| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.7 CrAccepted-AOC D J COLONY TARKAPUR MIRZAPUR | MIRZAPUR | MIRZAPUR | UTTAR PRADESH | ₹32.7 Cr Quoted ₹31.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹31.9 CrRejected-Finance | ₹31.9 Cr | L2 | Rejected-Finance Not Qualified for AOC |
Tender Value
Refer Docs
EMD Value
₹47 L
Closing Date
25 Feb 2021, 12:00 pmClosed
S.K. Agrawal
Superintending Engineer Varanasi Circle PWD Varanasi
Strengthening of Sakaldiha Kamalpur Amara Road. (Km. 1 to 26.125)
2021_CEUVZ_548613_1
295/183 Com-Varanasi Circle./20-21 Dt. 15.01.2021
Open Tender
Civil Works
270 days
Chandauli
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹47 L
Yes
18 May 2021
25 Jan 2021
25 Feb 2021
25 Jan 2021
25 Feb 2021
25 Jan 2021
Amount
Excavation for roadway in soil using Mechanical Means including loading in truck for carrying of cut earth to embankment site with all lifts and leads up to 1000 metres. Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST (For Bogi Action)
Sand Filling in Foundation Trenches as per Drawing & Technical Specification Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST (For Bogi Action)
GSB Grading-III Construction of granular Sub-base by providing well graded material , spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with soil compector to achieve the desired density, complete as perTechincal Specification clause 401 (using 50% old GSB materials) Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST (For Bogi Action)
GSB Grading-II Construction of granular Sub-base by providing well graded material , spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with soil compector to achieve the desired density, complete as perTechincal Specification clause 401 (using 50% old GSB materials) Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST (For Bogi Action)
GSB Grading-I Construction of granular Sub-base by providing well graded material , spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with soil compector to achieve the desired density, complete as perTechincal Specification clause 401 Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST (For Bogi Action)
Wet Mix Macadam (Stabalized) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material with S.S. grade emulsion 3.5% and 1% cement by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with soil compector to achieve the desired density. Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST (For Bogi Action)
Analysis of rate for RAP (Type-2) Recycling asphalt and Granular pavement by cold milling using truck mainted/self propeeled cement/lime spereader. The cement/lime spreader shall have vartable working width with microprocessor controlled spray rate though augers and cellular wheels the aggregates shall be in situ pulverzed/stablize with 3.5% S.S. grade emulsion,1% cement and 50% using nominal size fresh aggregate using four wheeled drive recycler, the recycirs. shall have working depth upto 50 cm with variable depth control system. Compacting with soil compector to achive desire unconfined compressive stregth and from a layer of base (for compected thickness 10 cm) Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. as per MORT&H specification No-305 (sr. No.3.16) Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST
Providing and applying tack coat-1 with bitumen using pressure distributor at the rate of 0.35 kg per sqm on the prepared non bituminous surface cleaned with hydrolic broom as per temechanical specificatiob clause 503. Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST
Providing and laying dense graded bituminous(Grade-II) macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST.
Providing and applying tack coat-2 with bitumen using pressure distributor at the rate of 0.30 kg per sqm on the prepared non bituminous surface cleaned with hydrolic broom as per temechanical specificatiob clause 503. Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST.
Providing and laying bituminous concrete(Grade-II) with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premix with bituminous binder @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem roller to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. as per MORT&H specification No-305 (sr. No.3.16) Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST.
Earth work in excavation of foundation of structures as per drawing and technical specification clause 305.1, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST.
Sand Filling in Foundation Trenches as per Drawing & Technical Specification Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per technical specification cluase 802, 803, 1202 & 1203 Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST.
Brick masonry work in In 1:3 cement mortar cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST.
Plain cement concrete 1:2:4 nominal mix in foundation with crushed stone aggregate mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per technical specification cluase 802, 803, 1202 & 1203 Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST.
R.C.C. grade M-25- Providing and laying reinforced cement concrete in super stuctture as per drawing and technical specification clause no-800,1205.4 abd 1205.5 Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST.
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications No-1000 & 1200 Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST.
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST.
Providing and laying of Filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height compacted to a firm condition complete as per drawing and as.per Technical specification clause 1204.3.8 Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST.
Plastering with cement mortar (1:3) on brick work in sub structure as per drawing and technical specification Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST.
Provinding and laying plaster blocks 30x30 cm with cement and coarse sand in proportion of 1:3 Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST.
Running of 5HP pump for dewatering including arrangement of pump suction and delivery pipes and other accessories at site including cost of POL Including labour, material T&P etc. complete as per direction of E/I also including all taxes, labour cess, but excluding GST.
RCC Developers ltd.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid