| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical | Rejected-Technical Does not Qualify as per PQR |
| 3 | Rejected-Technical | Rejected-Technical Does not Qualify as per PQR |
| 4 | Rejected-Technical JHAWAREDI POST KARBARI IDBI BANK COMPLEX SHIMLA ROAD DEHRADUN | Rejected-Technical Does not Qualify as per PQR |
| 5 | Rejected-Technical 221 VIJAY PARK EXTENSION LANE NO 11 DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | Rejected-Technical Does not Qualify as per PQR |
Tender Value
₹22.6 L
EMD Value
₹68,000
Closing Date
24 Jul 2020, 1:00 pmClosed
Superintending Engineer
Electricity Distribution Circle(R) 18 E C Road, Dehradun
Shifting of 33 KV line OPTO feeder due to damage of under construction line near Ishwar Vihar Tapovan River in the area of EDD Raipur Dehradun
2020_UPCL4_24651_1
10/EDCRDDUN/2020-21
Open Tender
Electrical Works
Item Wise
30 days
Dehradun
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
EE, ETD(R)
₹68,000
15 Sept 2020
27 Jun 2020
25 Jul 2020
28 Jun 2020
24 Jul 2020
28 Jun 2020
Amount
Cartage of Steel Tubular (Galvanized) and PCC Poles from store centre to nearest road site with loading, unloading at both points. (Loading, unloading plus carriage per pole.)
Cartage of small material by vehicle from store centre to nearest road site including loading and unloading at both ends.
Head load Cartage of the following poles from road side to construction site (rates are per Pole / Km. including loading/unloading at both points)
a) SP-72 (Galvanized)
b) SP-55 (Galvanized)
Head load cartage of small material. Rates are per Km/Quintal including loading and unloading.
Excavation of Foundation pit for erection of pole in all type of soil and fixing of all accessories of pole and rection of support and grouting of pole in CC ratio 1:4:8 block including cost of ballast, cement and sand, back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESPO construction Manual. Single support (erection+grouting)
SP-55 (Galvanized)
b) SP-55 (Galvanized)
Excavation of foundation pit for erection of double pole support as per RESPO Specification of the following types of pole in boulder mixed soil, grouting of support in CC 1:4:8 block including cost of ballast, cement and sand, back filling of soil and boulders in pit and ramming fitting of accessories on the pole, levelling and erection of double pole. Double support (erection+grouting)
a) SP-55 (Galvanized)
Muffing of Pole
Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracking and special type bracket etc. as per RESPO schedule and local approved drawing.
Erection with digging of pits for Stay as per RESPO manual in all type of soil, grouting of Stay rod with Cc 1:4:8 cement block including cost of ballast, cement and sand, after grouting back filling of soil and boulders in the pit and ramming, nozzaling and fixing of Stay wire with Pole and stay rod as per drawing for 11 KV / 33 KV
Laying, Spreading, Stringing and sagging of 11KV /33 KV line in 3 phase (3 Phase 4 wire) of the following wire as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and sagging chart. for Panther (33 KV line)
Stringing of earth wire
Special type earthing of LA including welding of earth strip
Guarding of line over (Telephone / Road / L.T. line crossing as per drawing with 6/8 SWG G.I. wire including fixing of guarding channel/angle as per RESPo manual. L.T./11 KV / 33 KV
Fixing of bracing set on double pole and four pole.
Mounting and fixing of Lightning arrestor set (3 Nos.) on double pole structure including making all connections by G.I.Strip size 35×6 mm to earth point (including cost of G.I.Strip)
Painting of poles with angle and channel and all steel part by one coat of Red Oxide Primer and two coats of Aluminum Paint and two strip of fluorescent alternate Red and White paint 30 Cm wide upto 1.5 Mtrs. from ground level.
Jumpering of double/four pole.
Re-erection of pole with all accessories
a) Single ST Pole SP-55
b) Double ST Pole SP-55
c) Four ST Pole SP-55
Dismantling of existing LT/HT line and transformer etc. including disc fitting, insulator, clamps, Nut & Bolts and consumer connections and street light connections etc. for Single Pole.
a) ST Pole SP-55
b) Rail 90/105 lbs
Double Pole
a) ST Pole SP-55
Four Pole
a) ST Pole SP-55
33 KV Line with earth wire
a) ACSR Panther
b) Dismantling of accessories such as channel,agnle, insulator etc.
Construction of single pole protection as per construction mannual encloser, DSR 2014 (colum & footing foundation)
Construction of double pole protection as per construction mannual encloser, DSR 2014 (colum & footing foundation)
Route clearance by cutting of Tree branches / proning, loping and chopping of trees for L.T., 11 & 33 KV line.
Erection & Fixing of 33 KV extention bracket
Providing and fixing of Danger Board, unber plate complete by providing clamps of M.S. Flat 50×6 mm and Nuts & Bolts, Danger Boards of M.S. Sheet 2 mm Thick 11"×7" size (Including cost of all material).
Back carriage of dismantling material from site to store centre.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .