Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
31 Mar 2021, 4:00 pmClosed
Superintending Engineer
Superintending Engineer, Operation Circle HPSEBL, Hamirpur (H.P.) -177001
Construction of new 33KV HT (S/C) line with AAAC 7/4.26mm conductor on 11Mtr /13 Mtr long S/T Double Pole Structures from 132/33/11KV Sub-Station Kangehan to 2x3.15MVA, 33/11KV (U/M) Sub-Station, Jakhu and Four Pole Structure on total turnkey basis
2021_HPSEB_45986_1
HPSEBL/OCHMR/HMR/E/2020-21/17
Open Tender
Electrical Works
Turn-key
90 days
Harsipattan road Kangehan
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,180
Sr. Executive Engineer ED HPSEBL Hamirpur
₹30,000
31 Mar 2021
26 Mar 2021
31 Mar 2021
26 Mar 2021
31 Mar 2021
26 Mar 2021
Amount
Construction of new 33KV 4Pole structure a/w 33KV HT (S/C) line with AAAC 7/4.26mm conductor on 11Mtr / 13 Mtr long S/T Double Pole Structures from 132/33/11KV Sub-Station Kangehan to 2x3.15MVA, 33/11KV (U/M) Sub-Station, Jakhu on total turnkey basis including Survey, Design, Supply of Equipment / Material, Erection, Testing and Commissioning of same under ESD, HPSEBL, Sujanpur (ED Hamirpur). (Annexure-A-1 (BoQ2) & (Annexure-B-1 (BoQ3).
Description of Work / Item(s)
Amount
AAAC 7/4.26mm (100mm²) conductor {Includes 3 conductor lengths for 3Φ and additional 1% (Sag, Jumpering and wastage} Quantity 2.000 Unit km Shall be provided by HPSEBL
a) Steel Tubular Poles (11Mtr long, Working Load >227 kgf/m²) .
b) Steel Tubular Poles (13Mtr long, Working Load >227 kgf/m²) .
RCC Muff (2000mm long) including Concrete filling material.
MSAI Cross Bracing Set for Double Pole Structures
a) MS Angle Iron Belt Set -(2700x65X65x6mm) for X-Bracing ( 2 Nos per set ) x 10Str
b) MS Angle Iron X-Bracing set (3500x50x50x6 mm) ( 2 Nos per set ) x 10Str
c) Full Clamp made of M.S. Flat of size (50 x 6mm).with nuts & Bolts (4Nos per Set) x 09Set
Dead End Double Pole Structures
a) MSCI-.X-Arm for double Pole Str. size (3350x125x65x6)mm. x 7Str. (2Nos./Str)
b) Disc insulator String (Strain) sets: 3 No. Discs in each string: ^^ (Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps, Ball Cleave & Bend Stapple etc.) x (Single Circuit: 3 No. conductors) x (2 No. sides) /Dead Structures. x 7 Str & Tapping.
c) 33 kV Pin Insulators (Porcelain, 36 kV, 10 kN): 3 No per Structure
Run Through Double Pole Structures
a) MSCI-.X-Arm for double Pole str size (3350x125x65x6)mm. x 04Str.
b) Disc insulator String (Strain) sets: 3 No. Discs in each string: ^^ (Porcelain, BS, 12 kV, 90 kN) including Suspension Clamps, Ball Cleave & Bend Stapple etc.) x (Single Circuit: 3 No. conductors) Suspension Structures.
c) 33 kV Pin Insulators (Porcelain, 36 kV, 10 kN): 3 No per Structure
HT Stay Set / Guy Arrangement
a) H.T. Stay Set complete i/c Guy assembly and hellically fitting comptete
b) Stay wire 7/4.00 mm@ 9.00 kG per stay set
c) Full Clamp/ Stay Clamp made of M.S. Flat of size(50 x 6mm).
Earthing
a) HT Earthing Set complete.
b) Earth wire (GI, 6 SWG) {Includes 2 wire lengths and Additional 1% (Sag and wastage)}@ 150 kg/km
c) Eye Hook Bolt for Earth Wire
d) Earth Reel
Guarding of 33KV Line over Roads
a) MS Angle Iron .X-Arm size (4000 x 65 x 65 x 6)mm for Earthing / Guarding. (x 10Nos)
b) Cross Lacings (GI, 6 SWG) {2.2Mtr x 9 Nos @ 2Mtr Spacing} (0.102Kg/Mtr.).
M.S.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm² or more (with flat and spring washers)]
Barbed wire.
Danger Plate-33KV (203x200x1.6mm)
Providing Al. Paint and painting the structures with Al. paint complete in all respect
Full Clamp made of M.S. Flat of size(50 x 6mm).
Description of Work / Item(s)
Amount
Erection of 33KV line Double Pole Structure using 11Mtr/ 13Mtr long Steel Tubular Poles a/w RCC Muff & its concrete fillingas per latest standard practices /specification of REC / HPSEBL including digging of pits, erection of Poles & Muffs, re-filling of pit & ramming, drilling of holes in Cross Arms, fixing of M.S. Cross Arms, AI X-Bracing Set, Disc Insulator string Sets , Pin Insulators and other allied material such as Earth Clamps / knobs, Danger Plate & Barbed wire etc. and Painting of complete Structure (Poles & Cross Arms) with Aluminium paint and making it ready in all respect for sagging of AAAC 7/4.26mm conductor.
Erection of 33 KV HT Stay Set and Guy Assy including nozzling and tightening of Stay Wire complete in all respect as per latest standard practices /specification of REC / HPSEBL.
Erection of HT Earthing Set complete in all respect as per latest standard practices /specification of REC / HPSEBL including digging of pit, erection of Earthing Set, Earth GI Wire, providing/laying Coal, Salt & other allied material, re-filling of pit & ramming and making all earthing connections with line/equipment.
Erection of AAAC 7/4.26mm (100mm²) conductor as per latest standard practices /specification of REC / HPSEBL including Laying of conductor, stringing & Sagging, binding wi etc. (Per Km per wire) 0.660Km line x 3Wires =1.980Km).
Erection of GI Wire 6 SWG as per latest standard practices /specification of REC / HPSEBL including Laying of wire, stringing & Sagging, binding wi etc. (Per Km per wire) (Per Km per wire) (0.660Km line x 2Wires=1.320Km).
Erection Charges for fixing of Jumpers of 33Kv line as per latest standard practices /specification of REC / HPSEBL (Per Set).
Providing protection to Four Pole structure & Double pole structures of 33 Kv Jakhu- Kangehan line emanating from 132/33/11 Kv Sub-Station Kanghain to 33/11 Kv Sub-Station, Jakhu by providing 15Nos. GI Wire Crates of size 2.50x 1.25x1.25 Mtr filled with Bolders including providing of material for the same.
PRAVEEN KUMAR BISHT
SHARMA LIGHT HOUSE
PRAVEEN KUMAR BISHT
SHARMA LIGHT HOUSE
PRAVEEN KUMAR BISHT
SHARMA LIGHT HOUSE
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .