| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAccepted-AOC 7 44 LONI ROAD SITE II INDUSTRIAL AREA MOHAN NAGAR GHAZIABAD U P | GHAZIABAD | UTTAR PRADESH | ₹18.7 L | L1 | Accepted-AOC AOC |
| 2 | L2₹21.1 LRejected-Finance S 3 17 GREATER GREEN PARK BISALPUR ROAD BAREILLY | BAREILLY | BAREILLY | UTTAR PRADESH | ₹21.1 L | L2 | Rejected-Finance NON RESPONSIVE |
Tender Value
₹22 L
EMD Value
₹2.2 L
Closing Date
23 Feb 2026, 12:00 pmClosed
EXECUTIVE ENGINEER PD PWD AMROHA
EXECUTIVE ENGINEER PD PWD AMROHA
Repair of Nahar Bridge in Km 2 of Khawri to Rasoolpur Bhanwar Ahatmali road in District Amroha
2026_CEMBD_1117164_1
349/E.TENDER/2025-26 Dated 16-02-2026
Open Tender
Civil Works - Roads
60 days
EXECUTIVE ENGINEER PD PWD AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹2.2 L
Yes
11 Mar 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
Providing and placing high strength, free flow micro concretewith compressive strength of 65N/Sqmm of pre-pecked as per specification and replaced 20% by weight with well graded, clean crushed aggregate 10mm down (aggregate should be less than 10mm but retain on 3.36mm) for repairing excessively dimaged area of structural elements excluding reinforcement but excluding scaffolding, centering, fixing watertight formwork, shuttering curing inclusive of all labour,materials,equipment etc. complete for as per specification and instruction of engineering charge including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Eproxy bonding of new concrete to old concrete including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1 including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical Specification including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical Specification including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Erection of Abutments, M. S. Pipe scaffolding and Platform for repair of piers and pier caps & removal of same after Repairs. Item Includes Materials, Layers, Consumables for all land and lifts. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.11 MB
Tendernotice_2.pdf
PDF • 1.69 MB
BOQ_2075535.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid