Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹7.6 L
EMD Value
₹15,171
Closing Date
8 Dec 2026, 5:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer,Teesta Irrigation Division,
Executive Engineer,Teesta Irrigation Division,
Maintenance repair in between 26.800km and 30.312km of TJMC to ensuing Boro Irrigation ,in Block and PS-Kranti and Maynaguri, Dist Jalpaiguri during the year 2026-27
2026_IWD_5081773_5
WBIW/EE/TID/e-NIT-5/2026-27
Open Tender
CIVIL WORKS
Percentage
30 days
MAYNAGURI
Please refer Tender documents.
5 documents required · 5 mandatory
₹15,171
Yes
2 Nov 2026
2 Nov 2026
9 Dec 2026
2 Nov 2026
8 Dec 2026
2 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 50,046 | sqm | 2.38 | ₹1,19,109.48 |
| 2 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.
(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. | 364.85 | cum | 129.91 | ₹47,397.66 |
| 3 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of (B ) Beyond 1.00 km and upto 2.00 km. NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. | 243.23 | cum | 341.21 | ₹82,992.51 |
| 4 | Dismantling all types of plain cement concrete works, stacking service able materials at site and
removing rubbish as directed within a lead of 75 m.
In ground floor including roof
(a) upto 150 mm. thick | 3.14 | cum | 1,119.1 | ₹3,513.97 |
| 5 | “Cast-in-situ cement concrete blocks or lining units as per designed section and specification,inominal mix proportion 1:1.5:3 (corresponding to M20 Grade) with well graded 20mm down stone metal aggregate, laid in position by casting in alternative panels or otherwise to keep a gap of 12mm between the adjacent units, over a layer of polythene sheet of thickness not less than 100 µm to act as a separator between the bottom surface of the block and the sand cushion/filter material laid below the blocks, including dressing, ramming, shuttering, finishing the exposed surface by trowel without adding any additional cement and sand mortar, curing and filling the gaps between the adjacent units by 5.6mm down coarse aggregate to be compacted properly, with all leads and lifts including supply and carriage of all materials, complete, without the cost of sand cushion/filter.
(The rate is exclusive of the cost of stone aggregate and its carriage upto site. Construction wing has to add the cost of same from the SoR of PW (Roads) to derive the consolidated rate. Consumption chart of the USoR may be used for assessing the quantity of coarse aggregates per cum of concrete).
With Stone Aggregate (Pakur, North Bengal or Rajmahal varieties) | 8.19 | cum | 6,762.36 | ₹55,383.73 |
| 6 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). | 651.2 | meter | 34.56 | ₹22,505.47 |
| 7 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.(a) Where boats are not necessary. | 325.6 | meter | 13.11 | ₹4,268.62 |
| 8 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) | 352 | meter | 26.22 | ₹9,229.44 |
| 9 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete .(capacity 50 kg) | 21,717 | each | 7.15 | ₹1,55,276.55 |
| 10 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).
NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. | 21,717 | each | 8.34 | ₹1,81,119.78 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.79 MB
2911.pdf
Tender Documents • 1.20 MB
barchart.pdf
Tender Documents • 0.57 MB
BOQ_5195496.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .