| 1 | L1₹44.8 LAccepted-AOC | L1 | Accepted-AOC accept | |
| 2 | L2₹45.7 L+₹89,716.79 (2.00%)Rejected-AOC | L2 | Rejected-AOC reject |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
10 Nov 2021, 3:00 pmClosed
Dupty director
GWLS PUROLA
Renovation of road from jakhol to cholanga (3 long bridge)
2021_PCCF_37538_1
751/3-3GWLS/PUROLA/2021-22
Open Tender
Civil Works - Roads
Item Rate
60 days
uttarkashi
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
DEPUTY DIRECTOR, GOVIND WILDLIFE PUROLA
₹1 L
27 Nov 2021
16 Oct 2021
17 Nov 2021
18 Oct 2021
10 Nov 2021
18 Oct 2021
Amount
t[kksy ls Nksyaxk dqiMk[kkbZ gksrs gq, xaxkM rd iSny VªSd ekxZ dk th.kks)kj
Excavation in foundation for retaining breast walls etc, in all types of soils and rocks inclunding all lead lift and disposal of surplus material
Random Rubble Stone Masonry laid Dry, in breast walls,retaining walls,etc. including supply of all material, labour, T&P and royalties etc. complete as per drawing and technical specifications.
Hand Packed stone filling in back of walls including cost of all materials,royality,T&P etc.
Random Rubble Stone Masonry in coolie walling including supply of all material,labour, T&P etc. required for proper completion of the work
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated materials to be used in embankment with a lift upto 3m and lead of 50 (average lead 25m)
Slip clearance( by manual means) of loose earth and other small loose materials including disposal complete
Slip clearance(by manual means) of boulders only including disposal complete
ekxZ ij iMus okys ?kkV;qdk [kM~M ij 12 eh0 foLrkj ds ykWx fczzt dk fuekZ.k
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material
Providing concrete for plain/ reinforced concrete in open foundations complete
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.
Plain/reinforced cement concrete in substructure complete
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc.
Cartage of Delma Frame Beam And Planks for Log Bridge
Chiran works for Delma Frame Etc by manual labour including supply of all material labour and T & P etc complete
Chiran works for Delma Frame Etc by manual labour including supply of all material labour and T & P etc complete
Fixing of 12 m span log bridge including fixing and adjustment of hinges bolts springs and or other fitting inclunding supply of al material T&P required for proper completion of the work
Hand Packed stone filling in back of walls including cost of all materials,royality,T&P etc.
Painting (one or more coats) with black Japan paint of approved brand and manufacture to give an even shade
ekxZ ij iMus okys ?kkV;qdk [kM~M ij 12 eh0 foLrkj ds ykWx fczzt dk fuekZ.k
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material
Providing concrete for plain/ reinforced concrete in open foundations complete
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.
Plain/reinforced cement concrete in substructure complete
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc.
Cartage of Delma Frame Beam And Planks for Log Bridge
Chiran works for Delma Frame Etc by manual labour including supply of all material labour and T & P etc complete
Chiran works for Delma Frame Etc by manual labour including supply of all material labour and T & P etc complete
Fixing of 12 m span log bridge including fixing and adjustment of hinges bolts springs and or other fitting inclunding supply of al material T&P required for proper completion of the work
Hand Packed stone filling in back of walls including cost of all materials,royality,T&P etc.
Painting (one or more coats) with black Japan paint of approved brand and manufacture to give an even shade
ekxZ ij iMus okys ?kkV;qdk [kM~M ij 10 eh0 foLrkj ds ykWx fczzt dk fuekZ.k
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material
Providing concrete for plain/ reinforced concrete in open foundations complete
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.
Plain/reinforced cement concrete in substructure complete
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc.
Cartage of Delma Frame Beam And Planks for Log Bridge
Chiran works for Delma Frame Etc by manual labour including supply of all material labour and T & P etc complete
Chiran works for Delma Frame Etc by manual labour including supply of all material labour and T & P etc complete
Fixing of 12 m span log bridge including fixing and adjustment of hinges bolts springs and or other fitting inclunding supply of al material T&P required for proper completion of the work
Hand Packed stone filling in back of walls including cost of all materials,royality,T&P etc.
Painting (one or more coats) with black Japan paint of approved brand and manufacture to give an even shade
Chaman Prakash
stage.html
html • 0.04 MB
tech_bid_open
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .