Loading…
Loading…
| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | Schedule 1 | GOPAL INDUSTRIES | 1 | ₹32.3 L |
| 2 | Schedule 2 | GOPAL INDUSTRIES | 1 | ₹23.8 L |
| 3 | Schedule 3 | GOPAL INDUSTRIES | 1 | ₹15.9 L |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
16 Aug 2023, 5:00 pmClosed
SWITCH AND CROSSING ASSEMBLY 60 KG RH (Q3)
SWITCH & CROSSING ASSEMBLY 52 KG RH (Q3)
SWITCH AND CROSSING ASSEMBLY 52 KG LH (Q3)
5084982
GEM/2023/B/3740910
Two Packet Bid
SWITCH AND CROSSING ASSEMBLY 60 KG RH,SWITCH & CROSSING ASSEMBLY 52 KG RH,SWITCH AND CROSSING ASSEM
120 days
Andhra Pradesh; Visakhapatanam
Item wise evaluation
PRODUCT_CUSTOM
2 documents required · 2 mandatory
| Item | Delivery Location | Qty | Delivery | Spec |
|---|---|---|---|---|
| SWITCH AND CROSSING ASSEMBLY 60 KG RH (Q3) | Edarapalli Ravi BUILDING VISAKHAPATNAM Kumar 530031,CENTRALSTORES STEELPLANT | 4 | 120 days | |
| SWITCH & CROSSING ASSEMBLY 52 KG RH (Q3) | Edarapalli Ravi BUILDING VISAKHAPATNAM Kumar 530031,CENTRALSTORES STEELPLANT | 3 | 120 days | |
| SWITCH AND CROSSING ASSEMBLY 52 KG LH (Q3) | Edarapalli Ravi BUILDING VISAKHAPATNAM Kumar 530031,CENTRALSTORES STEELPLANT | 2 | 120 days |
Exempted
16 Aug 2023
26 Jul 2023
16 Aug 2023
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_5084982.pdf
GEM_BID
ts_for_item_no_1_2023-07-21-16-53-49_960a5b38c888b2216168e57bffbecd14.pdf
SPECIFICATION
ts_for_item_no_2_2023-07-21-17-00-51_f9a0bd2c7044b5ac495ffcfda259c0c1.pdf
SPECIFICATION
ts_for_item_no_3_2023-07-21-17-05-39_5e2c4364a7b00b60faf43502e773a0d9.pdf
SPECIFICATION
gtc.pdf
OTHER
Download all tender documents and submit your bid