Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Finance | ₹5.6 L | L1 | Admitted-Finance |
| 2 | L2₹6.1 LAdmitted-Finance 141 KAMAT CHANGRABANDHA P O CHANGRABANDHA P S MEKHLIGANJ DIST COOCH BEHAR PIN 735301 | MEKHLIGANJ | COOCH BEHAR | WEST BENGAL | 735301 | ₹6.1 L | L2 | Admitted-Finance |
| 3 | L3₹7.7 LAdmitted-Finance | ₹7.7 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical NAZRUL SARANI ASHRAM PARA SILIGURI 734001 | SILIGURI | JALPAIGURI | WEST BENGAL | 734001 | - | - | Rejected-Technical Technically Rejected |
| Sl No | Description | Qty | Unit | EYACIN ALI L1 | M/S DEBASISH GHOSH L3 | MADAN MOHAN SARKAR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Watch and ward duty including weeding, clearing shrubs, forking, mulching and watering | 1,560 | Day | 330 ₹5,14,800 Lowest | 451.94 ₹7,05,026.4 | 350 ₹5,46,000 |
| 2.00 | Preparation of beds for hedging and shrubbery by excavating
60cm deep and trenching the excavated | 250 | SQM | 100 ₹25,000 | 76 ₹19,000 Lowest | 110 ₹27,500 |
| 3.00 | Supply of fuel (petrol) for Honda lawn mower for trimming
of lawn etc | 100 | LTR | 114 ₹11,400 Lowest | 115 ₹11,500 | 140 ₹14,000 |
| 4.00 | PLANTING OF TREES ( AVENUE PLANTS) IN 0.60M DIA HOLE, 1M DEEP DUG IN THE GROUND, MIXING THE SOIL WITH DECAYED FARM YARD/SLUDGE MANURE. THIS INCLUDES SUPPLY OF LABOUR, TOOLS & PLANTS INCLUDING MATERIALS BUT EXCLUDING COST OF TREE. Plants including materials but excluding cost of tree | 50 | Nos | 20 ₹1,000 Lowest | 59.32 ₹2,966 | 20 ₹1,000 Lowest |
| 5.00 | SUPPLYING AND STACKING OF GOOD EARTH (ADEQUATE FOR HORTICULTURE WORK) AT SITE INCLUDING ROYALTY (EARTH MEASURED IN STACK WILL BE REDUCED BY 20% FOR PAYMENT)Earth measured in stack will be reduced by 20% for payment | 25 | Cum | 50 ₹1,250 Lowest | 300 ₹7,500 | 500 ₹12,500 |
| 6.00 | SUPPLYING AND STACKING SLUDGE (ADEQUATE FOR
HORTICULTURE WORK) AT SITE IN DRY CAKE FORM FROM
APPROVED DISPOSAL WORK SITE INCLUDING ROYALTY, ALL
LEAD AND LIFT ETC. (SLUDGE MEASURED IN STACK WILL BE
REDUCED BY 8%). Sludge measured in stack will be reduced by 8% | 25 | Cum | 30 ₹750 Lowest | 590 ₹14,750 | 30 ₹750 Lowest |
| 7.00 | SPREADING OF SLUDGE, DUMP MANURE,/FARM YARD
MANURE/ANIMEL DUNG MANURE AND GOOD EARTH IN
REQUIRED THICKNESS. THIS INCLUDES SUPPLY OF LABOUR,
TOOLS & PLANTS EXCLUDING MATERIALS. Includes supply of
labour, tools & plants excluding materials. | 5,150 | Sqm | 1 ₹5,150 Lowest | 2.65 ₹13,647.5 | 1 ₹5,150 Lowest |
Tender Value
₹7.7 L
EMD Value
₹15,350
Closing Date
20 Jul 2026, 5:00 pmClosed
SVP Commercial
Webel Bhavan Salt Lake Sec V EP GP Block KOL 91
Annual Maintenance of Landscaping within the premises of Siliguri IT Park PH-I and II
2026_WEBEL_1032158_1
WEBEL/ EOT/W/25-26/000136 (RE-TENDER 2nd Call) Dated 03/07/26
Open Tender
Miscellaneous Services
Item Rate
365 days
Siliguri IT Park Phase I and II
Please refer to the tender documents
6 documents required · 6 mandatory
₹500
₹15,350
Yes
6 Aug 2026
13 Jul 2026
22 Jul 2026
13 Jul 2026
20 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Watch and ward duty including weeding, clearing shrubs, forking, mulching and watering | - | Day | - | - |
| 2 | Preparation of beds for hedging and shrubbery by excavating
60cm deep and trenching the excavated | - | SQM | - | - |
| 3 | Supply of fuel (petrol) for Honda lawn mower for trimming
of lawn etc | - | LTR | - | - |
| 4 | PLANTING OF TREES ( AVENUE PLANTS) IN 0.60M DIA HOLE, 1M DEEP DUG IN THE GROUND, MIXING THE SOIL WITH DECAYED FARM YARD/SLUDGE MANURE. THIS INCLUDES SUPPLY OF LABOUR, TOOLS & PLANTS INCLUDING MATERIALS BUT EXCLUDING COST OF TREE. Plants including materials but excluding cost of tree | - | Nos | - | - |
| 5 | SUPPLYING AND STACKING OF GOOD EARTH (ADEQUATE FOR HORTICULTURE WORK) AT SITE INCLUDING ROYALTY (EARTH MEASURED IN STACK WILL BE REDUCED BY 20% FOR PAYMENT)Earth measured in stack will be reduced by 20% for payment | - | Cum | - | - |
| 6 | SUPPLYING AND STACKING SLUDGE (ADEQUATE FOR
HORTICULTURE WORK) AT SITE IN DRY CAKE FORM FROM
APPROVED DISPOSAL WORK SITE INCLUDING ROYALTY, ALL
LEAD AND LIFT ETC. (SLUDGE MEASURED IN STACK WILL BE
REDUCED BY 8%). Sludge measured in stack will be reduced by 8% | - | Cum | - | - |
| 7 | SPREADING OF SLUDGE, DUMP MANURE,/FARM YARD
MANURE/ANIMEL DUNG MANURE AND GOOD EARTH IN
REQUIRED THICKNESS. THIS INCLUDES SUPPLY OF LABOUR,
TOOLS & PLANTS EXCLUDING MATERIALS. Includes supply of
labour, tools & plants excluding materials. | - | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_2534596.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].