| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | LI₹4.4 LAccepted-AOC | LI | Accepted-AOC Lowest | |
| 2 | L2₹4.5 LRejected-AOC | L2 | Rejected-AOC Highest rate hence rejected |
Tender Value
₹4.5 L
EMD Value
₹11,165
Closing Date
9 May 2023, 5:00 pmClosed
Seeja KR
O/o Assistant Executive Engineer Electrical Wing (I) Sub division, Aluva
Fully Comprehensive Annual Maintenance of LIS Mekkad Desom West, Chakkothumala LI Schems under Electrical L I section Aluva
2023_Irrig_554000_13
PWD/BLDG/TR/10885/2022
Open Tender
Electrical Works
Item Rate
365 days
Aluva
Please refer Tender documents.
11 documents required · 11 mandatory
₹985
₹11,165
23 Jun 2023
17 Apr 2023
11 May 2023
17 Apr 2023
9 May 2023
17 Apr 2023
17 Apr 2023 - 8 May 2023
Amount
Overhauling
OD71620/2022-2023:Dismantling the 3 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD71621/2022-2023:Dismantling the 30 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD71622/2022-2023:Dismantling the 60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
Lowering / Refitting
OD71610/2022-2023: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD71627/2022-2023:Lowering down and erecting 60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD71628/2022-2023:Lowering down and erecting 30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Accessories Supply and Other Items( SITC Should be completed with in 3 Months after executing the Agreement)
OD71612/2022-2023:Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
OD261339/2022-2023:Supply and renewal of Three Phase Ammeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
OD71613/2022-2023:Supply and renewal of Multifunction meter to read: V, A, F, 3 phase accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
OD71615/2022-2023: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD71616/2022-2023:Supply and Installing 20 W LED Tube light.
90.14.11.2:MCCB AccessoriesSupply and fixing one number earth fault Relay up to 125A to 200A with CBCT.
OD97976/2022-2023:Replacing the damaged bearing, supply and fixing new industrial type ball bearing 6319 2Z C3, SKF / FAG or equivalent, suitable for the existing motor / pump set as per the direction of Departmental staff at site.
OD127470/2022-2023: Carrying out control wiring for panel with normal meters and indication lamps for interconnecting the control devices/ equipments including providing suitable size insulated sockets at the termination points or soldered properly, providing numbering ferrules for the proper identification of the wiring, keeping the wiring firm by suitable tie/ tie mounts/ PVC duct etc as required.-1.50 sq mm single run with required sockets.
2.10.1:Supplying and fixing 5 amps to 32 amps rating, 240/415 volts, "C" curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required.Single pole
2.1.4:Providing and fixing following capacity TP&N disconnector fuse switch unit inside the existing panel board with ISI marked HRC fuses including drilling holes in cubicle panel, making connections, etc. as required.125 Amp TP & N
OD127473/2022-2023:Supply , Conveyance and fitting 200A/250, HRC Fuse Base suitable for HRC Fuse link in the existing Meter box.
OD261418/2022-2023:Supply installation and commissioning of 200 A DIN Type HRC Fuse Link
OD127475/2022-2023:CURRENT TRANSFORMER -250/5 A, 5 VA, accuracy class 0.5, Resin Cast Metering CT
OD127476/2022-2023:Supply , Conveyance and fitting 250 A, 2 Way neutral links in the existing Meter box.
90.14.2.2:Supply and providing 3mm SMC sheet as shrouding for bus interconnection / terminations etc. including required nut & bolt etc.
90.14.3.1:Supply and providing heavy duty 'A' section neoprene gasket in the panel boardA' section neoprene beeding suitable for 1.60/ 2.00 mm sheet
90.14.5:Supply and fabrication conveyance and installation of angle iron frame work for wall mounting panel board
90.14.1.2:Fabrication, supply, conveyance, installation testing and commissioning of floor or wall mounting, dust and vermin proof, cubicle type MV panel board comprising of the following components/ devices & complying to IS 8623. Fabrication of fully partitioned, dust and vermin proof enclosure for panel assembly as per form 4 of IS 8623 (with latest amendments) using CRCA sheet as per approved design and requirement, with front and rear access facility, bus bar chambers, hinged doors for all switch gear compartments, earthing the doors using 4 sq mm braided copper conductor, providing necessary cut-outs for mounting meters, relays, indication lamps, bus bar interconnection etc, detachable covers for bus bar chamber and cable alley, powder coating the assembly after subjecting to 7 tank process etc as required. CRCA sheet alone be used for the fabrication. Angles/ flats/ slotted angles etc shall not be used for the fabrication of panel assembly. The measurments will be taken the area of the complete sheets used for panel board including partitions, folding, shrouding etc.Supply and fabrication of MV panel board using 1.6mm CRCA sheet, powder coated (excluding base frame)
OD127800/2022-2023:Charges for scraping , cleaning , painting the existing rusted panel board and dismantling the burnt out wire connection of switches, meters ,cleaning the terminals , attending all minor repairs, painting two coats of enamel paint over a coat of red oxide primmer and making the panel board ( including the naming of separate switches marking ) in good working condition
OD127805/2022-2023:supply and fitting of Fully-automatic Star Delta Starter. Starters for 60 HP motor
90.14.28.8:S & F Motor starters of the following ratingsFully automatic star delta starter for 30 to 35HP motor
Periodical Maintenance
OD114811/2022-2023:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintaince of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding)all time during the period of contract and the faults should be rectified with in the time allowed
OD114812/2022-2023:Fully Comprehensive Annual Maintenance of 30 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD114813/2022-2023:Fully Comprehensive Annual Maintenance of 60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Lifting
OD71599/2022-2023: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD71635/2022-2023:Lifting the 30HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD71636/2022-2023:Lifting the 60HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
Overhauling
OD71608/2022-2023:Dismantling the 5 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD71638/2022-2023:Dismantling the 80 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
Lowering / Refitting
OD71609/2022-2023: Lowering down and erecting 5 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD71654/2022-2023:Lowering down and erecting 80 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Accessories Supply and Other Items( SITC Should be completed with in 3 Months after executing the Agreement)
OD71602/2022-2023:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
OD71603/2022-2023: Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
OD71604/2022-2023:Supply and Installing 20 W LED Tube light.
14.10:Providing and laying in position reinforced cement concrete 1 :2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) in foundation of pump, DG set etc. including form work etc. as required (excluding reinforcement).
Periodical Maintenance
OD71597/2022-2023:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump,maintaince of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding)all time during the period of contract and the faults should be rectified with in the time allowed
OD114816/2022-2023:Fully Comprehensive Annual Maintenance of 80HP squirrel cage induction motor with split case / End suction pump set, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs,replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and ( excluding motor rewinding ) and maintain the motor pump set, electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD136909/2022-2023: Fully Comprehensive Annual Maintenance of 80 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Lifting
OD71600/2022-2023: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD71661/2022-2023:Lifting the 80HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
Overhauling
OD97928/2022-2023:Dismantling the 5 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD97929/2022-2023:Dismantling the 60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
Lowering / Refitting
OD97934/2022-2023:Lowering down and erecting 60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD97935/2022-2023:Lowering down and erecting 5 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
Accessories Supply and Other Items( SITC Should be completed with in 3 Months after executing the Agreement)
OD97944/2022-2023:Supply and renewal of Three Phase Digital Voltmeter accuracy class 1 in panel board after dismantling the damaged one, L&T or Equivalent make.
OD136908/2022-2023:Supply and filling of transformer oil of good quality to the Transformer /starter/ regulator etc as required
OD136910/2022-2023:Supply and Installing 20 W LED Tube light.
OD136911/2022-2023:Supply and renewal of the LED Indication lamps in panel board after dismantling the damaged one
Periodical Maintenance
OD97947/2022-2023:Fully Comprehensive Annual Maintenance of 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintaince of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding)all time during the period of contract and the faults should be rectified with in the time allowed
OD97948/2022-2023: Fully Comprehensive Annual Maintenance of 60 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter and slip ring unit, replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD246733/2022-2023:Fully Comprehensive Annual Maintenance of 60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump and starter ( excluding motor rewinding ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
Lifting
OD97949/2022-2023:Lifting the 5HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD97950/2022-2023:Lifting the 60HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
SHIJU M.T
Bidder Name
SHIJU M.T
GK INDUSTRIES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_844211.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .