). | 1 | cum | - | - |
| 1.008 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.009 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1 | sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NITVI.pdf
Tender Notice • 1.45 MB
NITVII.pdf
Tender Notice • 4.56 MB
TechnicalBid.xls
BOQ Document • 0.18 MB
BOQ_880376.xls
BOQ Document • 0.41 MB
126778507.pdf
Tender Document • 0.69 MB
126778508.pdf
Tender Document • 0.13 MB
126778510.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .