| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.4 LAccepted-AOC VETTAN HOUSE VAIRAMGODE PATTARNADAKKAVU P O VAIRAMGODE KAITHAKKARA 676 301 DIST MALAPPURAM | MALAPPURAM | KERALA | 676301 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹25.7 L+₹20,787.36 (0.82%)Rejected-AOC | L2 | Rejected-AOC Second lowest |
Tender Value
₹23.2 L
EMD Value
₹50,000
Closing Date
23 Sept 2020, 5:00 pmClosed
Executive engineer
Office of the Executive engineer, MI Division, College road ,Palakkad
Rehabilitation of LIS 2018-19 Renovation of Pattithara LIS left branch canal in Pattithara Panchayath in Palakkad District.
2020_Irrig_385675_1
19/ET/EE/MI/PKD/2020-21
Open Tender
Civil Works - Others
Item Rate
365 days
Thrithala
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,095
Yes
online
₹50,000
Yes
8 Feb 2021
16 Sept 2020
30 Sept 2020
16 Sept 2020
23 Sept 2020
16 Sept 2020
16 Sept 2020 - 18 Sept 2020
Amount
LBC, RB punja culvert ,RB Punja, Punja Canal near Kottaaram Bhaagom
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.33.2 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
2.33.3 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth
60.7.3 : DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.9 : RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand).
15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.4 : DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22A.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
13.16.1 : 6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
od67717/2019_2020/IA : Supplying necessary tools for L.I.Scheme asper the list 1.Spanner Ring 6x7 Taparia, 2. Spanner Ring 30x32 Taparia, 3. Spanner Double End DEP 6x7 Taparia, 4. panner Double End DEP 30x32 Taparia, 5.Adjustable Spanner 1173 - 12" Taparia, 6. Screw Driver Flat 250x6, 826 Taparia, 7.Screw Driver Two in one 905 Taparia, 8. Tester 818 Taparia, 9.Tester 905 Taparia, 10. Hammer 1.5Lb wooden Handle Python/ Tiger HMC 11, 11. Hammer 2Lb wooden Handle Python/ Tiger HMC 11, 12. L Handle 1735 Taparia, 13. Tubular Box Spanner TS 6x7 Taparia, 14. Tubular Box Spanner TS 30x32 Taparia, 15. Grease Gun PLG 513 Prima, 16. Pipe wrench 1275 - 450mm Taparia, 17. Pipe wrench 1275 - 350mm Taparia, 18. Hacksaw Frame Tiger / Eastman Square HMC 44, 19. Hand Gloves Cotton PVC Coated Blue P 660 10",20 CVombination Plier 1621 - 8" Taparia, 21. Nose Plier Long 1430-6" Taparia, 22. Crow Bar 1.6, etc
od67718/2019_2020/IA : Supplying necessary Puller Bearing 24" 3L Tiger
od23149/2020_2021/IA : KSEB Electric post relocating in canal bund (Payment to contractor done based on submission of actual KSEB bills- reimbursement of KSEB receipts )
kunhahammed v
Bidder Name
kunhahammed v
Hussain v
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_547699.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .