Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | ₹5.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.5 L+₹15,873.43 (2.97%)Rejected-Finance | ₹5.5 L+₹15,873.43 (2.97%) | L2 | Rejected-Finance second lowest |
| 3 | L3₹5.6 L+₹23,766.88 (4.44%)Rejected-Finance | ₹5.6 L+₹23,766.88 (4.44%) | L3 | Rejected-Finance third lowest |
| Sl No | Description | Qty | Unit | K VELAYUDHAN KUTTY NAIR L1 | BEERANMOIDHEEN VP L2 | JAYARAJAN L3 |
|---|---|---|---|---|---|---|
| 1.00Toilet block construction | ||||||
| 1.00 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 12.25 | cum | - | - | - |
| 1.00 | 60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 12.25 | cum | - | - | - |
| 1.00 | 7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 7.05 | cum | - | - | - |
| 1.00 | 50.6.7.2 : Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 18.1 | cum | - | - | - |
| 1.00 | 5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | 6.25 | cum | - | - | - |
| 1.01 | 5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 10.95 | sqm | - | - | - |
| 1.01 | 5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 49.48 | sqm | - | - | - |
| 1.01 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 468.68 | kilogram | - | - | - |
| 1.01 | 13.16.1 : 6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 42.16 | sqm | - | - | - |
Tender Value
₹6 L
EMD Value
₹15,000
Closing Date
13 Aug 2018, 5:00 pmClosed
ASSISTANT ENGINEER
OFFICE OF THE ASSISTANT ENGINEER,LSGD SECTION,VELIMUKKU,MOONNIYUR GRAMA PANCHAYATH
AMUPS KUNNATHPARAMBU SCHOOL TOILET CONSTRUCTION (201/19)
2018_LSGD_225977_2
01/2018-19/AE/LSGD/MNR
Open Tender
Civil Works - Buildings
Item Wise
210 days
KUNNATHPARAMBU
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,344
Yes
online
₹15,000
Yes
26 Jun 2026
6 Aug 2018
18 Aug 2018
6 Aug 2018
13 Aug 2018
6 Aug 2018
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_299250.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .