Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.5 LAccepted-Finance B BLOCK 21 SHILPI PLAZA REWA DISTT REWA MADHYA PRADESH | REWA | MADHYA PRADESH | 486001 | ₹6.5 L | 1 | Accepted-Finance L1 |
| 2 | 2₹6.5 L+₹3,297.96 (0.51%)Rejected-Finance | ₹6.5 L+₹3,297.96 (0.51%) | 2 | Rejected-Finance L2 |
| 3 | 3₹6.5 L+₹5,804.42 (0.90%)Rejected-Finance | ₹6.5 L+₹5,804.42 (0.90%) | 3 | Rejected-Finance L3 |
Tender Value
₹6.6 L
EMD Value
₹13,195
Closing Date
7 Aug 2026, 5:00 pmClosed
Executive Officer
Nagar Palika Parishad Rampur
Construction of RCC Nala from main road to anmol hotel and LIC tiraha Moh radha road ward no-2 Rampur
2026_DOLBU_1171459_5
687/NPP/ET/RAMPUR/2026
Open Tender
Civil Works
Percentage
90 days
Rampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
Eo
₹13,195
1 Sept 2026
27 Jul 2026
8 Aug 2026
27 Jul 2026
7 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | De-watering bt disesl pumping set of 5 H.P Capicity during the construction of bridge,culvert nala,etc i/c hite-charge of pumping set and its pol,labour all T7P rtc complete in all respect. | 45 | Hours | 165 | ₹7,425 |
| 2 | Dismentling of brick work or stone work in lime or cement mortar and i/c staking or material as directed by the engineer-in-charge with ina distance of 60 meter (200 feet) | 26.22 | Cum | 620 | ₹16,256.4 |
| 3 | Deduction of old and workable brick 40% of item no-2 | 4,824.48 | Nos | 5.8 | ₹27,981.98 |
| 4 | Deduction of brick bats for 60% 0f item no-01 | 15.73 | Cum | 1,050 | ₹16,516.5 |
| 5 | M-150 brick work in One part cement and Six part Fine sand in superstructure including supply of all materials, labour & T&P required for proper completion of work as per SI.No. 303 & 310. | 20.1 | Cum | 5,280 | ₹1,06,128 |
| 6 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in R.C.C T-beam,slab roof columns and wall i/c supply of all material,labour and T&P etc.including supply of all material,labour and T&P etc.required for proper completion of work | 42.75 | Cum | 8,295 | ₹3,54,611.25 |
| 7 | Mild steel or iron in plain work such as concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work. As per S.I. No. 504 of Ch. 10. | 30.2 | Qtl | 7,105 | ₹2,14,571 |
| 8 | Providing and Fixing of Display Board i/c Writing and inculding supply of all materials labour and T&P etc for proper completion of work. | 1 | Nos | 5,100 | ₹5,100 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.98 MB
BOQ_2199310.xls
BOQ • 0.38 MB
5.pdf
Tender Documents • 1.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .