Tender Value
₹58.0 L
EMD Value
₹58,100
Closing Date
12 Mar 2026, 6:00 pmClosed
Superintending Engineer, Project Implementation Unit, Health & Family Welfare Department.
New Waiting Shed Area Shed Work of Various Sub Center (02Nos) At.Dhajamba & Amalgundi Ta.Songadh & (07 Nos)Chakdhra,Dhangdhar,Andharvadidur,Takiamba,Bedchit,Gadat,Pathakvadi Ta.Dolvan Dist.Tapi
283095
2025-26/159/04
Open
Civil Works - Buildings
Tapi
1 document required · 1 mandatory
₹2,400
Yes
PIU-General Fund A/c 11-114
₹58,100
Yes
5 Mar 2026
5 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
Quantitiy Estimated Rates Total Amount
Quantitiy Estimated Rates Total Amount
Estimated Item Of Work Unit may be more
may be In Figure In word or less
Providing and laying cement concrete 1:2:4 (1- Cement : 2- Coarse
Rupees Three Thousand Seven
sand : 4- graded stone aggregates 20 mm nominal size) and curing
1 198.00 3786.47 Hundred Eighty Six and Paisa Forty Six Cu.mt
complete excluding cost of formwork in (A) Foundation and Plinth
Brick work using common burnt clay building bricks having
crushing strength not less than 35 kg./Sq.Cm. in foundation and Rupees Four Thousand One Hundred
plinth in Cement Mortar 1:5. (1- Cement : 5 -fine sand)(B) Fifty Three and Paisa Six Only
Providing and fixing of Ridge flashing for roof panel shall be made
out of 0.5 mm thick pre coated GI sheet . The Precoated sheet
shall be of minimum 240 mpa steel grade confirming to IS
14246:1995 and shall have zinc coating of minimum 120 gsm as
per IS:277:1992 , 5-7 microns epoxy primer on both side of the
sheet and polyester top coat 15-18 micron. The PPGI Sheet shall Rupees Eight Hundred Sixty Seven and
have plastic protective guard film of minimum 25 microns to avoid Paisa Thirty Eight Only
scratches during transportation. The ridge shall be fixed to the
steel members by pop rivet or self drilling/self stitching fastners @
maximum 450 mm c/c along length of capping/flashing etc
Steel work, riveted in built up sections framed work
including cutting, hoisting, fixing in position and applying a Rupees Six Thousand Seven Hundred
priming coat of red lead paint. (D) In trussses and trussed Forty Seven and Paisa Eight Only
purlins, upto 25 M. span and 15 M ovarall height.
Quantitiy Estimated Rates Total Amount
Quantitiy Estimated Rates Total Amount
Estimated Item Of Work Unit may be more
may be In Figure In word or less
Providing and fixing pre-cast Rubber Dye / steel Dye inter
locking concrete block 60mm thick with grade of concrete
M300 pnumatic compressed / vibrated mechanically and as per
Rupees Seven Hundred Four and Paisa
5 1413.00 approved design Confirming to IS 15658 : 2006 704.07 Sq.mt
including 35 mm Sand layer for levelling and filling the
joint with sand in proper line and level as per guidlines of
IRC : SP 63-2018 etc. Complete.
In Words :- Rupees Fifty Eight Lakhs Three Hundred Seventy one Only.
I/we am/are willing to carry out the work at………………………………………………….% above/below percent (should be written in figures and words) of the
estimated rates mentioned above. Amount of my/our tender works out as under :
Estimated amount put to tender
Add / deduct…………….% above / below
In words (Rupees………………………………..
All works shall be carried out as per Public Work Department Handbook and other specification of Division or as directed.
All the columns in Schedules should be filled in ink and the total of the entries ink last column should be struck by the contractor under his signature.
Rates quoted include clearance of site ( prior commencement of work and at its close ). In all respect and hold good for work under all condition, site,
Serviceable material available ( if any ) after Demolishing / Dismentalling any item should be hand over to the concerned PIU Site Engineer In Charge
The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual
mix design the costof difference of cement consumption have been deducted from the rate of original item at the rate of
input rate mentioned in all the tender. Input rate is Rs. _____________ MT.
5 GST extra applicable in case of work based on SOR 2024-25 only.
Dy. Executive Engineer Divisional Accountant Executive Engineer
PIU Zone-7 Tapi PIU Zone-7 Surat PIU Zone-7 Tapi
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Condition for cement.pdf
GR RnB Revise.pdf
GR-TMT-Lap Length.pdf
INSTRUCTIONS TO PERSON TENDERING.jpg
JPG
Performance Bond and SD-Paripatra-2023.pdf
PIU SPECIAL CONDITIONS.pdf
Inclusion of Insurance clause as per new SBD.pdf
6372 Make List HO 15.10.2025.pdf
Specification.pdf
Schedule B.pdf
SBD.pdf
Tender Document.pdf