| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.4 LAccepted-AOC | ₹35.4 L | L1 | Accepted-AOC 1 st lowest |
| 2 | L2₹36.6 L+₹1.2 L (3.25%)Rejected-AOC | ₹36.6 L+₹1.2 L (3.25%) | L2 | Rejected-AOC 2 nd lowest |
| 3 | L3₹37.9 L+₹2.5 L (7.02%)Rejected-AOC | ₹37.9 L+₹2.5 L (7.02%) | L3 | Rejected-AOC 3 rd lowest |
| Sl No | Description | Qty | Unit | SEBIN XAVIER L2 | R K CONSTRUCTIONS L1 | Dipukumar S L3 |
|---|---|---|---|---|---|---|
| 1.00Second Floor Building | ||||||
| 1.00 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 1 | each | 323 ₹323 | 322 ₹322 Lowest | 345 ₹345 |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 20.22 | cum | 1,810 ₹36,601.82 Lowest | 1,810 ₹36,601.82 Lowest | 1,940 ₹39,230.68 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 3.78 | cum | 3,130 ₹11,834.53 | 3,121 ₹11,800.5 Lowest | 3,344.6 ₹12,645.93 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 184.44 | sqm | 860 ₹1,58,620.98 | 857 ₹1,58,067.65 Lowest | 918.6 ₹1,69,429.34 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 306.31 | sqm | 700 ₹2,14,416.3 | 648 ₹1,98,488.23 Lowest | 690 ₹2,11,353.21 |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 71.71 | sqm | 980 ₹70,277.76 | 868 ₹62,246.02 Lowest | 931 ₹66,763.87 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 296.06 | sqm | 890 ₹2,63,493.4 | 817 ₹2,41,881.02 Lowest | 876 ₹2,59,348.56 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 119.8 | metre | 189 ₹22,642.2 Lowest | 193 ₹23,121.4 | 207 ₹24,798.6 |
| 1.01 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 12.69 | sqm | 700 ₹8,883 Lowest | 701 ₹8,895.69 | 751 ₹9,530.19 |
Tender Value
₹41.7 L
EMD Value
₹50,000
Closing Date
18 Mar 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer
DEPOSIT Construction of Main Building Second Floor for College of Applied Science IHRD Malampuzha Palakka
2026_PWD_845288_1
PWD/BLDG/TR/4102/2022_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
Palakkad
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
3 Jul 2026
7 Mar 2026
21 Mar 2026
7 Mar 2026
18 Mar 2026
7 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Second Floor Building | |||||
| 1.001 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | - | each | - | - |
| 1.002 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | - | cum | - | - |
| 1.003 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | - | cum | - | - |
| 1.004 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 0.2 | sqm | - | - |
| 1.005 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.6 | sqm | - | - |
| 1.006 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 0.8 | sqm | - | - |
| 1.007 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.008 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 1 | metre | - | - |
| 1.009 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 1 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1427396.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_1427396.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .