Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹4.4 LAccepted-AOC | ₹4.4 L | l1 | Accepted-AOC LI |
| 2 | L2₹4.5 L+₹15,259 (3.49%)Rejected-AOC | ₹4.5 L+₹15,259 (3.49%) | L2 | Rejected-AOC L2 |
| 3 | L3₹4.7 L+₹29,604 (6.76%)Rejected-AOC | ₹4.7 L+₹29,604 (6.76%) | L3 | Rejected-AOC L3 |
| 4 | L4₹4.7 L+₹31,849 (7.28%)Rejected-AOC | ₹4.7 L+₹31,849 (7.28%) | L4 | Rejected-AOC L4 |
| 5 | L5₹5.4 L+₹1.0 L (23.2%)Rejected-AOC | ₹5.4 L+₹1.0 L (23.2%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | VISHNUDAS V L1 | Sreekumar C K L4 | M KAJHA HUSSAIN L3 | GOPALAN.M L5 | jollyjoseph L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Clearing Jungle & silt removal | ||||||||
| 1.00 | OD4699/2025-2026:Clearing the light jungle and grass from the canal bed and bund for water distribution. Including removal of rubbish up to a distance of 50m outside the periphery of the are cleared. | 19,372 | sqm | 7.94 ₹1,53,813.68 Lowest | 8.5 ₹1,64,662 | 8.48 ₹1,64,274.56 | 9.78 ₹1,89,458.16 | 8 ₹1,54,976 |
| 1.00 | OD4698/2025-2026:Engaging man mazdoor for various works to execute the work as per the directions of departmental officers at site. | 152 | no | 657.97 ₹1,00,011.44 Lowest | 706.6 ₹1,07,403.2 | 702.33 ₹1,06,754.16 | 810.55 ₹1,23,203.6 | 800 ₹1,21,600 |
| 1.00 | OD4700/2025-2026:Engaging hydraulic excavator including all cost of hire charge, driver, fuel and lubricants for removing debris, weeds and other major obstructions from canal bed prior to water distribution and including disposal of waste materials by mechanical means atleast 1m away from the side wall or as directed by Engineer-in-charge. | 168 | hour | 1,094.6 ₹1,83,892.8 | 1,175.6 ₹1,97,500.8 | 1,168.41 ₹1,96,292.88 | 1,348.44 ₹2,26,537.92 | 1,050 ₹1,76,400 Lowest |
Tender Value
Refer Docs
EMD Value
₹17,999
Closing Date
8 Jul 2025, 5:00 pmClosed
ASST EXECUTIVE ENGINEER
ASST EXECUTIVE ENGINEERCANAL SUB DIVISION ALATHUR
Action Plan_Dam Section_2025 26 Jungle Clearance and de silting of RBC from Ch 0 000 to 10 800 km and its branches for 2025 26
2025_Irrig_773431_1
13 IRR/PI/TR/2669/2025_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
360 days
ALATHUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,590
Yes
₹17,999
Yes
29 Sept 2025
1 Jul 2025
10 Jul 2025
1 Jul 2025
8 Jul 2025
1 Jul 2025
1 Jul 2025 - 3 Jul 2025
Amount
Clearing Jungle & silt removal
OD4699/2025-2026:Clearing the light jungle and grass from the canal bed and bund for water distribution. Including removal of rubbish up to a distance of 50m outside the periphery of the are cleared.
OD4698/2025-2026:Engaging man mazdoor for various works to execute the work as per the directions of departmental officers at site.
OD4700/2025-2026:Engaging hydraulic excavator including all cost of hire charge, driver, fuel and lubricants for removing debris, weeds and other major obstructions from canal bed prior to water distribution and including disposal of waste materials by mechanical means atleast 1m away from the side wall or as directed by Engineer-in-charge.
jollyjoseph (BID ID -2244172)
M KAJHA HUSSAIN (BID ID -2241917)
Sreekumar C K (BID ID -2240667)
GOPALAN.M (BID ID -2244010)
Bidder Name
jollyjoseph
Sreekumar C K
VISHNUDAS V
M KAJHA HUSSAIN
GOPALAN.M
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1263058.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .