| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance PUNJAB | FATEHGARH SAHIB | PUNJAB | 140402 | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹50,441 (0.33%)Admitted-Finance | ₹1.5 Cr+₹50,441 (0.33%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 Cr+₹3.4 L (2.20%)Admitted-Finance 36 AJOULI MORH NAYA NANGAL NANGAL RUPNAGAR PUNJAB 140126 | RUPNAGAR | PUNJAB | 140126 | ₹1.6 Cr+₹3.4 L (2.20%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | THE SALAIMPUR CO-OP L/C SOCIETY LIMITED L1 | GARG ENTERPRISES L2 | Ram Singh Kanda and sons L3 |
|---|---|---|---|---|---|---|
| 1.00 | Assistance in coal bunkering (clause 2.01 of AA)
(One operation is equivalent to one man day worked for eight hours) | 4,380 | Operations | 1,255 ₹54,96,900 | 1,251 ₹54,79,380 Lowest | 1,277.39 ₹55,94,968.2 |
| 2.00 | Assistance in upkeep of SGP and GTG/HRSG (clause 2.02 of AA) and upkeep of both coal bunkering systems (clause 2.03 of AA)
(One operation is equivalent to one man day worked for eight hours) | 7,711 | Operations | 1,255 ₹96,77,305 | 1,251 ₹96,46,461 Lowest | 1,278.39 ₹98,57,665.29 |
| 3.00 | Shifting of mill rejects, stones removed from conveyors, ash below EP hoppers, chimney, spilled coal under junction towers, crusher house, gravity take up pulleys of conveyors including conveyor belts in tractor trolleys to the directed places inside/outside the premises of factory as per clause no 2.04 of Scope of work. | 1,500 | Trolley of 3M3 capacity | 95 ₹1,42,500 Lowest | 155 ₹2,32,500 | 139 ₹2,08,500 |
| 4.00 | Removal and disposal of sludge, silt, muck etc. from open surface drains, storm water drains within the battery limit of SGP, HRSG and MHP including Pipe trenches, slurry line trenches and ash settling pits as per clause no 2.05 of Scope of work. | 50 | Trolley of 3M3 capacity | 60 ₹3,000 | 60 ₹3,000 | 39 ₹1,950 Lowest |
| 5.00 | a) Shut down man days as per clause no. 2.06 a) of Scope of work
(One Shut down man day is equivalent to 36 man days) | 10 | Rate/shut mandays | 1,100 ₹11,000 | 1,150 ₹11,500 | 339 ₹3,390 Lowest |
| 6.00 | b) Supply of manpower during exigency
for smooth running of plant as per clause no 2.06 b) of Scope of work. | 200 | Rate/ Manday | 30 ₹6,000 Lowest | 70 ₹14,000 | 39 ₹7,800 |
| 7.00 | Complete external cleaning of Bank Tubes, Water wall Tubes, Super-heaters, Economizers, Air Pre Heaters, Pent Houses, Goose Necks, Wind Boxes, ESPs (old), ESP (new) as per clause no 3.0 of Scope of work. SGP Boiler
a) Without Scaffolding | 2 | Boiler | 1,100 ₹2,200 | 1,200 ₹2,400 | 939 ₹1,878 Lowest |
| 8.00 | Complete external cleaning of Bank Tubes, Water wall Tubes, Super-heaters, Economizers, Air Pre Heaters, Pent Houses, Goose Necks, Wind Boxes, ESPs (old), ESP (new) as per clause no 3.0 of Scope of work. SGP Boiler
a) With Scaffolding | 1 | Boiler | 1,095 ₹1,095 | 1,200 ₹1,200 | 939.51 ₹939.51 Lowest |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
4 Apr 2022, 2:30 pmClosed
RAKESH KUMAR
TECHNICAL BUILDING, NFL BATHINDA
Upkeep of Steam Generation and Material Handling Plant contract for the year 2022 23
2022_NFL_106944_1
NFB/PROD/SGandPP/207-B/2022-23
Limited
Manpower Supply
Supply
365 days
NFL BATHINDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
Payable To NFL
₹1 L
Yes
6 May 2022
15 Mar 2022
5 Apr 2022
15 Mar 2022
4 Apr 2022
15 Mar 2022
Amount
Assistance in coal bunkering (clause 2.01 of AA) (One operation is equivalent to one man day worked for eight hours)
Assistance in upkeep of SGP and GTG/HRSG (clause 2.02 of AA) and upkeep of both coal bunkering systems (clause 2.03 of AA) (One operation is equivalent to one man day worked for eight hours)
Shifting of mill rejects, stones removed from conveyors, ash below EP hoppers, chimney, spilled coal under junction towers, crusher house, gravity take up pulleys of conveyors including conveyor belts in tractor trolleys to the directed places inside/outside the premises of factory as per clause no 2.04 of Scope of work.
Removal and disposal of sludge, silt, muck etc. from open surface drains, storm water drains within the battery limit of SGP, HRSG and MHP including Pipe trenches, slurry line trenches and ash settling pits as per clause no 2.05 of Scope of work.
a) Shut down man days as per clause no. 2.06 a) of Scope of work (One Shut down man day is equivalent to 36 man days)
b) Supply of manpower during exigency for smooth running of plant as per clause no 2.06 b) of Scope of work.
Complete external cleaning of Bank Tubes, Water wall Tubes, Super-heaters, Economizers, Air Pre Heaters, Pent Houses, Goose Necks, Wind Boxes, ESPs (old), ESP (new) as per clause no 3.0 of Scope of work. SGP Boiler a) Without Scaffolding
Complete external cleaning of Bank Tubes, Water wall Tubes, Super-heaters, Economizers, Air Pre Heaters, Pent Houses, Goose Necks, Wind Boxes, ESPs (old), ESP (new) as per clause no 3.0 of Scope of work. SGP Boiler a) With Scaffolding
GARG ENTERPRISES
Ram Singh Kanda and sons
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .