Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 CrAdmitted-Finance | ₹15.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹16.4 Cr+₹1.0 Cr (6.60%)Admitted-Finance | ₹16.4 Cr+₹1.0 Cr (6.60%) | L2 | Admitted-Finance |
| 3 | L3₹19.0 Cr+₹3.6 Cr (23.3%)Admitted-Finance | ₹19.0 Cr+₹3.6 Cr (23.3%) | L3 | Admitted-Finance |
| 4 | L4₹19.6 Cr+₹4.2 Cr (27.5%)Admitted-Finance | ₹19.6 Cr+₹4.2 Cr (27.5%) | L4 | Admitted-Finance |
| 5 | L5₹22.0 Cr+₹6.6 Cr (42.7%)Admitted-Finance B 1 UDYOG SADAN NO 3 M I D C ANDHERI EAST MUMBAI MAHARASHTRA 400093 | MUMBAI SUBURBAN | MAHARASHTRA | 400093 | ₹22.0 Cr+₹6.6 Cr (42.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SAVYA ENGINEERING SERVICES PVT. LTD. L3 | MARINECRAFT ENGINEERS PVT LTD L7 | ELEGANT ENGINEERING L2 | Aspolite Engineers (I) Pvt. Ltd. L6 | Patel Engineering Works Vizag L4 | MARINE ELECTRICALS (INDIA) LIMITED L5 | Deovrat Poat L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Cable ladder & MS Rod (Route marking, inspection, preparation, installation, dressing and clamping / tie binding including degaussing route) | ||||||||||
| 1.01 | 150 mm to 400 mm for Main route | 10,000 | Mtr. | 1,335 ₹1,33,50,000 | 2,400 ₹2,40,00,000 | 1,150 ₹1,15,00,000 Lowest | 2,300 ₹2,30,00,000 | 1,500 ₹1,50,00,000 | 1,446.37 ₹1,44,63,700 | 1,150 ₹1,15,00,000 Lowest |
| 1.02 | MS Rod 8 mm & MS/Al flat bar for local route | 28,000 | Mtr. | 615 ₹1,72,20,000 | 1,100 ₹3,08,00,000 | 575 ₹1,61,00,000 | 700 ₹1,96,00,000 | 700 ₹1,96,00,000 | 680.44 ₹1,90,52,320 | 511 ₹1,43,08,000 Lowest |
| 2.00Conduit run (Material, Route marking, installation with clamp and sealing) (Material under sub-contractor Scope) | ||||||||||
| 2.01 | Up to 35 mm | 200 | Mtr. | 2,980 ₹5,96,000 | 3,000 ₹6,00,000 | 1,800 ₹3,60,000 | 2,750 ₹5,50,000 | 2,200 ₹4,40,000 | 881.72 ₹1,76,344 | 688 ₹1,37,600 Lowest |
| 3.00A. MCT type Cable gland of MS/Al type (Marking, inspection, cutting opening, installation, welding, painting of welded area, complete packing & APT proofing) | ||||||||||
| 3.01 | Size 2x1 & 4x1 | 440 | Nos. | 3,500 ₹15,40,000 | 5,500 ₹24,20,000 | 5,050 ₹22,22,000 | 6,000 ₹26,40,000 | 5,679.12 ₹24,98,812.62 | 2,823.28 ₹12,42,243.2 Lowest | 4,775 ₹21,01,000 |
| 3.02 | Size 6x1 & 8x1 | 220 | Nos. | 4,700 ₹10,34,000 | 6,100 ₹13,42,000 | 5,350 ₹11,77,000 | 9,000 ₹19,80,000 | 6,311.32 ₹13,88,491.17 | 3,167.06 ₹6,96,753.2 Lowest | 5,307 ₹11,67,540 |
| 3.03 | Size 6x2 & 8x2 | 220 | Nos. | 6,475 ₹14,24,500 | 7,600 ₹16,72,000 | 5,550 ₹12,21,000 | 10,500 ₹23,10,000 | 6,831.78 ₹15,02,992.01 | 3,553.59 ₹7,81,789.8 Lowest | 5,744 ₹12,63,680 |
| 4.00Cable SLOT of MS/Al type (Marking, inspection, cutting opening, installation, welding, painting of welded area & packing / rat proofing) | ||||||||||
Tender Value
Refer Docs
EMD Value
₹8 L
Closing Date
12 Oct 2022, 12:00 pmClosed
MR. A.K Dey, MGR-CONTRACT, GRSE
MR. A.K Dey, MGR-CONTRACT, GRSE
Biennial Rate Contract for On Board Electrical Work for ASW SWC Ships at GRSE Ltd.
2022_GRSE_91065_1
SCC/AKD/OT(PRESS)/ELEC WORK/ASW SWC/044/ET-1894
Open Tender
Miscellaneous Services
Item Rate
730 days
As per NIT
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Yes
Garden Reach Shipbuilders and Engineers Limited
₹8 L
Yes
2 Nov 2022
7 Sept 2022
14 Oct 2022
7 Sept 2022
12 Oct 2022
27 Sept 2022
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.40 MB
GRSEInstructionsToBidderForOnlineBidSubmission.pdf
Additional Documents • 0.22 MB
PPP-MII-Order-16.09.2020.pdf
Additional Documents • 7.88 MB
MATRIXs.xls
Tender Documents • 0.47 MB
BOQ_100454.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .