Loading…
Loading…
Tender Value
₹44.8 L
EMD Value
₹89,670
Closing Date
27 Aug 2026, 4:00 pm3d left
DC Engr SHQ Almora
DC Engr SHQ Almora ITBP Bimola camp, Kosi, Almora UKD
Modification and UP gradation of existing jawan kitchen/cook house into modular kitchen at ITBP location in Johar Valley 163 km from 14th BN ITBP Pithoragarh UKD
2026_ITBP_920895_1
No- I.T.B.Police/SHQ (Almora)/ENGR/14th Bn /Tender/ 2026-27-66-
Open Tender
Civil Works - Buildings
Percentage
245 days
Johar Valley 163 km from 14th BN ITBP Pithoragarh
As per tender documents
3 documents required · 3 mandatory
₹0
₹89,670
7 Aug 2026
7 Aug 2026
28 Aug 2026
7 Aug 2026
27 Aug 2026
7 Aug 2026
7 Aug 2026 - 27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | 6.12 | Cum | 2,138.35 | ₹13,086.7 |
| 2 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: GS Sheet | 202.9 | sqm | 147.85 | ₹29,998.77 |
| 3 | Providing and fixing Pre-laminated flat pressed 3 layer (medium density) particle board or graded wood particle board IS : 3087 marked, with one side decorative and other side balancing lamination Grade I, Type II exterior grade IS : 12823 marked, in shelves with screws and fittings wherever required, edges to be painted with polyurethane primer (fittings to be paid separately):18 mm thick | 101.4 | sqm | 1,716.45 | ₹1,74,048.03 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 73.8 | cum | 267.15 | ₹19,715.67 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4 coarse sand (zone-III): 8 graded stone aggregate 40 mm nominal size). | 7.22 | Cum | 19,530.25 | ₹1,41,008.41 |
| 6 | Providing and fixing up to floor five level precast cement concrete solid block, including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering complete : 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 44.75 | Cum | 32,284.35 | ₹14,44,724.66 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.2 | Cum | 22,874.9 | ₹27,449.88 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | 23,468.7 | ₹23,466.35 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.78 | cum | 25,139.2 | ₹44,747.78 |
| 10 | Centering and shuttering including strutting,Propping etc and removal of form for Foundation footing based of columns,etc for mass concrete. | 21.6 | sqm | 430.2 | ₹9,292.32 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.24 MB
TenderDocs.pdf
Tender Documents • 0.75 MB
BOQ_967734.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].