| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 LAccepted-AOC SONARDIH DHANBAD 828125 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828125 | ₹1.4 L | 1 | Accepted-AOC Techno-commercially accepted L1. |
| 2 | 0₹1.4 LRejected-Finance CINEMA ROAD RANI BAZAR MORE DHANBAD DHANBAD 828113 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828113 | ₹1.4 L | 0 | Rejected-Finance Not L1. |
| 3 | 0₹1.4 LRejected-Finance DHANBAD NIMTALLA SONARDIH DHANBAD 828125 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828125 | ₹1.4 L | 0 | Rejected-Finance Not L1. |
| Sl No | Description | Qty | Unit | STAR AUTO ELECTRICAL WORKS L2 | Maa Gayatri Traders L3 | DUDHESHWAR ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00Repairing of Ceiling Glass & Glass Guard with Mounting :- 1. Damaged ceiling glass core denting, aligning and welding. 2. Damaged glass guard cutting, straightening and welding. 3. Damaged glass guard mountings cutting, denting, setting and welding. 4. New glass fitting with rubber bit and 02 sets glass clamp. | ||||||
| 2.00Materials and manpower required for Repairing of Ceiling Glass & Glass Guard with Mounting :- | ||||||
| 2.01 | Industrial gas | 1 | Set | 2,250 ₹2,250 | 2,290 ₹2,290 | 2,200 ₹2,200 |
| 2.02 | Electrode E-104 | 10 | Kg | 650 ₹6,500 | 650 ₹6,500 | 650 ₹6,500 |
| 2.03 | Ceiling glass size | 6 | Sq. ft. | 280 ₹1,680 | 280 ₹1,680 | 280 ₹1,680 |
| 2.04 | Glass rubber fitting | 10 | Sq. ft. | 89 ₹890 | 89 ₹890 | 89 ₹890 |
| 2.05 | Glass clamp fitting | 2 | Set | 200 ₹400 | 200 ₹400 | 200 ₹400 |
| 2.06 | Fitter (for glass fitting) | 1 | Shift | 783 ₹783 | 783 ₹783 | 783 ₹783 |
| 2.07 | Fitter helper (for glass fitting) | 1 | Shift | 655 ₹655 | 655 ₹655 | 655 ₹655 |
| 2.08 | Welder | 3 | Shift | 783 ₹2,349 | 783 ₹2,349 | 783 ₹2,349 |
Tender Value
₹1.4 L
EMD Value
₹1,736
Closing Date
30 Dec 2025, 11:00 amClosed
Area Manager (Excavation)
Office of The General Manager, Govindpur Area-III, Post - Sonardih, DHANBAD-828125 (Jharkhand)
Please Refer ANNEXURE B in Tender Document
2025_BCCL_349635_1
BCCL/GA-III/EXC/E TENDER/25-26/89 DATE-18.12.2025
Open Tender
Excavation Department Work
15 days
BLOCK_IV OCP, GOVINDPUR AREA-3, BCCL DHANBAD
Please refer Tender document
2 documents required · 2 mandatory
₹1,736
23 Mar 2026
18 Dec 2025
31 Dec 2025
18 Dec 2025
30 Dec 2025
19 Dec 2025
19 Dec 2025 - 23 Dec 2025
Repairing of Ceiling Glass & Glass Guard with Mounting :- 1. Damaged ceiling glass core denting, aligning and welding. 2. Damaged glass guard cutting, straightening and welding. 3. Damaged glass guard mountings cutting, denting, setting and welding. 4. New glass fitting with rubber bit and 02 sets glass clamp.
Materials and manpower required for Repairing of Ceiling Glass & Glass Guard with Mounting :-
Industrial gas
Electrode E-104
Ceiling glass size
Glass rubber fitting
Glass clamp fitting
Fitter (for glass fitting)
Fitter helper (for glass fitting)
Welder
Welder helper
Blacksmith
Profit
Repairing of Silencer Assembly :- 1. Both side silencer cover cutting, new making and welding. 2. Silencer box damage portion cutting, denting, sheet changing and welding. 3. Silencer inner jali cutting, cleaning, repairing and welding. 4. Silencer outlet and inlet pipe new making and welding. 5. Clamp (flange) new making – 04 nos.
Materials and manpower required for repairing of Silencer assembly :-
Industrial gas
Electrode Eknoweld
Outlet and inlet pipe new making with material and welding
Clamp (flange) new making with material and welding
Welder
Helper
Blacksmith
Profit
Repairing of Dust Hood Assembly :- 1. Assembly dust hood curtain mounting frame repairing by cutting, straightening, welding, and 29 nos. hole drilling, tapping and new nut bolt fitting.
Materials and manpower required for Repairing of assembly dust hood :-
Industrial gas
Electrode E-104
Hole drilling and tapping
Nut bolt with washer new fitting
Welder
Helper
Blacksmith
Profit
Repairing of Wet Drilling System :- 1. Dust hood water sprinkler frame new making as per required size. 2. 04 nos. New nozzle making and fitting. 3. 02 nos. drilling and tapping in steel pipe air system. 4. 02 nos. adopter new making and fitting. 5. 04 nos. drilling and tapping in bottom of centralizer bushing frame. 6. 04 nos. stud new making, threading and fitting. 7. Hose modification 04 nos. hose end cutting and 02 nos. welding.
Materials and manpower required for repairing of wet drilling system :-
Industrial gas for old frame cutting and plate cutting for new frame
Electrode E-104 for new frame welding
Hole drilling for nozzle fitting
New nozzle making with material
Drilling and tapping in steel pipe air system
Adopter new making with material
Stud new making with material
Hose end cutting, welding and grinding as per size
Welder
Helper
General Assistant
Profit
Repairing of Propeller Shaft Assembly Including male, female part & new U.J. Cross fitting in PTO :- 1. Undercutting of worn-out spline portion both sides. 2. Weld depositing in worn-out splines. 3. Machining of welded portion as per size. 4. Splines cutting by milling machine both sides – 38 nos. 5. Splines polishing – 38 nos.
Materials and manpower required for repairing of Propeller Shaft Assembly Including male, female part & new U.J. Cross fitting in PTO :-
Welding electrode L & T CGS 680
Hire Lathe machine for machining
Hire Milling machine for splines cutting
Machinist
Helper
Hire Welding machine
Welder for weld depositing
Helper for weld depositing
U.J. Cross assembly
Splines polishing
Special tools, tackles & consumable items
Profit
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_362384.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid