Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-Finance | ₹1.2 L | L1 | Accepted-Finance Lowest (L1) |
| 2 | L2₹1.2 L+₹304.85 (0.25%)Rejected-Finance 112 1 THAKURBARI STREET P O SERAMPORE HOOGHLY 712201 | SERAMPORE | HOOGHLY | WEST BENGAL | 712201 | ₹1.2 L+₹304.85 (0.25%) | L2 | Rejected-Finance Not L1 |
| 3 | L3₹1.2 L+₹469 (0.39%)Rejected-Finance 3X RAMKRISHNA NASKAR LANE KOLKATA 700010 WEST BENGAL INDIA | KOLKATA | WEST BENGAL | 700010 | ₹1.2 L+₹469 (0.39%) | L3 | Rejected-Finance Not L1 |
Tender Value
₹1.2 L
EMD Value
₹2,250
Closing Date
8 Jul 2026, 12:00 pmClosed
EE, DIV-IV, Housing (BSUP), Housing Sector, KMDA
OFFICE OF THE EXECUTIVE ENGINEER DIVISION-IV, HOUSING SECTOR (BSUP), KMDA. UNNAYAN BHAWAN, BLOCK A (6TH FLOOR), SALT LAKE CITY, KOL-91
Emergent surging 1 (one) no. of existing tubewell with changing column pipe beside of Block- 2 in KIT Housing Scheme No. BRS-II under Housing Sector, KMDA
2026_KMDA_1030186_1
10/EE/DIV-IV/Housing (BSUP)/KMDA of 2026-2027
Open Tender
CIVIL WORKS
Percentage
30 days
BRS-II
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹2,250
17 Jul 2026
30 Jun 2026
10 Jul 2026
30 Jun 2026
8 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lifting of existing submersible pump along with column pipe for surging a tubewell and lowering the same including column pipes in its required position after completion of surging works of the existing tubewell using tripod,chain,pully and other accessories. | 1 | No. | 6,300 | ₹6,300 |
| 2 | Development (Min. 8 Hr. continuous) of tube well by using suitable air compressor (Min. Capacity: 600CFM & operating Pressure 14 Bar) followed by yield testing with BHT pump (Head :45 to 50mtr.,Discharge :1100 to 1000 LPM and 25 BHP engine) all complete including To & Fro Transportation cost and Cost of fuels, lubricants & Labour etc. | 1 | L.S. | 56,908 | ₹56,908 |
| 3 | Supply & delivery of 75mm dia x 3mtr long UPVC column pipe screwed at both ends and one side with column socket complete with bolts, nut & rubber gasket having standard 80 mm DN(88mm OD), delivery pressure 17kgf/cm2, make Ashirvad | 9 | Nos. | 2,820.94 | ₹25,388.46 |
| 4 | Supply & delivery of 75 mm dia top & bottom adapter for UPVC column pipe, make Ashirvad. | 2 | Nos. | 3,097.5 | ₹6,195 |
| 5 | Lowering the Pump Motor set along with 9 nos. UPVC Pipe incl. commissioning etc. complete as per direction of EIC. | 1 | Item | 3,588 | ₹3,588 |
| 6 | Add Labour Welfare Cess @ 1% on Total amount over item No. 1 to 5 | 98,379 | Percentage | 0.01 | ₹983.79 |
| 7 | Add GST @ 18% on Total amount over item No. 1 to 6 | 99,363 | Percentage | 0.18 | ₹17,885.34 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.69 MB
Tendernotice_2.pdf
PDF • 0.16 MB
Tendernotice_3.pdf
PDF • 0.07 MB
BOQ_2529546.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .