Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
8 Oct 2026, 6:00 pmClosed
Executive Engineer, District R and B Division, Vadodara
Palej - Nareshwar Road Km. 0/0 to 18/800, Dist. Vadodara (Maintenance of Road by Soil Stabilization)
351185
08 of 2026-2027
Open
Civil - All
Works
Vadodara
8 documents required · 7 mandatory · 1 optional
₹3,600
Executive Engineer, District (R and B) Division, Vadodara
₹2.5 L
1 Oct 2026
1 Oct 2026
1 Oct 2026
8 Oct 2026
1 Oct 2026
Name of Work :- Palej - Nareshwar Road Km. 0/0 to 18/800, Dist. Vadodara (Maintenance of Road
by Soil Stabilization)
BILL OF QUANTITIES
It. No. Description of Item Quantity Unit Rate in Total
1 Clearing and grubbing road land including uprooting rank 0.25 Hect. 28455.09
vegetation grass bushes, shrubs, sapling and trees girth up to
mm removal of stumps of trees cut earlier and disposal of
unserviceable materials (C) By mechanical means in area of light
2 Excavation for catch / side water gutter in all sorts of soils to the 1764.00 Cum. 130.94
specified section including stacking the excavated stuff in a
regular bund and disposing of unsuitable or excess stuff as
directed all sorts of soils.
3 Soil Stabilisation-Stabilization of in-situ (existing pavement crust) 7560.00 Cum. 3302.70
or soil or otherwise sub-base course upto the required depth by
cold in-situ recycling using chemical additives/otherwise: Providing
pulverizing, spreading, milling and mixing of chemical additives at
the rate of minimum 650 ml/cum required quantity as per job mix
design in accordance with IRC37-2018. Cementitious additive @
rate of minimum 4% should be spread on the existing pavement
using a mobile truck mounted containerized cement/additive
spreader with microprocessor controlled weighing and spreading
system. The additive spreader shall have variable working width
sufficient to cover whole pavement lane. The in-situ stabilization
process shall be carried out by a mobile and self propelled
stabilizer / reclaimer of working width of 2.4 mt and with minimum
engine horse power of 440 kw with a variable working depth of
minimum 50 cm. The resultant stabilised mix then would be
profiled to the required grade, level and thickness using motor
grader and the mix would be compacted using 20 tonne pad foot
roller in combination with smooth wheel roller to achieve desired
proctor density as per IRC37-2018 and complete in all respects
and curing with water as required including all materials, labour
and machinery etc. The entire In-situ process would be carried out
in single pass with milling and pulverizing of damaged asphalt
pavement / soil / aggregates /soil-aggregate mixture to the desired
depth and with simultaneous addition of additives and water with
machine integrated spray bars fitted on the wheeled self-propelled
and vibratory pad foot roller to achieve desired proctor density in
all respects. The minimum unconfined compressive strength
(UCS) of stabilized sub base should be 4.5 to 7 MPa after 28 days
curing as per IRC37-2018. Also, durability aspects (wet-dry
cycles) of stabilized sub base should be satisfied as per IRC37-
2018. Including surface cement at 2 Kg/Sqm. to retard rutting
before application of wearing coarse post monsoon as directed by
engineer in charge.
Rs. Two Crore, Fifty Two Lakhs, Six Thousand, Five Hundred Sixty and Eighty Four Paisa Only
I/We am/are willing to carry out the work @ ______________ % ______________ percent (should be written in
figures and words) below / above, the estimated rates mentioned above, amount of my/our tender works out as under :
It. No. Description of Item Quantity Unit Rate in Total
Above all items of "Bill of Quantities" with Item Description, Unit, Qty, Rate & Amount have verified by me and
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for
which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C, Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix
design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
5 The contractor will have to submit the mix design for different grades of cement concrete and asphalt at his own cost
before execution as directed and to be approved from the engineer in charge.
Deputy Executive Engineer Executive Engineer
District (R&B) Sub Dn. No.1 District (R & B) Division
Vadodara Vadodara
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2. NIT.pdf
3. SBD - Tender Form.pdf
4. Special Condition.pdf
5. BOQ.pdf
6. Index.pdf
7. Tech Specification.pdf
9. Test Sch.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .