Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹12.5 L
EMD Value
₹12,500
Closing Date
5 Dec 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Officer, Mahuva Nagar Palika, Mahuva
Development Work of Garbage Vulnerable Points at Various Place in Mahuva City (2nd Attempt)
369469
57/202627
Open
Civil Works
Works
Bhavnagar
₹900
Mahuva Nagarpalika Mahuva
₹12,500
25 Nov 2026
25 Nov 2026
25 Nov 2026
5 Dec 2026
25 Nov 2026
120 days
NAME OF WORK : CONSTRUCTION AND DEVELOPMENT WORK OF GARBAGE VULNERABLE POINTS AT VARIOUS PLACE IN
TOTAL AMOUNT PUT TO TENDER
TOTAL AMOUNT PUT TO TENDER
PERCENTAGE RATE TENDER
Sr.No. Schedule Amount
1 Schedule - "B"- 1
2 Schedule - "B"- 2
3 Schedule - "B"- 3
4 Schedule - "B"- 4
5 Schedule - "B"- 5
6 Schedule - "B"- 6
7 Schedule - "B"- 7
8 Schedule - "B"- 8
9 Schedule - "B"- 9
10 Schedule - "B"- 10
11 Schedule - "B"- 11
12 Schedule - "B"- 12
13 Schedule - "B"- 13
14 Schedule - "B"- 14
Total Amount Rs.
Total Amount Rs.
I/We am/are willing to carry out the work @ % Above / Below Percentage (should be writen in figures and
words) of the Estimated rates mentioned above amount of my / our Tender works out as under.
Estimated Amount Estimated Amount
Put to Tender Rs. 1250512/- Put to Tender Rs. 1250512/-
Add % Rs. Deduct %Rs.
Total Rs. Total Rs.
(In Words (In Words
Signature of the Contractor
Cons. Engineer Municipal Engineer
"Geomaze Cconsultancy Service" Mahuva Nagrapalika
Chief officer President
Mahuva Nagrapalika Mahuva Nagrapalika
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Points at Baalamsaapir Dargaah (Laati Bazar)
Item No. but may be Item of work Unit
In figures In words estimated
Box cutting the road surface to proper slope and camber for making a base for road work
Rupees One Hundred Twelve and Two
1 3.00 including removing the excavated stuff and depositing on the road side slope as directed upto 112.02 cum
Providing & laying spreading and compacting 150 mm thick WBM Grade I of B.T.M.C. metal 45mm
to 63mm size including using 29% (22+7%) filler i.e. stone screeing 13.2 mm at the rate
Cumt. & stone dust at the rate 0.08 cumt. including spreading in uniform thickness, hand
Rupees One Thousand Two Hundred
2 10.00 packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, 1267.00 cum
Sixty Seven Only
applying and brooming type of screning/binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density.
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- Mashin Crused stone
Rupees Three Thousand Seventy Five
3 7.00 aggregates 40 mmnominal size) and curing complete including cost of formwork in (A) Foundation 3075.91 Cumt
and Ninety One Paise Only
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 80 mm thick with
grade of concrete M300 pnumatic compressed / vibrated mechanically and as per approved
Rupees Seven Hundred Twenty One
4 67.00 design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint 721.14 Sqmt
and Fourteen Paise Only
with sand in proper line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
Providing cement vata (10cm. x 10 cm. size) quarter roundin cement mortar 1:1 including neat Rupees Seventy Seven and Twenty
cement finishing,watering etc. complete. Eight Paise Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Points at Baalamsaapir Dargaah (Laati Bazar)
Item No. but may be Item of work Unit
In figures In words estimated
Plantations & Greenery
Preparation of Beds and Plantation for Hedging & Shrubbery: Preparation of beds for hedging and
shrubbery by excavating the soil to a depth of 60 cm and trenching the excavated base to a
further depth of 30 cm, including breaking of clods; refilling the excavated earth after mixing with
sludge or well-decomposed farmyard manure in the ratio of 8:1 (8 parts of stacked volume of
earth after 20% reduction to 1 part of stacked volume of sludge/manure after 8% reduction);
flooding with water; making good any settlement by filling with earth wherever necessary;
watering; fine dressing and leveling of beds; stacking and disposal of unserviceable material and Rupees One Hundred Seventy Six and
surplus earth by spreading and leveling as directed within a lead of 50 m and lift up to 1.5 m; and Seventy Five Paise Only
providing and planting approved healthy hedge/shrub plants/saplings in prepared beds at the
specified spacing, including digging planting holes, placing plants, refilling, firming the soil, initial
watering and establishment of plantation, complete as directed by the Engineer-in-Charge.
Providing, supplying and fixing Mild Steel Tree Guard, round type, fabricated from Mild Steel
conforming to IS 2062, having 450 mm diameter and 1000 mm height excluding leg height,
complete with 3 Nos. Mild Steel supporting legs and Mild Steel mesh/sides of 3 mm thickness,
having mesh aperture of approximately 40 mm × 70 mm, including cutting, bending,
straightening, fabrication, welding, grinding, drilling wherever required, making all necessary Rupees Five Hundred Fifty Nine and
2 4.00 joints and connections, providing suitable stiffeners/rings, surface preparation, application of 559.85 Each
Eighty Five Paise Only
epoxy paint, loading, unloading, transportation, handling, shifting and fixing/embedding of the
tree guard at site, including all labour, materials, tools, tackles, equipment and incidental works,
complete in all respects as per the approved drawing, specifications and directions of the
Engineer-in-Charge.*
Stainless Steel Bench seating Capacity of 3&4 seater with installation and paintng Banch selection
1 3.00 8080.00 Rupees Eight Thousand Eighty Only Each
as per Engineer in charge
Total Amount Rs.
Total Amount Rs.
Rupees One lakh Thirteen Thousand Three Hundred Sixty Three Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Points at Baalamsaapir Dargaah (Laati Bazar)
Item No. but may be Item of work Unit
In figures In words estimated
I/We are aready to carry out the above mentioned work @___________above/below the Estimated Rates mentioned above and position of My/Our tender works out as under ::
IF TENDER IS BELOW IF TENDER IS ABOVE
[1] Estimated cost of work Rs. Estimate cost of work Rs.
[2] Deduct % below_________ Rs. Deduct % Above_________ Rs.
[3] Net amount of Tender Rs. Net amount of Tender Rs.
[4] Rs. In words Rs. Rs. In words Rs.
nature of contractor Chief Officer
Mahuva Nagar Seva Sadan
1) All the work shall be carried out as per Public Works Deptt., Hand Book, and other I.S. Specifications and other I.S. Specifications and other specifications of the Division or as directed.
2) All the columns in Schedule should be filled in Ink and Total of the entires in the Last column should be struck by the contractor under his signature.
3) Rates quoted includes clearance of site (prior to commencement of work and at its closer) in all respects and hold good for work under all conditions, site moisture weather etc.
4) The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6 /32772/N Dtd. 26.4.78 and as per G.R. No. TNC/9/24/C Dtd. 18.11.91 as directed by
5) Testing of materials be as per statement attached with the Specifications, the materials shall be testes. Bill for testing shall be paid by the Deptt., and 1% of the (one percent) of amount put to tender
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated
8) In R.C.C. item where there is a change in grade of mix or change as per actual mix design the difference of cement consumption shall be added/deducted from rate of original item at the rate of star
9) As per Govt. in Finance Department Reso. Dt. 15.09.2018 and No.GST/1017/1087/GST Cell and No. TJR/102017/599/Z, Dt.28.09.2018 GST from the bill above Rs.2.50 lacs shall be deducted at 1%
Signature of contractor Chief Officer
Mahuva Nagar Seva Sadan
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Points at Bhagirath Nagar Na Gate Ni Same
Item No. but may be Item of work Unit
In figures In words estimated
Box cutting the road surface to proper slope and camber for making a base for road work
Rupees One Hundred Twelve and One
1 10.00 including removing the excavated stuff and depositing on the road side slope as directed upto 112.02 cum
Providing & laying spreading and compacting 150 mm thick WBM Grade I of B.T.M.C. metal 45mm
to 63mm size including using 29% (22+7%) filler i.e. stone screeing 13.2 mm at the rate
Cumt. & stone dust at the rate 0.08 cumt. including spreading in uniform thickness, hand
Rupees One Thousand Two Hundred
2 5.00 packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, 1267.00 cum
Sixty Seven Only
applying and brooming type of screning/binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density.
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- Mashin Crused stone
Rupees Three Thousand Seventy Five
3 5.00 aggregates 40 mmnominal size) and curing complete including cost of formwork in (A) Foundation 3075.91 Cum
and Ninety One Paise Only
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 80 mm thick with
grade of concrete M300 pnumatic compressed / vibrated mechanically and as per approved
Rupees Seven Hundred Twenty One
4 50.00 design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint 721.14 Sqmt
and Fourteen Paise Only
with sand in proper line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
Providing cement vata (10cm. x 10 cm. size) quarter roundin cement mortar 1:1 including neat Rupees Seventy Seven and Twenty
cement finishing,watering etc. complete. Eight Paise Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Points at Bhagirath Nagar Na Gate Ni Same
Item No. but may be Item of work Unit
In figures In words estimated
Plantations & Greenery
Preparation of Beds and Plantation for Hedging & Shrubbery: Preparation of beds for hedging and
shrubbery by excavating the soil to a depth of 60 cm and trenching the excavated base to a
further depth of 30 cm, including breaking of clods; refilling the excavated earth after mixing with
sludge or well-decomposed farmyard manure in the ratio of 8:1 (8 parts of stacked volume of
earth after 20% reduction to 1 part of stacked volume of sludge/manure after 8% reduction);
flooding with water; making good any settlement by filling with earth wherever necessary;
watering; fine dressing and leveling of beds; stacking and disposal of unserviceable material and Rupees One Hundred Seventy Six and
surplus earth by spreading and leveling as directed within a lead of 50 m and lift up to 1.5 m; and Seventy Five Paise Only
providing and planting approved healthy hedge/shrub plants/saplings in prepared beds at the
specified spacing, including digging planting holes, placing plants, refilling, firming the soil, initial
watering and establishment of plantation, complete as directed by the Engineer-in-Charge.
Providing, supplying and fixing Mild Steel Tree Guard, round type, fabricated from Mild Steel
conforming to IS 2062, having 450 mm diameter and 1000 mm height excluding leg height,
complete with 3 Nos. Mild Steel supporting legs and Mild Steel mesh/sides of 3 mm thickness,
having mesh aperture of approximately 40 mm × 70 mm, including cutting, bending,
straightening, fabrication, welding, grinding, drilling wherever required, making all necessary Rupees Five Hundred Fifty Nine and
2 4.00 joints and connections, providing suitable stiffeners/rings, surface preparation, application of 559.85 Each
Eighty Five Paise Only
epoxy paint, loading, unloading, transportation, handling, shifting and fixing/embedding of the
tree guard at site, including all labour, materials, tools, tackles, equipment and incidental works,
complete in all respects as per the approved drawing, specifications and directions of the
Engineer-in-Charge.*
Stainless Steel Bench seating Capacity of 3&4 seater with installation and paintng Banch selection
1 3.00 8000.00 Rupees Eight Thousand Only Each
as per Engineer in charge
Total Amount Rs.
Total Amount Rs.
Rupees Eighty Nine Thousand Three Hundred Sixteen Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Points at Bhagirath Nagar Na Gate Ni Same
Item No. but may be Item of work Unit
In figures In words estimated
I/We are aready to carry out the above mentioned work @___________above/below the Estimated Rates mentioned above and position of My/Our tender works out as under ::
IF TENDER IS BELOW IF TENDER IS ABOVE
[1] Estimated cost of work Rs. Estimate cost of work Rs.
[2] Deduct % below_________ Rs. Deduct % Above_________ Rs.
[3] Net amount of Tender Rs. Net amount of Tender Rs.
[4] Rs. In words Rs. Rs. In words Rs.
nature of contractor Chief Officer
Mahuva Nagar Seva Sadan
1) All the work shall be carried out as per Public Works Deptt., Hand Book, and other I.S. Specifications and other I.S. Specifications and other specifications of the Division or as directed.
2) All the columns in Schedule should be filled in Ink and Total of the entires in the Last column should be struck by the contractor under his signature.
3) Rates quoted includes clearance of site (prior to commencement of work and at its closer) in all respects and hold good for work under all conditions, site moisture weather etc.
4) The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6 /32772/N Dtd. 26.4.78 and as per G.R. No. TNC/9/24/C Dtd. 18.11.91 as directed by
5) Testing of materials be as per statement attached with the Specifications, the materials shall be testes. Bill for testing shall be paid by the Deptt., and 1% of the (one percent) of amount put to tender
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated
8) In R.C.C. item where there is a change in grade of mix or change as per actual mix design the difference of cement consumption shall be added/deducted from rate of original item at the rate of star
9) As per Govt. in Finance Department Reso. Dt. 15.09.2018 and No.GST/1017/1087/GST Cell and No. TJR/102017/599/Z, Dt.28.09.2018 GST from the bill above Rs.2.50 lacs shall be deducted at 1%
Signature of contractor Chief Officer
Mahuva Nagar Seva Sadan
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Points at Near Ramji Mandir Bhavani Road
Item No. but may be Item of work Unit
In figures In words estimated
20mm thicks and faced cement plaster on walls upto height 10 metres above ground level
Rupees Three Hundred Twenty Six and
1 54.00 consisting of 12mm thick backing coat of C.M.1:3 (1-cement:3- sand) and 8 mm thick finishing 326.11 Sqmt
Eleven Paise Only
coat of C.M. 1:1 (1-cement : 1-sand) etc. complete.
Wall painting (two coats natural / artificial art or 3D picture on surface to give an required shape
even shade including throughly brushing the surface free from mortar dropping sand other Rupees Four Hundred Fifty Four and
foreign matter and sand papered smooth to remove all dirt , and remains of loose powdered Fifty Paise Only
materials. etc complete (M.R)
Plantations & Greenery
Preparation of Beds and Plantation for Hedging & Shrubbery: Preparation of beds for hedging and
shrubbery by excavating the soil to a depth of 60 cm and trenching the excavated base to a
further depth of 30 cm, including breaking of clods; refilling the excavated earth after mixing with
sludge or well-decomposed farmyard manure in the ratio of 8:1 (8 parts of stacked volume of
earth after 20% reduction to 1 part of stacked volume of sludge/manure after 8% reduction);
flooding with water; making good any settlement by filling with earth wherever necessary;
watering; fine dressing and leveling of beds; stacking and disposal of unserviceable material and Rupees One Hundred Seventy Six and
surplus earth by spreading and leveling as directed within a lead of 50 m and lift up to 1.5 m; and Seventy Five Paise Only
providing and planting approved healthy hedge/shrub plants/saplings in prepared beds at the
specified spacing, including digging planting holes, placing plants, refilling, firming the soil, initial
watering and establishment of plantation, complete as directed by the Engineer-in-Charge.
Providing, supplying and fixing Mild Steel Tree Guard, round type, fabricated from Mild Steel
conforming to IS 2062, having 450 mm diameter and 1000 mm height excluding leg height,
complete with 3 Nos. Mild Steel supporting legs and Mild Steel mesh/sides of 3 mm thickness,
having mesh aperture of approximately 40 mm × 70 mm, including cutting, bending,
straightening, fabrication, welding, grinding, drilling wherever required, making all necessary Rupees Five Hundred Fifty Nine and
2 4.00 joints and connections, providing suitable stiffeners/rings, surface preparation, application of 559.85 Each
Eighty Five Paise Only
epoxy paint, loading, unloading, transportation, handling, shifting and fixing/embedding of the
tree guard at site, including all labour, materials, tools, tackles, equipment and incidental works,
complete in all respects as per the approved drawing, specifications and directions of the
Engineer-in-Charge.*
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Points at Near Ramji Mandir Bhavani Road
Item No. but may be Item of work Unit
In figures In words estimated
Stainless Steel Bench seating Capacity of 3&4 seater with installation and paintng Banch selection
1 3.00 8000.00 Rupees Eight Thousand Only Each
as per Engineer in charge
Total Amount Rs.
Total Amount Rs.
Rupees Sixty Nine Thousand Ninety Nine Only
I/We are aready to carry out the above mentioned work @___________above/below the Estimated Rates mentioned above and position of My/Our tender works out as under ::
IF TENDER IS BELOW IF TENDER IS ABOVE
[1] Estimated cost of work Rs. Estimate cost of work Rs.
[2] Deduct % below_________ Rs. Deduct % Above_________ Rs.
[3] Net amount of Tender Rs. Net amount of Tender Rs.
[4] Rs. In words Rs. Rs. In words Rs.
nature of contractor Chief Officer
Mahuva Nagar Seva Sadan
1) All the work shall be carried out as per Public Works Deptt., Hand Book, and other I.S. Specifications and other I.S. Specifications and other specifications of the Division or as directed.
2) All the columns in Schedule should be filled in Ink and Total of the entires in the Last column should be struck by the contractor under his signature.
3) Rates quoted includes clearance of site (prior to commencement of work and at its closer) in all respects and hold good for work under all conditions, site moisture weather etc.
4) The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6 /32772/N Dtd. 26.4.78 and as per G.R. No. TNC/9/24/C Dtd. 18.11.91 as directed by
5) Testing of materials be as per statement attached with the Specifications, the materials shall be testes. Bill for testing shall be paid by the Deptt., and 1% of the (one percent) of amount put to tender
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated
8) In R.C.C. item where there is a change in grade of mix or change as per actual mix design the difference of cement consumption shall be added/deducted from rate of original item at the rate of star
9) As per Govt. in Finance Department Reso. Dt. 15.09.2018 and No.GST/1017/1087/GST Cell and No. TJR/102017/599/Z, Dt.28.09.2018 GST from the bill above Rs.2.50 lacs shall be deducted at 1%
Signature of contractor Chief Officer
Mahuva Nagar Seva Sadan
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Points at Darbar Gadh
Item No. but may be Item of work Unit
In figures In words estimated
Box cutting the road surface to proper slope and camber for making a base for road work
Rupees One Hundred Twelve and One
1 11.00 including removing the excavated stuff and depositing on the road side slope as directed upto 112.02 cum
Providing & laying spreading and compacting 150 mm thick WBM Grade I of B.T.M.C. metal 45mm
to 63mm size including using 29% (22+7%) filler i.e. stone screeing 13.2 mm at the rate
Cumt. & stone dust at the rate 0.08 cumt. including spreading in uniform thickness, hand
Rupees One Thousand Two Hundred
2 4.00 packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, 1267.00 cum
Sixty Seven Only
applying and brooming type of screning/binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density.
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- Mashin Crused stone
Rupees Three Thousand Seventy Five
3 4.00 aggregates 40 mmnominal size) and curing complete including cost of formwork in (A) Foundation 3075.91 Cumt
and Ninety One Paise Only
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 80 mm thick with
grade of concrete M300 pnumatic compressed / vibrated mechanically and as per approved
Rupees Seven Hundred Twenty One
4 44.00 design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint 721.14 Sqmt
and Fourteen Paise Only
with sand in proper line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
Providing cement vata (10cm. x 10 cm. size) quarter roundin cement mortar 1:1 including neat Rupees Seventy Seven and Twenty
cement finishing,watering etc. complete. Eight Paise Only
20mm thicks and faced cement plaster on walls upto height 10 metres above ground level
Rupees Three Hundred Twenty Six and
6 40.00 consisting of 12mm thick backing coat of C.M.1:3 (1-cement:3- sand) and 8 mm thick finishing 326.11 sqmt
Eleven Paise Only
coat of C.M. 1:1 (1-cement : 1-sand) etc. complete.
Wall painting (two coats natural / artificial art or 3D picture on surface to give an required shape
even shade including throughly brushing the surface free from mortar dropping sand other Rupees Four Hundred Fifty Four and
foreign matter and sand papered smooth to remove all dirt , and remains of loose powdered Fifty Paise Only
materials. etc complete (M.R)
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Points at Darbar Gadh
Item No. but may be Item of work Unit
In figures In words estimated
Plantations & Greenery
Preparation of Beds and Plantation for Hedging & Shrubbery: Preparation of beds for hedging and
shrubbery by excavating the soil to a depth of 60 cm and trenching the excavated base to a
further depth of 30 cm, including breaking of clods; refilling the excavated earth after mixing with
sludge or well-decomposed farmyard manure in the ratio of 8:1 (8 parts of stacked volume of
earth after 20% reduction to 1 part of stacked volume of sludge/manure after 8% reduction);
flooding with water; making good any settlement by filling with earth wherever necessary;
watering; fine dressing and leveling of beds; stacking and disposal of unserviceable material and Rupees One Hundred Seventy Six and
surplus earth by spreading and leveling as directed within a lead of 50 m and lift up to 1.5 m; and Seventy Five Paise Only
providing and planting approved healthy hedge/shrub plants/saplings in prepared beds at the
specified spacing, including digging planting holes, placing plants, refilling, firming the soil, initial
watering and establishment of plantation, complete as directed by the Engineer-in-Charge.
Providing, supplying and fixing Mild Steel Tree Guard, round type, fabricated from Mild Steel
conforming to IS 2062, having 450 mm diameter and 1000 mm height excluding leg height,
complete with 3 Nos. Mild Steel supporting legs and Mild Steel mesh/sides of 3 mm thickness,
having mesh aperture of approximately 40 mm × 70 mm, including cutting, bending,
straightening, fabrication, welding, grinding, drilling wherever required, making all necessary Rupees Five Hundred Fifty Nine and
2 4.00 joints and connections, providing suitable stiffeners/rings, surface preparation, application of 559.85 Each
Eighty Five Paise Only
epoxy paint, loading, unloading, transportation, handling, shifting and fixing/embedding of the
tree guard at site, including all labour, materials, tools, tackles, equipment and incidental works,
complete in all respects as per the approved drawing, specifications and directions of the
Engineer-in-Charge.*
Stainless Steel Bench seating Capacity of 3&4 seater with installation and paintng Banch selection
1 3.00 8000.00 Rupees Eight Thousand Only Each
as per Engineer in charge
Total Amount Rs.
Total Amount Rs.
Rupees One lakh Eleven Thousand Nine Hundred Five Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Points at Darbar Gadh
Item No. but may be Item of work Unit
In figures In words estimated
I/We are aready to carry out the above mentioned work @___________above/below the Estimated Rates mentioned above and position of My/Our tender works out as under ::
IF TENDER IS BELOW IF TENDER IS ABOVE
[1] Estimated cost of work Rs. Estimate cost of work Rs.
[2] Deduct % below_________ Rs. Deduct % Above_________ Rs.
[3] Net amount of Tender Rs. Net amount of Tender Rs.
[4] Rs. In words Rs. Rs. In words Rs.
nature of contractor Chief Officer
Mahuva Nagar Seva Sadan
1) All the work shall be carried out as per Public Works Deptt., Hand Book, and other I.S. Specifications and other I.S. Specifications and other specifications of the Division or as directed.
2) All the columns in Schedule should be filled in Ink and Total of the entires in the Last column should be struck by the contractor under his signature.
3) Rates quoted includes clearance of site (prior to commencement of work and at its closer) in all respects and hold good for work under all conditions, site moisture weather etc.
4) The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6 /32772/N Dtd. 26.4.78 and as per G.R. No. TNC/9/24/C Dtd. 18.11.91 as directed by
5) Testing of materials be as per statement attached with the Specifications, the materials shall be testes. Bill for testing shall be paid by the Deptt., and 1% of the (one percent) of amount put to tender
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated
8) In R.C.C. item where there is a change in grade of mix or change as per actual mix design the difference of cement consumption shall be added/deducted from rate of original item at the rate of star
9) As per Govt. in Finance Department Reso. Dt. 15.09.2018 and No.GST/1017/1087/GST Cell and No. TJR/102017/599/Z, Dt.28.09.2018 GST from the bill above Rs.2.50 lacs shall be deducted at 1%
Signature of contractor Chief Officer
Mahuva Nagar Seva Sadan
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Points at Gokul Nagar Bapani Madhi Pase
Item No. but may be Item of work Unit
In figures In words estimated
Box cutting the road surface to proper slope and camber for making a base for road work
Rupees One Hundred Twelve and One
1 4.00 including removing the excavated stuff and depositing on the road side slope as directed upto 112.02 cum
Providing & laying spreading and compacting 150 mm thick WBM Grade I of B.T.M.C. metal 45mm
to 63mm size including using 29% (22+7%) filler i.e. stone screeing 13.2 mm at the rate
Cumt. & stone dust at the rate 0.08 cumt. including spreading in uniform thickness, hand
Rupees One Thousand Two Hundred
2 2.00 packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, 1267.00 cum
Sixty Seven Only
applying and brooming type of screning/binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density.
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- Mashin Crused stone
Rupees Three Thousand Seventy Five
3 2.00 aggregates 40 mmnominal size) and curing complete including cost of formwork in (A) Foundation 3075.91 Cumt
and Ninety One Paise Only
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 80 mm thick with
grade of concrete M300 pnumatic compressed / vibrated mechanically and as per approved
Rupees Seven Hundred Twenty One
4 16.00 design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint 721.14 Sqmt
and Fourteen Paise Only
with sand in proper line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
Providing cement vata (10cm. x 10 cm. size) quarter roundin cement mortar 1:1 including neat Rupees Seventy Seven and Twenty
cement finishing,watering etc. complete. Eight Paise Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Points at Gokul Nagar Bapani Madhi Pase
Item No. but may be Item of work Unit
In figures In words estimated
Plantations & Greenery
Preparation of Beds and Plantation for Hedging & Shrubbery: Preparation of beds for hedging and
shrubbery by excavating the soil to a depth of 60 cm and trenching the excavated base to a
further depth of 30 cm, including breaking of clods; refilling the excavated earth after mixing with
sludge or well-decomposed farmyard manure in the ratio of 8:1 (8 parts of stacked volume of
earth after 20% reduction to 1 part of stacked volume of sludge/manure after 8% reduction);
flooding with water; making good any settlement by filling with earth wherever necessary;
watering; fine dressing and leveling of beds; stacking and disposal of unserviceable material and Rupees One Hundred Seventy Six and
surplus earth by spreading and leveling as directed within a lead of 50 m and lift up to 1.5 m; and Seventy Five Paise Only
providing and planting approved healthy hedge/shrub plants/saplings in prepared beds at the
specified spacing, including digging planting holes, placing plants, refilling, firming the soil, initial
watering and establishment of plantation, complete as directed by the Engineer-in-Charge.
Providing, supplying and fixing Mild Steel Tree Guard, round type, fabricated from Mild Steel
conforming to IS 2062, having 450 mm diameter and 1000 mm height excluding leg height,
complete with 3 Nos. Mild Steel supporting legs and Mild Steel mesh/sides of 3 mm thickness,
having mesh aperture of approximately 40 mm × 70 mm, including cutting, bending,
straightening, fabrication, welding, grinding, drilling wherever required, making all necessary Rupees Five Hundred Fifty Nine and
2 4.00 joints and connections, providing suitable stiffeners/rings, surface preparation, application of 559.85 Each
Eighty Five Paise Only
epoxy paint, loading, unloading, transportation, handling, shifting and fixing/embedding of the
tree guard at site, including all labour, materials, tools, tackles, equipment and incidental works,
complete in all respects as per the approved drawing, specifications and directions of the
Engineer-in-Charge.*
Stainless Steel Bench seating Capacity of 3&4 seater with installation and paintng Banch selection
1 2.00 8000.00 Rupees Eight Thousand Only Each
as per Engineer in charge
Total Amount Rs.
Total Amount Rs.
Rupees Forty Two Thousand Two Hundred Forty Six Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Points at Gokul Nagar Bapani Madhi Pase
Item No. but may be Item of work Unit
In figures In words estimated
I/We are aready to carry out the above mentioned work @___________above/below the Estimated Rates mentioned above and position of My/Our tender works out as under ::
IF TENDER IS BELOW IF TENDER IS ABOVE
[1] Estimated cost of work Rs. Estimate cost of work Rs.
[2] Deduct % below_________ Rs. Deduct % Above_________ Rs.
[3] Net amount of Tender Rs. Net amount of Tender Rs.
[4] Rs. In words Rs. Rs. In words Rs.
nature of contractor Chief Officer
Mahuva Nagar Seva Sadan
1) All the work shall be carried out as per Public Works Deptt., Hand Book, and other I.S. Specifications and other I.S. Specifications and other specifications of the Division or as directed.
2) All the columns in Schedule should be filled in Ink and Total of the entires in the Last column should be struck by the contractor under his signature.
3) Rates quoted includes clearance of site (prior to commencement of work and at its closer) in all respects and hold good for work under all conditions, site moisture weather etc.
4) The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6 /32772/N Dtd. 26.4.78 and as per G.R. No. TNC/9/24/C Dtd. 18.11.91 as directed by
5) Testing of materials be as per statement attached with the Specifications, the materials shall be testes. Bill for testing shall be paid by the Deptt., and 1% of the (one percent) of amount put to tender
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated
8) In R.C.C. item where there is a change in grade of mix or change as per actual mix design the difference of cement consumption shall be added/deducted from rate of original item at the rate of star
9) As per Govt. in Finance Department Reso. Dt. 15.09.2018 and No.GST/1017/1087/GST Cell and No. TJR/102017/599/Z, Dt.28.09.2018 GST from the bill above Rs.2.50 lacs shall be deducted at 1%
Signature of contractor Chief Officer
Mahuva Nagar Seva Sadan
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Jaj Sahebna Bunglow Pase
Item No. but may be Item of work Unit
In figures In words estimated
Box cutting the road surface to proper slope and camber for making a base for road work
Rupees One Hundred Twelve and One
1 20.00 including removing the excavated stuff and depositing on the road side slope as directed upto 112.02 cum
Providing & laying spreading and compacting 150 mm thick WBM Grade I of B.T.M.C. metal 45mm
to 63mm size including using 29% (22+7%) filler i.e. stone screeing 13.2 mm at the rate
Cumt. & stone dust at the rate 0.08 cumt. including spreading in uniform thickness, hand
Rupees One Thousand Two Hundred
2 7.00 packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, 1267.00 cum
Sixty Seven Only
applying and brooming type of screning/binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density.
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- Mashin Crused stone
Rupees Three Thousand Seventy Five
3 7.00 aggregates 40 mmnominal size) and curing complete including cost of formwork in (A) Foundation 3075.91 Cumt
and Ninety One Paise Only
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 80 mm thick with
grade of concrete M300 pnumatic compressed / vibrated mechanically and as per approved
Rupees Seven Hundred Twenty One
4 67.00 design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint 721.14 Sqmt
and Fourteen Paise Only
with sand in proper line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
Providing cement vata (10cm. x 10 cm. size) quarter roundin cement mortar 1:1 including neat Rupees Seventy Seven and Twenty
cement finishing,watering etc. complete. Eight Paise Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Jaj Sahebna Bunglow Pase
Item No. but may be Item of work Unit
In figures In words estimated
Plantations & Greenery
Preparation of Beds and Plantation for Hedging & Shrubbery: Preparation of beds for hedging and
shrubbery by excavating the soil to a depth of 60 cm and trenching the excavated base to a
further depth of 30 cm, including breaking of clods; refilling the excavated earth after mixing with
sludge or well-decomposed farmyard manure in the ratio of 8:1 (8 parts of stacked volume of
earth after 20% reduction to 1 part of stacked volume of sludge/manure after 8% reduction);
flooding with water; making good any settlement by filling with earth wherever necessary;
watering; fine dressing and leveling of beds; stacking and disposal of unserviceable material and Rupees One Hundred Seventy Six and
surplus earth by spreading and leveling as directed within a lead of 50 m and lift up to 1.5 m; and Seventy Five Paise Only
providing and planting approved healthy hedge/shrub plants/saplings in prepared beds at the
specified spacing, including digging planting holes, placing plants, refilling, firming the soil, initial
watering and establishment of plantation, complete as directed by the Engineer-in-Charge.
Providing, supplying and fixing Mild Steel Tree Guard, round type, fabricated from Mild Steel
conforming to IS 2062, having 450 mm diameter and 1000 mm height excluding leg height,
complete with 3 Nos. Mild Steel supporting legs and Mild Steel mesh/sides of 3 mm thickness,
having mesh aperture of approximately 40 mm × 70 mm, including cutting, bending,
straightening, fabrication, welding, grinding, drilling wherever required, making all necessary Rupees Five Hundred Fifty Nine and
2 4.00 joints and connections, providing suitable stiffeners/rings, surface preparation, application of 559.85 Each
Eighty Five Paise Only
epoxy paint, loading, unloading, transportation, handling, shifting and fixing/embedding of the
tree guard at site, including all labour, materials, tools, tackles, equipment and incidental works,
complete in all respects as per the approved drawing, specifications and directions of the
Engineer-in-Charge.*
Stainless Steel Bench seating Capacity of 3&4 seater with installation and paintng Banch selection
1 3.00 8000.00 Rupees Eight Thousand Only Each
as per Engineer in charge
Total Amount Rs.
Total Amount Rs.
Rupees One lakh Thirteen Thousand One Hundred Fifty Nine Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Jaj Sahebna Bunglow Pase
Item No. but may be Item of work Unit
In figures In words estimated
I/We are aready to carry out the above mentioned work @___________above/below the Estimated Rates mentioned above and position of My/Our tender works out as under ::
IF TENDER IS BELOW IF TENDER IS ABOVE
[1] Estimated cost of work Rs. Estimate cost of work Rs.
[2] Deduct % below_________ Rs. Deduct % Above_________ Rs.
[3] Net amount of Tender Rs. Net amount of Tender Rs.
[4] Rs. In words Rs. Rs. In words Rs.
nature of contractor Chief Officer
Mahuva Nagar Seva Sadan
1) All the work shall be carried out as per Public Works Deptt., Hand Book, and other I.S. Specifications and other I.S. Specifications and other specifications of the Division or as directed.
2) All the columns in Schedule should be filled in Ink and Total of the entires in the Last column should be struck by the contractor under his signature.
3) Rates quoted includes clearance of site (prior to commencement of work and at its closer) in all respects and hold good for work under all conditions, site moisture weather etc.
4) The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6 /32772/N Dtd. 26.4.78 and as per G.R. No. TNC/9/24/C Dtd. 18.11.91 as directed by
5) Testing of materials be as per statement attached with the Specifications, the materials shall be testes. Bill for testing shall be paid by the Deptt., and 1% of the (one percent) of amount put to tender
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated
8) In R.C.C. item where there is a change in grade of mix or change as per actual mix design the difference of cement consumption shall be added/deducted from rate of original item at the rate of star
9) As per Govt. in Finance Department Reso. Dt. 15.09.2018 and No.GST/1017/1087/GST Cell and No. TJR/102017/599/Z, Dt.28.09.2018 GST from the bill above Rs.2.50 lacs shall be deducted at 1%
Signature of contractor Chief Officer
Mahuva Nagar Seva Sadan
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Kamdaar Kalyan Kendra ni Same
Item No. but may be Item of work Unit
In figures In words estimated
Box cutting the road surface to proper slope and camber for making a base for road work
Rupees One Hundred Twelve and One
1 7.00 including removing the excavated stuff and depositing on the road side slope as directed upto 112.02 cum
Providing & laying spreading and compacting 150 mm thick WBM Grade I of B.T.M.C. metal 45mm
to 63mm size including using 29% (22+7%) filler i.e. stone screeing 13.2 mm at the rate
Cumt. & stone dust at the rate 0.08 cumt. including spreading in uniform thickness, hand
Rupees One Thousand Two Hundred
2 2.00 packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, 1267.00 cum
Sixty Seven Only
applying and brooming type of screning/binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density.
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- Mashin Crused stone
Rupees Three Thousand Seventy Five
3 2.00 aggregates 40 mmnominal size) and curing complete including cost of formwork in (A) Foundation 3075.91 Cum
and Ninety One Paise Only
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 80 mm thick with
grade of concrete M300 pnumatic compressed / vibrated mechanically and as per approved
Rupees Seven Hundred Twenty One
4 23.00 design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint 721.14 Sqmt
and Fourteen Paise Only
with sand in proper line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
Providing cement vata (10cm. x 10 cm. size) quarter roundin cement mortar 1:1 including neat Rupees Seventy Seven and Twenty
cement finishing,watering etc. complete. Eight Paise Only
20mm thicks and faced cement plaster on walls upto height 10 metres above ground level
Rupees Three Hundred Twenty Six and
6 29.00 consisting of 12mm thick backing coat of C.M.1:3 (1-cement:3- sand) and 8 mm thick finishing 326.11 sqmt
Eleven Paise Only
coat of C.M. 1:1 (1-cement : 1-sand) etc. complete.
Wall painting (two coats natural / artificial art or 3D picture on surface to give an required shape
even shade including throughly brushing the surface free from mortar dropping sand other Rupees Four Hundred Fifty Four and
foreign matter and sand papered smooth to remove all dirt , and remains of loose powdered Fifty Paise Only
materials. etc complete (M.R)
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Kamdaar Kalyan Kendra ni Same
Item No. but may be Item of work Unit
In figures In words estimated
Plantations & Greenery
Preparation of Beds and Plantation for Hedging & Shrubbery: Preparation of beds for hedging and
shrubbery by excavating the soil to a depth of 60 cm and trenching the excavated base to a
further depth of 30 cm, including breaking of clods; refilling the excavated earth after mixing with
sludge or well-decomposed farmyard manure in the ratio of 8:1 (8 parts of stacked volume of
earth after 20% reduction to 1 part of stacked volume of sludge/manure after 8% reduction);
flooding with water; making good any settlement by filling with earth wherever necessary;
watering; fine dressing and leveling of beds; stacking and disposal of unserviceable material and Rupees One Hundred Seventy Six and
surplus earth by spreading and leveling as directed within a lead of 50 m and lift up to 1.5 m; and Seventy Five Paise Only
providing and planting approved healthy hedge/shrub plants/saplings in prepared beds at the
specified spacing, including digging planting holes, placing plants, refilling, firming the soil, initial
watering and establishment of plantation, complete as directed by the Engineer-in-Charge.
Providing, supplying and fixing Mild Steel Tree Guard, round type, fabricated from Mild Steel
conforming to IS 2062, having 450 mm diameter and 1000 mm height excluding leg height,
complete with 3 Nos. Mild Steel supporting legs and Mild Steel mesh/sides of 3 mm thickness,
having mesh aperture of approximately 40 mm × 70 mm, including cutting, bending,
straightening, fabrication, welding, grinding, drilling wherever required, making all necessary Rupees Five Hundred Fifty Nine and
2 4.00 joints and connections, providing suitable stiffeners/rings, surface preparation, application of 559.85 Each
Eighty Five Paise Only
epoxy paint, loading, unloading, transportation, handling, shifting and fixing/embedding of the
tree guard at site, including all labour, materials, tools, tackles, equipment and incidental works,
complete in all respects as per the approved drawing, specifications and directions of the
Engineer-in-Charge.*
Stainless Steel Bench seating Capacity of 3&4 seater with installation and paintng Banch selection
1 2.00 8000.00 Rupees Eight Thousand Only Each
as per Engineer in charge
Total Amount Rs.
Total Amount Rs.
Rupees Sixty Nine Thousand Four Hundred Ninety Five Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Kamdaar Kalyan Kendra ni Same
Item No. but may be Item of work Unit
In figures In words estimated
I/We are aready to carry out the above mentioned work @___________above/below the Estimated Rates mentioned above and position of My/Our tender works out as under ::
IF TENDER IS BELOW IF TENDER IS ABOVE
[1] Estimated cost of work Rs. Estimate cost of work Rs.
[2] Deduct % below_________ Rs. Deduct % Above_________ Rs.
[3] Net amount of Tender Rs. Net amount of Tender Rs.
[4] Rs. In words Rs. Rs. In words Rs.
nature of contractor Chief Officer
Mahuva Nagar Seva Sadan
1) All the work shall be carried out as per Public Works Deptt., Hand Book, and other I.S. Specifications and other I.S. Specifications and other specifications of the Division or as directed.
2) All the columns in Schedule should be filled in Ink and Total of the entires in the Last column should be struck by the contractor under his signature.
3) Rates quoted includes clearance of site (prior to commencement of work and at its closer) in all respects and hold good for work under all conditions, site moisture weather etc.
4) The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6 /32772/N Dtd. 26.4.78 and as per G.R. No. TNC/9/24/C Dtd. 18.11.91 as directed by
5) Testing of materials be as per statement attached with the Specifications, the materials shall be testes. Bill for testing shall be paid by the Deptt., and 1% of the (one percent) of amount put to tender
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated
8) In R.C.C. item where there is a change in grade of mix or change as per actual mix design the difference of cement consumption shall be added/deducted from rate of original item at the rate of star
9) As per Govt. in Finance Department Reso. Dt. 15.09.2018 and No.GST/1017/1087/GST Cell and No. TJR/102017/599/Z, Dt.28.09.2018 GST from the bill above Rs.2.50 lacs shall be deducted at 1%
Signature of contractor Chief Officer
Mahuva Nagar Seva Sadan
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Kal Bhairav Chowk
Item No. but may be Item of work Unit
In figures In words estimated
Box cutting the road surface to proper slope and camber for making a base for road work
Rupees One Hundred Twelve and One
1 9.00 including removing the excavated stuff and depositing on the road side slope as directed upto 112.02 cum
Providing & laying spreading and compacting 150 mm thick WBM Grade I of B.T.M.C. metal 45mm
to 63mm size including using 29% (22+7%) filler i.e. stone screeing 13.2 mm at the rate
Cumt. & stone dust at the rate 0.08 cumt. including spreading in uniform thickness, hand
Rupees One Thousand Two Hundred
2 3.00 packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, 1267.00 cum
Sixty Seven Only
applying and brooming type of screning/binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density.
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- Mashin Crused stone
Rupees Three Thousand Seventy Five
3 3.00 aggregates 40 mmnominal size) and curing complete including cost of formwork in (A) Foundation 3075.91 Cum
and Ninety One Paise Only
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 80 mm thick with
grade of concrete M300 pnumatic compressed / vibrated mechanically and as per approved
Rupees Seven Hundred Twenty One
4 35.00 design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint 721.14 Sqmt
and Fourteen Paise Only
with sand in proper line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
Providing cement vata (10cm. x 10 cm. size) quarter roundin cement mortar 1:1 including neat Rupees Seventy Seven and Twenty
cement finishing,watering etc. complete. Eight Paise Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Kal Bhairav Chowk
Item No. but may be Item of work Unit
In figures In words estimated
Plantations & Greenery
Preparation of Beds and Plantation for Hedging & Shrubbery: Preparation of beds for hedging and
shrubbery by excavating the soil to a depth of 60 cm and trenching the excavated base to a
further depth of 30 cm, including breaking of clods; refilling the excavated earth after mixing with
sludge or well-decomposed farmyard manure in the ratio of 8:1 (8 parts of stacked volume of
earth after 20% reduction to 1 part of stacked volume of sludge/manure after 8% reduction);
flooding with water; making good any settlement by filling with earth wherever necessary;
watering; fine dressing and leveling of beds; stacking and disposal of unserviceable material and Rupees One Hundred Seventy Six and
surplus earth by spreading and leveling as directed within a lead of 50 m and lift up to 1.5 m; and Seventy Five Paise Only
providing and planting approved healthy hedge/shrub plants/saplings in prepared beds at the
specified spacing, including digging planting holes, placing plants, refilling, firming the soil, initial
watering and establishment of plantation, complete as directed by the Engineer-in-Charge.
Providing, supplying and fixing Mild Steel Tree Guard, round type, fabricated from Mild Steel
conforming to IS 2062, having 450 mm diameter and 1000 mm height excluding leg height,
complete with 3 Nos. Mild Steel supporting legs and Mild Steel mesh/sides of 3 mm thickness,
having mesh aperture of approximately 40 mm × 70 mm, including cutting, bending,
straightening, fabrication, welding, grinding, drilling wherever required, making all necessary Rupees Five Hundred Fifty Nine and
2 4.00 joints and connections, providing suitable stiffeners/rings, surface preparation, application of 559.85 Each
Eighty Five Paise Only
epoxy paint, loading, unloading, transportation, handling, shifting and fixing/embedding of the
tree guard at site, including all labour, materials, tools, tackles, equipment and incidental works,
complete in all respects as per the approved drawing, specifications and directions of the
Engineer-in-Charge.*
Stainless Steel Bench seating Capacity of 3&4 seater with installation and paintng Banch selection
1 3.00 8000.00 Rupees Eight Thousand Only Each
as per Engineer in charge
Total Amount Rs.
Total Amount Rs.
Rupees Sixty Eight Thousand Nine Hundred Twenty Eight Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Kal Bhairav Chowk
Item No. but may be Item of work Unit
In figures In words estimated
I/We are aready to carry out the above mentioned work @___________above/below the Estimated Rates mentioned above and position of My/Our tender works out as under ::
IF TENDER IS BELOW IF TENDER IS ABOVE
[1] Estimated cost of work Rs. Estimate cost of work Rs.
[2] Deduct % below_________ Rs. Deduct % Above_________ Rs.
[3] Net amount of Tender Rs. Net amount of Tender Rs.
[4] Rs. In words Rs. Rs. In words Rs.
nature of contractor Chief Officer
Mahuva Nagar Seva Sadan
1) All the work shall be carried out as per Public Works Deptt., Hand Book, and other I.S. Specifications and other I.S. Specifications and other specifications of the Division or as directed.
2) All the columns in Schedule should be filled in Ink and Total of the entires in the Last column should be struck by the contractor under his signature.
3) Rates quoted includes clearance of site (prior to commencement of work and at its closer) in all respects and hold good for work under all conditions, site moisture weather etc.
4) The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6 /32772/N Dtd. 26.4.78 and as per G.R. No. TNC/9/24/C Dtd. 18.11.91 as directed by
5) Testing of materials be as per statement attached with the Specifications, the materials shall be testes. Bill for testing shall be paid by the Deptt., and 1% of the (one percent) of amount put to tender
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated
8) In R.C.C. item where there is a change in grade of mix or change as per actual mix design the difference of cement consumption shall be added/deducted from rate of original item at the rate of star
9) As per Govt. in Finance Department Reso. Dt. 15.09.2018 and No.GST/1017/1087/GST Cell and No. TJR/102017/599/Z, Dt.28.09.2018 GST from the bill above Rs.2.50 lacs shall be deducted at 1%
Signature of contractor Chief Officer
Mahuva Nagar Seva Sadan
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Nand Kuvarbaugh Near (Gayatri Chowk)
Item No. but may be Item of work Unit
In figures In words estimated
Box cutting the road surface to proper slope and camber for making a base for road work
Rupees One Hundred Twelve and One
1 5.00 including removing the excavated stuff and depositing on the road side slope as directed upto 112.02 cum
Providing & laying spreading and compacting 150 mm thick WBM Grade I of B.T.M.C. metal 45mm
to 63mm size including using 29% (22+7%) filler i.e. stone screeing 13.2 mm at the rate
Cumt. & stone dust at the rate 0.08 cumt. including spreading in uniform thickness, hand
Rupees One Thousand Two Hundred
2 2.00 packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, 1267.00 cum
Sixty Seven Only
applying and brooming type of screning/binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density.
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- Mashin Crused stone
Rupees Three Thousand Seventy Five
3 2.00 aggregates 40 mmnominal size) and curing complete including cost of formwork in (A) Foundation 3075.91 Cum
and Ninety One Paise Only
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 80 mm thick with
grade of concrete M300 pnumatic compressed / vibrated mechanically and as per approved
Rupees Seven Hundred Twenty One
4 18.00 design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint 721.14 Sqmt
and Fourteen Paise Only
with sand in proper line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
Providing cement vata (10cm. x 10 cm. size) quarter roundin cement mortar 1:1 including neat Rupees Seventy Seven and Twenty
cement finishing,watering etc. complete. Eight Paise Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Nand Kuvarbaugh Near (Gayatri Chowk)
Item No. but may be Item of work Unit
In figures In words estimated
Plantations & Greenery
Preparation of Beds and Plantation for Hedging & Shrubbery: Preparation of beds for hedging and
shrubbery by excavating the soil to a depth of 60 cm and trenching the excavated base to a
further depth of 30 cm, including breaking of clods; refilling the excavated earth after mixing with
sludge or well-decomposed farmyard manure in the ratio of 8:1 (8 parts of stacked volume of
earth after 20% reduction to 1 part of stacked volume of sludge/manure after 8% reduction);
flooding with water; making good any settlement by filling with earth wherever necessary;
watering; fine dressing and leveling of beds; stacking and disposal of unserviceable material and Rupees One Hundred Seventy Six and
surplus earth by spreading and leveling as directed within a lead of 50 m and lift up to 1.5 m; and Seventy Five Paise Only
providing and planting approved healthy hedge/shrub plants/saplings in prepared beds at the
specified spacing, including digging planting holes, placing plants, refilling, firming the soil, initial
watering and establishment of plantation, complete as directed by the Engineer-in-Charge.
Providing, supplying and fixing Mild Steel Tree Guard, round type, fabricated from Mild Steel
conforming to IS 2062, having 450 mm diameter and 1000 mm height excluding leg height,
complete with 3 Nos. Mild Steel supporting legs and Mild Steel mesh/sides of 3 mm thickness,
having mesh aperture of approximately 40 mm × 70 mm, including cutting, bending,
straightening, fabrication, welding, grinding, drilling wherever required, making all necessary Rupees Five Hundred Fifty Nine and
2 3.00 joints and connections, providing suitable stiffeners/rings, surface preparation, application of 559.85 Each
Eighty Five Paise Only
epoxy paint, loading, unloading, transportation, handling, shifting and fixing/embedding of the
tree guard at site, including all labour, materials, tools, tackles, equipment and incidental works,
complete in all respects as per the approved drawing, specifications and directions of the
Engineer-in-Charge.*
Stainless Steel Bench seating Capacity of 3&4 seater with installation and paintng Banch selection
1 2.00 8000.00 Rupees Eight Thousand Only Each
as per Engineer in charge
Total Amount Rs.
Total Amount Rs.
Rupees Forty Two Thousand Two Hundred Ninety One Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Nand Kuvarbaugh Near (Gayatri Chowk)
Item No. but may be Item of work Unit
In figures In words estimated
I/We are aready to carry out the above mentioned work @___________above/below the Estimated Rates mentioned above and position of My/Our tender works out as under ::
IF TENDER IS BELOW IF TENDER IS ABOVE
[1] Estimated cost of work Rs. Estimate cost of work Rs.
[2] Deduct % below_________ Rs. Deduct % Above_________ Rs.
[3] Net amount of Tender Rs. Net amount of Tender Rs.
[4] Rs. In words Rs. Rs. In words Rs.
nature of contractor Chief Officer
Mahuva Nagar Seva Sadan
1) All the work shall be carried out as per Public Works Deptt., Hand Book, and other I.S. Specifications and other I.S. Specifications and other specifications of the Division or as directed.
2) All the columns in Schedule should be filled in Ink and Total of the entires in the Last column should be struck by the contractor under his signature.
3) Rates quoted includes clearance of site (prior to commencement of work and at its closer) in all respects and hold good for work under all conditions, site moisture weather etc.
4) The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6 /32772/N Dtd. 26.4.78 and as per G.R. No. TNC/9/24/C Dtd. 18.11.91 as directed by
5) Testing of materials be as per statement attached with the Specifications, the materials shall be testes. Bill for testing shall be paid by the Deptt., and 1% of the (one percent) of amount put to tender
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated
8) In R.C.C. item where there is a change in grade of mix or change as per actual mix design the difference of cement consumption shall be added/deducted from rate of original item at the rate of star
9) As per Govt. in Finance Department Reso. Dt. 15.09.2018 and No.GST/1017/1087/GST Cell and No. TJR/102017/599/Z, Dt.28.09.2018 GST from the bill above Rs.2.50 lacs shall be deducted at 1%
Signature of contractor Chief Officer
Mahuva Nagar Seva Sadan
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable School No-4 Near Nava Zapa Area
Item No. but may be Item of work Unit
In figures In words estimated
Box cutting the road surface to proper slope and camber for making a base for road work
Rupees One Hundred Twelve and One
1 18.00 including removing the excavated stuff and depositing on the road side slope as directed upto 112.02 cum
Providing & laying spreading and compacting 150 mm thick WBM Grade I of B.T.M.C. metal 45mm
to 63mm size including using 29% (22+7%) filler i.e. stone screeing 13.2 mm at the rate
Cumt. & stone dust at the rate 0.08 cumt. including spreading in uniform thickness, hand
Rupees One Thousand Two Hundred
2 6.00 packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, 1267.00 cum
Sixty Seven Only
applying and brooming type of screning/binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density.
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- Mashin Crused stone
Rupees Three Thousand Seventy Five
3 6.00 aggregates 40 mmnominal size) and curing complete including cost of formwork in (A) Foundation 3075.91 Cum
and Ninety One Paise Only
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 80 mm thick with
grade of concrete M300 pnumatic compressed / vibrated mechanically and as per approved
Rupees Seven Hundred Twenty One
4 60.00 design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint 721.14 Sqmt
and Fourteen Paise Only
with sand in proper line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
Providing cement vata (10cm. x 10 cm. size) quarter roundin cement mortar 1:1 including neat Rupees Seventy Seven and Twenty
cement finishing,watering etc. complete. Eight Paise Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable School No-4 Near Nava Zapa Area
Item No. but may be Item of work Unit
In figures In words estimated
Plantations & Greenery
Preparation of Beds and Plantation for Hedging & Shrubbery: Preparation of beds for hedging and
shrubbery by excavating the soil to a depth of 60 cm and trenching the excavated base to a
further depth of 30 cm, including breaking of clods; refilling the excavated earth after mixing with
sludge or well-decomposed farmyard manure in the ratio of 8:1 (8 parts of stacked volume of
earth after 20% reduction to 1 part of stacked volume of sludge/manure after 8% reduction);
flooding with water; making good any settlement by filling with earth wherever necessary;
watering; fine dressing and leveling of beds; stacking and disposal of unserviceable material and Rupees One Hundred Seventy Six and
surplus earth by spreading and leveling as directed within a lead of 50 m and lift up to 1.5 m; and Seventy Five Paise Only
providing and planting approved healthy hedge/shrub plants/saplings in prepared beds at the
specified spacing, including digging planting holes, placing plants, refilling, firming the soil, initial
watering and establishment of plantation, complete as directed by the Engineer-in-Charge.
Providing, supplying and fixing Mild Steel Tree Guard, round type, fabricated from Mild Steel
conforming to IS 2062, having 450 mm diameter and 1000 mm height excluding leg height,
complete with 3 Nos. Mild Steel supporting legs and Mild Steel mesh/sides of 3 mm thickness,
having mesh aperture of approximately 40 mm × 70 mm, including cutting, bending,
straightening, fabrication, welding, grinding, drilling wherever required, making all necessary Rupees Five Hundred Fifty Nine and
2 4.00 joints and connections, providing suitable stiffeners/rings, surface preparation, application of 559.85 Each
Eighty Five Paise Only
epoxy paint, loading, unloading, transportation, handling, shifting and fixing/embedding of the
tree guard at site, including all labour, materials, tools, tackles, equipment and incidental works,
complete in all respects as per the approved drawing, specifications and directions of the
Engineer-in-Charge.*
Stainless Steel Bench seating Capacity of 3&4 seater with installation and paintng Banch selection
1 3.00 8000.00 Rupees Eight Thousand Only Each
as per Engineer in charge
Total Amount Rs.
Total Amount Rs.
Rupees One lakh Two Thousand Three Hundred Eighty Five Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable School No-4 Near Nava Zapa Area
Item No. but may be Item of work Unit
In figures In words estimated
I/We are aready to carry out the above mentioned work @___________above/below the Estimated Rates mentioned above and position of My/Our tender works out as under ::
IF TENDER IS BELOW IF TENDER IS ABOVE
[1] Estimated cost of work Rs. Estimate cost of work Rs.
[2] Deduct % below_________ Rs. Deduct % Above_________ Rs.
[3] Net amount of Tender Rs. Net amount of Tender Rs.
[4] Rs. In words Rs. Rs. In words Rs.
nature of contractor Chief Officer
Mahuva Nagar Seva Sadan
1) All the work shall be carried out as per Public Works Deptt., Hand Book, and other I.S. Specifications and other I.S. Specifications and other specifications of the Division or as directed.
2) All the columns in Schedule should be filled in Ink and Total of the entires in the Last column should be struck by the contractor under his signature.
3) Rates quoted includes clearance of site (prior to commencement of work and at its closer) in all respects and hold good for work under all conditions, site moisture weather etc.
4) The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6 /32772/N Dtd. 26.4.78 and as per G.R. No. TNC/9/24/C Dtd. 18.11.91 as directed by
5) Testing of materials be as per statement attached with the Specifications, the materials shall be testes. Bill for testing shall be paid by the Deptt., and 1% of the (one percent) of amount put to tender
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated
8) In R.C.C. item where there is a change in grade of mix or change as per actual mix design the difference of cement consumption shall be added/deducted from rate of original item at the rate of star
9) As per Govt. in Finance Department Reso. Dt. 15.09.2018 and No.GST/1017/1087/GST Cell and No. TJR/102017/599/Z, Dt.28.09.2018 GST from the bill above Rs.2.50 lacs shall be deducted at 1%
Signature of contractor Chief Officer
Mahuva Nagar Seva Sadan
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable School No-12 Nootan Nagar Area
Item No. but may be Item of work Unit
In figures In words estimated
Box cutting the road surface to proper slope and camber for making a base for road work
Rupees One Hundred Twelve and One
1 23.00 including removing the excavated stuff and depositing on the road side slope as directed upto 112.02 cum
Providing & laying spreading and compacting 150 mm thick WBM Grade I of B.T.M.C. metal 45mm
to 63mm size including using 29% (22+7%) filler i.e. stone screeing 13.2 mm at the rate
Cumt. & stone dust at the rate 0.08 cumt. including spreading in uniform thickness, hand
Rupees One Thousand Two Hundred
2 8.00 packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, 1267.00 cum
Sixty Seven Only
applying and brooming type of screning/binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density.
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- Mashin Crused stone
Rupees Three Thousand Seventy Five
3 8.00 aggregates 40 mmnominal size) and curing complete including cost of formwork in (A) Foundation 3075.91 Cum
and Ninety One Paise Only
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 80 mm thick with
grade of concrete M300 pnumatic compressed / vibrated mechanically and as per approved
Rupees Seven Hundred Twenty One
4 76.00 design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint 721.14 Sqmt
and Fourteen Paise Only
with sand in proper line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
Providing cement vata (10cm. x 10 cm. size) quarter roundin cement mortar 1:1 including neat Rupees Seventy Seven and Twenty
cement finishing,watering etc. complete. Eight Paise Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable School No-12 Nootan Nagar Area
Item No. but may be Item of work Unit
In figures In words estimated
Plantations & Greenery
Preparation of Beds and Plantation for Hedging & Shrubbery: Preparation of beds for hedging and
shrubbery by excavating the soil to a depth of 60 cm and trenching the excavated base to a
further depth of 30 cm, including breaking of clods; refilling the excavated earth after mixing with
sludge or well-decomposed farmyard manure in the ratio of 8:1 (8 parts of stacked volume of
earth after 20% reduction to 1 part of stacked volume of sludge/manure after 8% reduction);
flooding with water; making good any settlement by filling with earth wherever necessary;
watering; fine dressing and leveling of beds; stacking and disposal of unserviceable material and Rupees One Hundred Seventy Six and
surplus earth by spreading and leveling as directed within a lead of 50 m and lift up to 1.5 m; and Seventy Five Paise Only
providing and planting approved healthy hedge/shrub plants/saplings in prepared beds at the
specified spacing, including digging planting holes, placing plants, refilling, firming the soil, initial
watering and establishment of plantation, complete as directed by the Engineer-in-Charge.
Providing, supplying and fixing Mild Steel Tree Guard, round type, fabricated from Mild Steel
conforming to IS 2062, having 450 mm diameter and 1000 mm height excluding leg height,
complete with 3 Nos. Mild Steel supporting legs and Mild Steel mesh/sides of 3 mm thickness,
having mesh aperture of approximately 40 mm × 70 mm, including cutting, bending,
straightening, fabrication, welding, grinding, drilling wherever required, making all necessary Rupees Five Hundred Fifty Nine and
2 4.00 joints and connections, providing suitable stiffeners/rings, surface preparation, application of 559.85 Each
Eighty Five Paise Only
epoxy paint, loading, unloading, transportation, handling, shifting and fixing/embedding of the
tree guard at site, including all labour, materials, tools, tackles, equipment and incidental works,
complete in all respects as per the approved drawing, specifications and directions of the
Engineer-in-Charge.*
Stainless Steel Bench seating Capacity of 3&4 seater with installation and paintng Banch selection
1 3.00 8000.00 Rupees Eight Thousand Only Each
as per Engineer in charge
Total Amount Rs.
Total Amount Rs.
Rupees One lakh Twenty Two Thousand Seven Hundred Eighty Two Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable School No-12 Nootan Nagar Area
Item No. but may be Item of work Unit
In figures In words estimated
I/We are aready to carry out the above mentioned work @___________above/below the Estimated Rates mentioned above and position of My/Our tender works out as under ::
IF TENDER IS BELOW IF TENDER IS ABOVE
[1] Estimated cost of work Rs. Estimate cost of work Rs.
[2] Deduct % below_________ Rs. Deduct % Above_________ Rs.
[3] Net amount of Tender Rs. Net amount of Tender Rs.
[4] Rs. In words Rs. Rs. In words Rs.
nature of contractor Chief Officer
Mahuva Nagar Seva Sadan
1) All the work shall be carried out as per Public Works Deptt., Hand Book, and other I.S. Specifications and other I.S. Specifications and other specifications of the Division or as directed.
2) All the columns in Schedule should be filled in Ink and Total of the entires in the Last column should be struck by the contractor under his signature.
3) Rates quoted includes clearance of site (prior to commencement of work and at its closer) in all respects and hold good for work under all conditions, site moisture weather etc.
4) The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6 /32772/N Dtd. 26.4.78 and as per G.R. No. TNC/9/24/C Dtd. 18.11.91 as directed by
5) Testing of materials be as per statement attached with the Specifications, the materials shall be testes. Bill for testing shall be paid by the Deptt., and 1% of the (one percent) of amount put to tender
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated
8) In R.C.C. item where there is a change in grade of mix or change as per actual mix design the difference of cement consumption shall be added/deducted from rate of original item at the rate of star
9) As per Govt. in Finance Department Reso. Dt. 15.09.2018 and No.GST/1017/1087/GST Cell and No. TJR/102017/599/Z, Dt.28.09.2018 GST from the bill above Rs.2.50 lacs shall be deducted at 1%
Signature of contractor Chief Officer
Mahuva Nagar Seva Sadan
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Shital Society Pase
Item No. but may be Item of work Unit
In figures In words estimated
Box cutting the road surface to proper slope and camber for making a base for road work
Rupees One Hundred Twelve and One
1 25.00 including removing the excavated stuff and depositing on the road side slope as directed upto 112.02 cum
Providing & laying spreading and compacting 150 mm thick WBM Grade I of B.T.M.C. metal 45mm
to 63mm size including using 29% (22+7%) filler i.e. stone screeing 13.2 mm at the rate
Cumt. & stone dust at the rate 0.08 cumt. including spreading in uniform thickness, hand
Rupees One Thousand Two Hundred
2 8.00 packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, 1267.00 cum
Sixty Seven Only
applying and brooming type of screning/binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density.
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- Mashin Crused stone
Rupees Three Thousand Seventy Five
3 8.00 aggregates 40 mmnominal size) and curing complete including cost of formwork in (A) Foundation 3075.91 Cum
and Ninety One Paise Only
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 80 mm thick with
grade of concrete M300 pnumatic compressed / vibrated mechanically and as per approved
Rupees Seven Hundred Twenty One
4 83.00 design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint 721.14 Sqmt
and Fourteen Paise Only
with sand in proper line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
Providing cement vata (10cm. x 10 cm. size) quarter roundin cement mortar 1:1 including neat Rupees Seventy Seven and Twenty
cement finishing,watering etc. complete. Eight Paise Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Shital Society Pase
Item No. but may be Item of work Unit
In figures In words estimated
Plantations & Greenery
Preparation of Beds and Plantation for Hedging & Shrubbery: Preparation of beds for hedging and
shrubbery by excavating the soil to a depth of 60 cm and trenching the excavated base to a
further depth of 30 cm, including breaking of clods; refilling the excavated earth after mixing with
sludge or well-decomposed farmyard manure in the ratio of 8:1 (8 parts of stacked volume of
earth after 20% reduction to 1 part of stacked volume of sludge/manure after 8% reduction);
flooding with water; making good any settlement by filling with earth wherever necessary;
watering; fine dressing and leveling of beds; stacking and disposal of unserviceable material and Rupees One Hundred Seventy Six and
surplus earth by spreading and leveling as directed within a lead of 50 m and lift up to 1.5 m; and Seventy Five Paise Only
providing and planting approved healthy hedge/shrub plants/saplings in prepared beds at the
specified spacing, including digging planting holes, placing plants, refilling, firming the soil, initial
watering and establishment of plantation, complete as directed by the Engineer-in-Charge.
Providing, supplying and fixing Mild Steel Tree Guard, round type, fabricated from Mild Steel
conforming to IS 2062, having 450 mm diameter and 1000 mm height excluding leg height,
complete with 3 Nos. Mild Steel supporting legs and Mild Steel mesh/sides of 3 mm thickness,
having mesh aperture of approximately 40 mm × 70 mm, including cutting, bending,
straightening, fabrication, welding, grinding, drilling wherever required, making all necessary Rupees Five Hundred Fifty Nine and
2 5.00 joints and connections, providing suitable stiffeners/rings, surface preparation, application of 559.85 Each
Eighty Five Paise Only
epoxy paint, loading, unloading, transportation, handling, shifting and fixing/embedding of the
tree guard at site, including all labour, materials, tools, tackles, equipment and incidental works,
complete in all respects as per the approved drawing, specifications and directions of the
Engineer-in-Charge.*
Stainless Steel Bench seating Capacity of 3&4 seater with installation and paintng Banch selection
1 4.00 8000.00 Rupees Eight Thousand Only Each
as per Engineer in charge
Total Amount Rs.
Total Amount Rs.
Rupees One lakh Thirty Seven Thousand Five Hundred Sixty Four Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Shital Society Pase
Item No. but may be Item of work Unit
In figures In words estimated
I/We are aready to carry out the above mentioned work @___________above/below the Estimated Rates mentioned above and position of My/Our tender works out as under ::
IF TENDER IS BELOW IF TENDER IS ABOVE
[1] Estimated cost of work Rs. Estimate cost of work Rs.
[2] Deduct % below_________ Rs. Deduct % Above_________ Rs.
[3] Net amount of Tender Rs. Net amount of Tender Rs.
[4] Rs. In words Rs. Rs. In words Rs.
nature of contractor Chief Officer
Mahuva Nagar Seva Sadan
1) All the work shall be carried out as per Public Works Deptt., Hand Book, and other I.S. Specifications and other I.S. Specifications and other specifications of the Division or as directed.
2) All the columns in Schedule should be filled in Ink and Total of the entires in the Last column should be struck by the contractor under his signature.
3) Rates quoted includes clearance of site (prior to commencement of work and at its closer) in all respects and hold good for work under all conditions, site moisture weather etc.
4) The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6 /32772/N Dtd. 26.4.78 and as per G.R. No. TNC/9/24/C Dtd. 18.11.91 as directed by
5) Testing of materials be as per statement attached with the Specifications, the materials shall be testes. Bill for testing shall be paid by the Deptt., and 1% of the (one percent) of amount put to tender
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated
8) In R.C.C. item where there is a change in grade of mix or change as per actual mix design the difference of cement consumption shall be added/deducted from rate of original item at the rate of star
9) As per Govt. in Finance Department Reso. Dt. 15.09.2018 and No.GST/1017/1087/GST Cell and No. TJR/102017/599/Z, Dt.28.09.2018 GST from the bill above Rs.2.50 lacs shall be deducted at 1%
Signature of contractor Chief Officer
Mahuva Nagar Seva Sadan
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Near Taarvaadi (Nava Zapa)
Item No. but may be Item of work Unit
In figures In words estimated
Box cutting the road surface to proper slope and camber for making a base for road work
Rupees One Hundred Twelve and One
1 9.00 including removing the excavated stuff and depositing on the road side slope as directed upto 112.02 cum
Providing & laying spreading and compacting 150 mm thick WBM Grade I of B.T.M.C. metal 45mm
to 63mm size including using 29% (22+7%) filler i.e. stone screeing 13.2 mm at the rate
Cumt. & stone dust at the rate 0.08 cumt. including spreading in uniform thickness, hand
Rupees One Thousand Two Hundred
2 3.00 packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, 1267.00 cum
Sixty Seven Only
applying and brooming type of screning/binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density.
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- Mashin Crused stone
Rupees Three Thousand Seventy Five
3 3.00 aggregates 40 mmnominal size) and curing complete including cost of formwork in (A) Foundation 3075.91 Cum
and Ninety One Paise Only
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 80 mm thick with
grade of concrete M300 pnumatic compressed / vibrated mechanically and as per approved
Rupees Seven Hundred Twenty One
4 31.00 design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint 721.14 Sqmt
and Fourteen Paise Only
with sand in proper line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
Providing cement vata (10cm. x 10 cm. size) quarter roundin cement mortar 1:1 including neat Rupees Seventy Seven and Twenty
cement finishing,watering etc. complete. Eight Paise Only
20mm thicks and faced cement plaster on walls upto height 10 metres above ground level
Rupees Three Hundred Twenty Six and
6 31.00 consisting of 12mm thick backing coat of C.M.1:3 (1-cement:3- sand) and 8 mm thick finishing 326.11 Sqmt
Eleven Paise Only
coat of C.M. 1:1 (1-cement : 1-sand) etc. complete.
Finishing wall with weather proof exterior emulsion paint on wall surface (two coats) to give an
Rupees One Hundred Fourteen and
7 31.00 required shape even shade after thoroughly brushing the surface to remove all dirt, and 114.53 Sqmt
Fifty Three Paise Only
remains of loose powdered materials.etc complete,
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Near Taarvaadi (Nava Zapa)
Item No. but may be Item of work Unit
In figures In words estimated
Plantations & Greenery
Preparation of Beds and Plantation for Hedging & Shrubbery: Preparation of beds for hedging and
shrubbery by excavating the soil to a depth of 60 cm and trenching the excavated base to a
further depth of 30 cm, including breaking of clods; refilling the excavated earth after mixing with
sludge or well-decomposed farmyard manure in the ratio of 8:1 (8 parts of stacked volume of
earth after 20% reduction to 1 part of stacked volume of sludge/manure after 8% reduction);
flooding with water; making good any settlement by filling with earth wherever necessary;
watering; fine dressing and leveling of beds; stacking and disposal of unserviceable material and Rupees One Hundred Seventy Six and
surplus earth by spreading and leveling as directed within a lead of 50 m and lift up to 1.5 m; and Seventy Five Paise Only
providing and planting approved healthy hedge/shrub plants/saplings in prepared beds at the
specified spacing, including digging planting holes, placing plants, refilling, firming the soil, initial
watering and establishment of plantation, complete as directed by the Engineer-in-Charge.
Providing, supplying and fixing Mild Steel Tree Guard, round type, fabricated from Mild Steel
conforming to IS 2062, having 450 mm diameter and 1000 mm height excluding leg height,
complete with 3 Nos. Mild Steel supporting legs and Mild Steel mesh/sides of 3 mm thickness,
having mesh aperture of approximately 40 mm × 70 mm, including cutting, bending,
straightening, fabrication, welding, grinding, drilling wherever required, making all necessary Rupees Five Hundred Fifty Nine and
2 5.00 joints and connections, providing suitable stiffeners/rings, surface preparation, application of 559.85 Each
Eighty Five Paise Only
epoxy paint, loading, unloading, transportation, handling, shifting and fixing/embedding of the
tree guard at site, including all labour, materials, tools, tackles, equipment and incidental works,
complete in all respects as per the approved drawing, specifications and directions of the
Engineer-in-Charge.*
Stainless Steel Bench seating Capacity of 3&4 seater with installation and paintng Banch selection
1 2.00 8000.00 Rupees Eight Thousand Only Each
as per Engineer in charge
Total Amount Rs.
Total Amount Rs.
Rupees Seventy Two Thousand Three Hundred Sixty Three Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Near Taarvaadi (Nava Zapa)
Item No. but may be Item of work Unit
In figures In words estimated
I/We are aready to carry out the above mentioned work @___________above/below the Estimated Rates mentioned above and position of My/Our tender works out as under ::
IF TENDER IS BELOW IF TENDER IS ABOVE
[1] Estimated cost of work Rs. Estimate cost of work Rs.
[2] Deduct % below_________ Rs. Deduct % Above_________ Rs.
[3] Net amount of Tender Rs. Net amount of Tender Rs.
[4] Rs. In words Rs. Rs. In words Rs.
nature of contractor Chief Officer
Mahuva Nagar Seva Sadan
1) All the work shall be carried out as per Public Works Deptt., Hand Book, and other I.S. Specifications and other I.S. Specifications and other specifications of the Division or as directed.
2) All the columns in Schedule should be filled in Ink and Total of the entires in the Last column should be struck by the contractor under his signature.
3) Rates quoted includes clearance of site (prior to commencement of work and at its closer) in all respects and hold good for work under all conditions, site moisture weather etc.
4) The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6 /32772/N Dtd. 26.4.78 and as per G.R. No. TNC/9/24/C Dtd. 18.11.91 as directed by
5) Testing of materials be as per statement attached with the Specifications, the materials shall be testes. Bill for testing shall be paid by the Deptt., and 1% of the (one percent) of amount put to tender
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated
8) In R.C.C. item where there is a change in grade of mix or change as per actual mix design the difference of cement consumption shall be added/deducted from rate of original item at the rate of star
9) As per Govt. in Finance Department Reso. Dt. 15.09.2018 and No.GST/1017/1087/GST Cell and No. TJR/102017/599/Z, Dt.28.09.2018 GST from the bill above Rs.2.50 lacs shall be deducted at 1%
Signature of contractor Chief Officer
Mahuva Nagar Seva Sadan
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Water Tank Same (Gandhibaugh)
Item No. but may be Item of work Unit
In figures In words estimated
Box cutting the road surface to proper slope and camber for making a base for road work
Rupees One Hundred Twelve and One
1 14.00 including removing the excavated stuff and depositing on the road side slope as directed upto 112.02 cum
Providing & laying spreading and compacting 150 mm thick WBM Grade I of B.T.M.C. metal 45mm
to 63mm size including using 29% (22+7%) filler i.e. stone screeing 13.2 mm at the rate
Cumt. & stone dust at the rate 0.08 cumt. including spreading in uniform thickness, hand
Rupees One Thousand Two Hundred
2 5.00 packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, 1267.00 cum
Sixty Seven Only
applying and brooming type of screning/binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density.
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- Mashin Crused stone
Rupees Three Thousand Seventy Five
3 5.00 aggregates 40 mmnominal size) and curing complete including cost of formwork in (A) Foundation 3075.91 Cum
and Ninety One Paise Only
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block 80 mm thick with
grade of concrete M300 pnumatic compressed / vibrated mechanically and as per approved
Rupees Seven Hundred Twenty One
4 46.00 design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint 721.14 Sqmt
and Fourteen Paise Only
with sand in proper line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
Providing cement vata (10cm. x 10 cm. size) quarter roundin cement mortar 1:1 including neat Rupees Seventy Seven and Twenty
cement finishing,watering etc. complete. Eight Paise Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Water Tank Same (Gandhibaugh)
Item No. but may be Item of work Unit
In figures In words estimated
Plantations & Greenery
Preparation of Beds and Plantation for Hedging & Shrubbery: Preparation of beds for hedging and
shrubbery by excavating the soil to a depth of 60 cm and trenching the excavated base to a
further depth of 30 cm, including breaking of clods; refilling the excavated earth after mixing with
sludge or well-decomposed farmyard manure in the ratio of 8:1 (8 parts of stacked volume of
earth after 20% reduction to 1 part of stacked volume of sludge/manure after 8% reduction);
flooding with water; making good any settlement by filling with earth wherever necessary;
watering; fine dressing and leveling of beds; stacking and disposal of unserviceable material and Rupees One Hundred Seventy Six and
surplus earth by spreading and leveling as directed within a lead of 50 m and lift up to 1.5 m; and Seventy Five Paise Only
providing and planting approved healthy hedge/shrub plants/saplings in prepared beds at the
specified spacing, including digging planting holes, placing plants, refilling, firming the soil, initial
watering and establishment of plantation, complete as directed by the Engineer-in-Charge.
Providing, supplying and fixing Mild Steel Tree Guard, round type, fabricated from Mild Steel
conforming to IS 2062, having 450 mm diameter and 1000 mm height excluding leg height,
complete with 3 Nos. Mild Steel supporting legs and Mild Steel mesh/sides of 3 mm thickness,
having mesh aperture of approximately 40 mm × 70 mm, including cutting, bending,
straightening, fabrication, welding, grinding, drilling wherever required, making all necessary Rupees Five Hundred Fifty Nine and
2 5.00 joints and connections, providing suitable stiffeners/rings, surface preparation, application of 559.85 Each
Eighty Five Paise Only
epoxy paint, loading, unloading, transportation, handling, shifting and fixing/embedding of the
tree guard at site, including all labour, materials, tools, tackles, equipment and incidental works,
complete in all respects as per the approved drawing, specifications and directions of the
Engineer-in-Charge.*
Stainless Steel Bench seating Capacity of 3&4 seater with installation and paintng Banch selection
1 4.00 8000.00 Rupees Eight Thousand Only Each
as per Engineer in charge
Total Amount Rs.
Total Amount Rs.
Rupees Ninety Five Thousand Six Hundred Sixteen Only
MAHUVA NAGARPALIKA -MAHUVA
DIST.BHAVANAGAR
Name of Work :- Construction and Development of Garbage Vulnerable Water Tank Same (Gandhibaugh)
Item No. but may be Item of work Unit
In figures In words estimated
I/We are aready to carry out the above mentioned work @___________above/below the Estimated Rates mentioned above and position of My/Our tender works out as under ::
IF TENDER IS BELOW IF TENDER IS ABOVE
[1] Estimated cost of work Rs. Estimate cost of work Rs.
[2] Deduct % below_________ Rs. Deduct % Above_________ Rs.
[3] Net amount of Tender Rs. Net amount of Tender Rs.
[4] Rs. In words Rs. Rs. In words Rs.
nature of contractor Chief Officer
Mahuva Nagar Seva Sadan
1) All the work shall be carried out as per Public Works Deptt., Hand Book, and other I.S. Specifications and other I.S. Specifications and other specifications of the Division or as directed.
2) All the columns in Schedule should be filled in Ink and Total of the entires in the Last column should be struck by the contractor under his signature.
3) Rates quoted includes clearance of site (prior to commencement of work and at its closer) in all respects and hold good for work under all conditions, site moisture weather etc.
4) The contractor shall exhibit the details of work, tender amount and specifications as per Govt. Circular No. ED/6 /32772/N Dtd. 26.4.78 and as per G.R. No. TNC/9/24/C Dtd. 18.11.91 as directed by
5) Testing of materials be as per statement attached with the Specifications, the materials shall be testes. Bill for testing shall be paid by the Deptt., and 1% of the (one percent) of amount put to tender
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated
8) In R.C.C. item where there is a change in grade of mix or change as per actual mix design the difference of cement consumption shall be added/deducted from rate of original item at the rate of star
9) As per Govt. in Finance Department Reso. Dt. 15.09.2018 and No.GST/1017/1087/GST Cell and No. TJR/102017/599/Z, Dt.28.09.2018 GST from the bill above Rs.2.50 lacs shall be deducted at 1%
Signature of contractor Chief Officer
Mahuva Nagar Seva Sadan
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2. Form B-1.pdf
3.Schedule B.pdf
4.Term and condition-4.pdf
06 Vendor Civil work.pdf
07 TEST REQUIRE FOR CONSTRUCTION MATERIAL.pdf
Baalamsaapir dargaah (lati bazar ) Drawing-Model.pdf
Bhagirath na gate ni same Drawing-Model.pdf
Bhavani road Ramji mandir Drawing-Model.pdf
Darbar Gadh Drawing-Model.pdf
Gokul nagar Bapani madhi pase Drawing-Model.pdf
Jaj saheb na bunglow pase Drawing-Model.pdf
Kalbhairav chowk-Model.pdf
Kamdar kalyan kendra ni same Drawing-Model.pdf
Nandkuvarbaugh -Model.pdf
Near Tarvadi Drawing-Model.pdf
school no-4 near nava zapa area Drawing-Model.pdf
School No-12 Nutan nagar Drawing-Model.pdf
Shital society Drawing-Model.pdf
Water tank Drawing-Model.pdf
Buy Unbranded Tree Guard made of Mild Steel as per IS 2062 (GeM).pdf
Cast Iron Powder Coating Garden Bench Capacity 3 Seater GeM).pdf
1. Tender.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .