| Sl No | Description | Qty | Unit | THILLAI CONSTRUCTION L2 | SRI HARI RAMAJAYAM CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Rejuvenation of T.Edaiyapatti Poolang Kulam | |||||
| 2.00 | Clearing the Scrub jungle | 3,706.75 | sqm | 5.99 ₹22,203.43 | 5.93 ₹21,981.03 Lowest |
| 3.00 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete | 12,138 | cum | 58.16 ₹7,05,946.08 | 57.58 ₹6,98,906.04 Lowest |
| 4.00 | Add to relevant T.N.D.S,S. N0 20.A, rates for new tank bands and Closing breaches for extra watering and consolidation By Power roller (W0070) | 8,124 | cum | 43.27 ₹3,51,525.48 | 42.84 ₹3,48,032.16 Lowest |
| 5.00 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete.having width up to 3m (W0087) | 210 | cum | 34.27 ₹7,196.7 | 33.93 ₹7,125.3 Lowest |
| 6.00 | Providing Boundry Stone | 8 | Nos | 1,118.07 ₹8,944.56 | 1,107 ₹8,856 Lowest |
| 7.00 | Provision for Name Board | 1 | Nos | 4,500 ₹4,500 Lowest | 4,500 ₹4,500 Lowest |
| 8.00T.Edaiyapatti Ammankulam | |||||
| 9.00 | Clearing the Scrub jungle | 3,227.26 | sqm | 5.99 ₹19,331.29 | 5.94 ₹19,169.92 Lowest |
| 10.00 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete | 16,387 | cum | 58.16 ₹9,53,067.92 | 57.58 ₹9,43,563.46 Lowest |
Tender Value
₹59.3 L
EMD Value
₹60,000
Closing Date
17 Apr 2025, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Rejuvenation Of Poolangulam,Ammankulam,Pothikai Kulam,Odappa Kulam,Chetti Kulam,Kadan Kulam,Arumugapillai Kulam,Manak Kulam,Marungapuri Tiruchirappalli District,pkg 20
2025_RDTN_537166_10
DIPR/1179/Tender/2025
Open Tender
Civil Works - Others
Item Wise
90 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹60,000
DRDA Tiruchirappalli
11 Aug 2025
2 Apr 2025
17 Apr 2025
2 Apr 2025
17 Apr 2025
2 Apr 2025
4 Apr 2025
Amount
Rejuvenation of T.Edaiyapatti Poolang Kulam
Clearing the Scrub jungle
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Add to relevant T.N.D.S,S. N0 20.A, rates for new tank bands and Closing breaches for extra watering and consolidation By Power roller (W0070)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete.having width up to 3m (W0087)
Providing Boundry Stone
Provision for Name Board
T.Edaiyapatti Ammankulam
Clearing the Scrub jungle
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Add to relevant T.N.D.S,S. N0 20.A, rates for new tank bands and Closing breaches for extra watering and consolidation By Power roller (W0070)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete.having width up to 3m (W0087)
Providing Boundry Stone
Provision for Name Board
Kalingapatti Pothigai kulam
Clearing the Scrub jungle
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Add to relevant T.N.D.S,S. N0 20.A, rates for new tank bands and Closing breaches for extra watering and consolidation By Power roller (W0070)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete.having width up to 3m (W0087)
Providing Boundry Stone
Provision for Name Board
Kalingapatti Odappa kulam
Clearing the Scrub jungle
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Add to relevant T.N.D.S,S. N0 20.A, rates for new tank bands and Closing breaches for extra watering and consolidation By Power roller (W0070)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete.having width up to 3m (W0087)
Providing Boundry Stone
Provision for Name Board
Kalingapatti Chetti kulam
Clearing the Scrub jungle
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Add to relevant T.N.D.S,S. N0 20.A, rates for new tank bands and Closing breaches for extra watering and consolidation By Power roller (W0070)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete.having width up to 3m (W0087)
Providing Boundry Stone
Provision for Name Board
Kalingapatti Kadan kulam
Clearing the Scrub jungle
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Add to relevant T.N.D.S,S. N0 20.A, rates for new tank bands and Closing breaches for extra watering and consolidation By Power roller (W0070)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete.having width up to 3m (W0087)
Providing Boundry Stone
Provision for Name Board
Palakurichi Arumugapillai kulam
Clearing the Scrub jungle
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Add to relevant T.N.D.S,S. N0 20.A, rates for new tank bands and Closing breaches for extra watering and consolidation By Power roller (W0070)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete.having width up to 3m (W0087)
Providing Boundry Stone
Provision for Name Board
Palakurichi Manak kulam
Clearing the Scrub jungle
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Add to relevant T.N.D.S,S. N0 20.A, rates for new tank bands and Closing breaches for extra watering and consolidation By Power roller (W0070)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete.having width up to 3m (W0087)
Providing Boundry Stone
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
THILLAI CONSTRUCTION (BID ID -1291263)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .