| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹100.0 LAccepted-AOC NULL | 1 | Accepted-AOC As per L1 | |
| 2 | 2₹85.7 L+₹98,048.50 (1.16%)Rejected-Finance H NO 1744 GOKULWADI SANQUELIM GOA | NORTH GOA | GOA | 403001 | 2 | Rejected-Finance 2 |
Tender Value
₹95.2 L
EMD Value
₹1.9 L
Closing Date
26 Jul 2023, 5:30 pmClosed
EE VI WRD Bicholim
EE VI WRD Bicholim
Construction of protection wall to L.I.Scheme Morlem Part III at Gimaywada Morlem in Sattari Taluka. (II Call)
2023_WRD_9953_1
No.WRD/WDVI/Accts/F.17/ TN-e 15/2023-24/360 Line 1
Open Tender
Civil Works - Water Works
Item Rate
120 days
Bicholim
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,000
₹1.9 L
12 Feb 2025
12 Jul 2023
27 Jul 2023
12 Jul 2023
26 Jul 2023
12 Jul 2023
Amount
Earthwork in excavation in all types of strata comprising any of the materials such as soil, silt clay, gravel, murrum of all varietys, shingles, pebbles and all types of conglomerates leterite rock, soft rock, ordinary rock, disintegrated rock, fissured rock, weathyer rock, shattered rock, decomposed rock and all such other materials either in full or in part as the case may be adopting any method or methods as may be convenient or permitted including chiselling, wedging etc. but blasting probhited in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including pumping and bailing out water including setting out construction of shoring and bracing in removal of stumps and other deleterious materials, dressing of sides and bottom and back filling the excavated earth to the extend required and disposing off the remaining excavated soil/ rock as directed by Engineer In Charge for initial lead of 50 m and all lifts etc. complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level
Centering and shuttering including struttings, propping etc. and removal of formwork for : a) Foundations, footings, bases for columns and mass concrete
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge. a)110 mm dia
Providing and Fixing construction joint with 20 mm thick thermocol sheets at specific intervals in Retaining wall.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation rom drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 as per MORTH specification 305
Khaja Husen Abdul Raudar
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .