Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹3.8 L
EMD Value
₹9,522
Closing Date
27 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
O/o Assistant Executive Engineer Electrical Irrigation Sub Division Aluva
GENERAL-AMC 2025-26-Fully Comprehensive Annual Maintenance Contract of Panely, Kaprikad and Pantheerazhipara LIS under electrical irrigation section Kalady Electrical-General Electrical Work
2025_Irrig_811435_6
PWD/BLDG/10715/KLDY/2025-2026
Open Tender
Electrical Works
Item Rate
365 days
Aluva
Please refer Tender documents.
10 documents required · 10 mandatory
₹840
₹9,522
17 Oct 2025
17 Oct 2025
29 Oct 2025
17 Oct 2025
27 Oct 2025
17 Oct 2025
Work Name:GENERAL-AMC 2025-26-Fully Comprehensive Annual Maintenance Contract of Panely, Kaprikad and Pantheerazhipara LIS under electrical irrigation section Kalady-Electrical-General Electrical Work
ct alignment and trial run on full loadBOD57951/2025-2026:Lowering down and erecting 20 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load BOD57946/2025-2026:Lowering down and erecting 30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load Consumables and SuppliesM90.16.3.3:Supply and clamping the following size of strips on surface of wall/ parapet/ existing cable tray using clamps fabricated from 20 X 3 mm GI flat duly painted or heavy duty GI spacer saddles spacing of clamps not exceeding 1 m, making good the damages, colour washing etc. as required ( for horizontal run)25 x 6 mm GI stripmetreÑOD57936/2025-2026:Supply and renewal of Multifunction meter to read: multifunction meter to read VA,PF,KW,KWh, accuracy class-1 LCD in panel board after dismantling the damaged one, L&T or Equivalent make.`OD57929/2025-2026:Supply and Fixing of 200/5 A, 10 VA, accuracy class 1, Resin Cast Metering CTrOD57944/2025-2026: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one<OD57932/2025-2
ply and Installing 20 W LED Tube light.¢OD57927/2025-2026:Supply and renewal of Three Phase digital Ammeter accuracy class 1 in panel board after dismantling the damaged one, L&T or equivalent make.¤OD57934/2025-2026:Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.©OD57943/2025-2026:Supply and Installation of DOL starter for 5 HP 3 phase 400V 50Hz squirrel cage induction motor including giving connections( L&T /Equivalent made)ßOD57937/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6316 , SKF / FAG or equivalent, suitable for 90/100 HP motor / pump set as per the direction of Departmental staff at site.ÛOD57939/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6315 , SKF / FAG or equivalent, suitable for 80HP motor / pump set as per the direction of Departmental staff at site.ÛOD57933/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6314 , SKF / FAG or equivalent, suitable for 60 HP motor / pump set as per the direction of Departmental staff at site.¸OD57928/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6312 , SKF / FAG or equivalent, as per the direction of Departmental staff at site.ÖOD57941/2025-2026:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6309 , SKF / FAG or equivalent, suitable for pump (50-120 HP) as per the direction of Departmental staff at site.OD57931/2025-2026:Supply and fixing 145A 3 pole Power contactor for 80HP motor starter AC3 rating at415v with Ac coil, Auxiliary contacts 2NO/NC (L&T or equivalent make)cOD57930/2025-2026:Supply and fixing of L&T Overload relay for 80 HP Squirrel cage motor starterYOD57940/2025-2026:Supply of electronic timer for FASD(L&T ST 80329000 ) or equivalentaOD57935/2025-2026:Supply , Conveyance and fitting 315/400 A, HRC Fuse Base with suitable HRC Fuseno Motor AMCjOD57921/2025-2026:Fully Comprehensive Annual Maintenance of 1HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor through out the AMC period whenever necessary (excluding rewinding) repairs of vacuum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pump set, base plate all time during the period of contract and the faults should be rectified with in the time allowed.DayOD57920/2025-2026:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, overhauling of the motor, maintenance of motor thorughout the AMC period whenver necessary (excluding rewinding) repairs of vaccum pipe line, starter, valves electrical accessories etc as required complete in good working condition including painting the motor pumpset, base plate all time during the period of contract and the faults should be rectified with in the time allowed.(Total 2 Motors, 12 months for Each Motor). ¾OD57923/2025-2026:Fully Comprehensive Annual Maintenance of 20 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coil, overload coil, reconditioning and refill oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch gears as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pump set by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base plate, pump set and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . ÀOD57926/2025-2026: Fully Comprehensive Annual Maintenance of 90 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coil, overload coil, reconditioning and refill oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch gears as required, replacing the burnout fuse links, repair the damaged hinges replacing worn out beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pump set by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base plate, pump set and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . ÀOD57924/2025-2026: Fully Comprehensive Annual Maintenance of 80 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coi
l, overload coil, reconditioning and refill oil, overhauling of panel board by checking the wire connections, control wiring, servicing of switch gears as required, replacing the burnout fuse links, repair the damaged hinges replacing worn out beedings including painting etc. replacing the damaged coupling bush, and coupling bolts, Overhauling and reconditioning the pump set by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base plate, pump set and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . ùOD57925/2025-2026:Fully Comprehensive Annual Maintenance of 30 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coil, overload coil, reconditioning and refill oil, reconditioning the slip ring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pump set by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base plate, pump set and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . øOD57922/2025-2026: Fully Comprehensive Annual Maintenance of 60 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coil, overload coil, reconditioning and refill oil, reconditioning the slip ring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pump set by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base plate, pump set and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .õOD57919/2025-2026:Fully Comprehensive Annual Maintenance of 90 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt release coil, overload coil, reconditioning and refill oil, reconditioning the slip ring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .Motor Lifting WorksOD57914/2025-2026: Lifting the 1 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. OD57913/2025-2026: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. ÓOD57915/2025-2026: Lifting the 60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. ÒOD57916/2025-2026:Lifting the 90 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. ÒOD57912/2025-2026:Lifting the 80 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. ÔOD57918/2025-2026:Lifting the 20 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. and placing them conveniently on the platform. ÔOD57917/2025-2026:Lifting the 30 HP motor after disconnec
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Tendernotice_3.pdf
PDF • 0.36 MB
NIT.pdf
Tender Documents • 0.03 MB
SBD.pdf
Tender Documents • 1.63 MB
MAKE.pdf
Tender Documents • 0.29 MB
BOQ_1355116.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .