| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC 1st lowest |
| 2 | L2₹1.4 Cr+₹13.5 L (10.5%)Rejected-Finance VILLAGE P O AMARPUR TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | ₹1.4 Cr+₹13.5 L (10.5%) | L2 | Rejected-Finance Non responsive |
| 3 | L3₹1.4 Cr+₹15.6 L (12.1%)Rejected-Finance VILLAGE KAYARIAN P O ZAKATKHANA TEHSIL SH NAINA DEVI JI DISTT BILASPUR HP | BILASPUR | HIMACHAL PRADESH | 174001 | ₹1.4 Cr+₹15.6 L (12.1%) | L3 | Rejected-Finance Non responsive |
Tender Value
₹1.0 Cr
EMD Value
₹1.4 L
Closing Date
20 Nov 2019, 10:30 amClosed
Executive Engineer
Division No.1, HPPWD Bilaspur
Providing and laying 25mm thick bitumen concrete.
2019_PWD_32543_1
PW-BLP1-CB-eproc/19-12361-95 dt 22.10.19
Open Tender
Civil Works - Roads
Item Rate
60 days
Bilaspur
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,000
EE Division No.1, HPPWD Bilaspur
₹1.4 L
26 Jan 2021
8 Nov 2019
20 Nov 2019
8 Nov 2019
20 Nov 2019
8 Nov 2019
Amount
Providing and applying tack coat with paving bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 (Zero point twenty to Zero point twenty five ) kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MORD Technical Specification Clause 503. including carriage of materials within all leads, lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying bituminous concrete 25mm (Twenty five milimeter) thick with 75 TPH batch / drum type HMP using crushed aggregates of specified grading as per IRC 29-1988 table 3, premixed with bituminous binder VG 30 (Thirty). (Viscosity grade- thirty) 5.4 to 5.6 ( Five point four to five six) percent of mix and filler transporting the hot mix plant to work site, laying with a hydrostatic paver finisher with sensor control to the required grade ,leveland alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compacting as per IRC 29: 1988 complete in all respects. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 KN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. (Fifty Millimeter) thick) Bitumen VG-30(Thirty). (Viscosity grade- thirty) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying mechanically mixed and vibrated concrete for plain / reinforced concrete in open foundations complete as per drawings and MORD technical specifications 2014 Clause 802, 803, 1202 & 1203 P.C.C grade M 10 ( Ten) Nominal mix 1:3:6 (one cement : three sand : six graded crushed stone aggregate) 40 mm (Forty milimeter) nominal size with minimum cement contents should not be less than 250 kg (Two hundred fifty) koligram per cubic meter including carriage of material with in all leads and lifts and including shoring and shuttering and curring complete including pumping or bailing out water (surface and sub soil water) up to all depth and any quantum of water including cleaning of slush which may arise out during dewatering and carriage of machinery, material ,tools equipment safety measures and other incidentals as per the direction of Engineer-in Charge. . The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and Laying of Interlocking Concrete Blcok Pavements having thickness 80 mm (Eighty millimeter) as per drawing and Technical Specification Clause 1504. including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Manohar Lal
Ajmer Singh
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .