Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
2 May 2026, 2:00 pmClosed
AGM(P AND P)
ASSISTANT GENERAL MANAGER PROJECTS AND PLANNING PD ADMINISTARTION FACT
ANNUAL CLEANING OF BOILERS IN THERMAL PLANT - II
2026_FACT_905557_1
5050/2026-2027/E33396
Limited
Miscellaneous Works
Item Rate
365 days
UDYOGAMANDAL, FACT
LIMITTED TENDER
5 documents required · 5 mandatory
₹0
₹5,000
Yes
4 May 2026
17 Apr 2026
4 May 2026
17 Apr 2026
2 May 2026
17 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ANNUAL CLEANING OF BOILERS IN THERMAL PLANT - II | |||||
| 1.01 | Cleaning of the boiler in PD-CPP including water wall tubes in the furnace area, bank tubes, LTSH, PSH, FSH, penthouse area, boiler drum interior, and drum internals, after providing adequate scaffolding arrangements. Cleaning and removal of accumulated soot from the flue gas ducts, air ducts, chimney hopper, chimney bottom, and other associated area shall be carried out as per the instructions of the Plant Manager or his authorized representative. The removed soot shall be safely collected in sacks and disposed of at the designated non-decayable yard. | - | LUMPSUM | - | - |
| 1.02 | Cleaning of both passes of the Air Preheater (APH) of the boilers in PD-CPP shall be performed. Individual tubes shall be cleaned by removing accumulated soot either by pushing it out with a flexible hose or by using water, as instructed by the Plant Manager or his authorized representative. | - | LUMPSUM | - | - |
| 1.03 | Cleaning and removal of accumulated soot in the first and second flue gas paths and the chimney bottom of the start-up boiler in PD-CPP shall be carried out. Individual flue gas tubes shall be thoroughly cleaned as per the instructions of the Plant Manager or his authorized representative. The removed soot shall be collected in sacks and disposed of at the designated non-decayable yard. | - | LUMPSUM | - | - |
| 1.04 | Cleaning of the PD-CPP main chimney bottom and removal of accumulated soot shall also be carried out. The collected soot shall be safely packed in sacks and disposed of at the non-decayable yard. | - | LUMPSUM | - | - |
| 1.05 | Hydraulic testing of the boilers shall be carried out using a high-pressure pump. Internal hydraulic tests of the boiler shall be carried out using a high-pressure pump to identify leakages in the pressure parts. The internal hydraulic test may be conducted multiple times, if required, until all leakages are identified and rectified. After successful completion of the internal hydraulic test, the statutory hydraulic test shall be conducted in the presence of the Inspector from the Factories & Boilers Department. If required, the statutory hydraulic test shall also be repeated until it is successfully completed and approved by the Boiler Inspector. | - | DAYS | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_951829.xls
BOQ • 0.24 MB
TERMSANDCONDITIONS.pdf
Tender Documents • 13.24 MB
Compliancestatement.pdf
Additional Documents • 2.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .