| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC VILL ADISAPTAGRAM PO MOGRA | ₹2.2 Cr Quoted ₹2.4 Cr | L1 | Accepted-AOC As L1 bidder. |
| 2 | L2₹2.5 Cr+₹10.7 L (4.50%)Rejected-AOC | ₹2.5 Cr+₹10.7 L (4.50%) | L2 | Rejected-AOC As L2 bidder. |
| 3 | L3₹2.6 Cr+₹25.3 L (10.7%)Rejected-AOC | ₹2.6 Cr+₹25.3 L (10.7%) | L3 | Rejected-AOC As L3 bidder. |
Tender Value
₹2.2 Cr
EMD Value
₹3.6 L
Closing Date
16 Jul 2020, 12:00 pmClosed
GM, BTPS
Administrative Building, Bandel Thermal Power Station, Tribeni, Dist Hooghly Pin712503
Sweeping and Cleaning of all buildings except Power House, ECR, ESP and CHP Building under Civil (IPH) at BTPS.
2020_WBPDC_287097_1
WBPDCL/BTPS/NIT/E1698/20-21
Open Tender
Support/Maintenance Service
Item Rate
730 days
Bandel Thermal Power Station
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹3.6 L
Administrative Building, Bandel Thermal Power Stn.
17 Nov 2020
25 Jun 2020
18 Jul 2020
25 Jun 2020
16 Jul 2020
4 Jul 2020
2 Jul 2020
Amount
Sweeping & Cleaning of all buildings except Power House, ECR, ESP & CHP Building under Civil (IPH) at BTPS.
Engagement of unskilled labour (23 heads for 24 months) for different sweeping and cleaning jobs at various locations of all offices, toilets, roof & stairs of BTPS. Details of work as mentioned in Scope of work as per direction of EIC. Category I. Note: - i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs.75. 37 per day for each labour. ii) Mandays means physical attendance & CL if any. iii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including supply/ hire charges of necessary tools & tackles.
Provision of overtime for emergency works against labourers. (23 heads for 24 months). Category I.
Cost of listed holiday including PF & Bonus. (Max. 14 days/year/head) Note: Engaging of labourers on Holiday is depended on the requirement of service which is to be decided by E. I. C. on need basis. Category I.
House rent allowance for 23 nos worker. This allowance @20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month. Category I.
Welfare allowance for 23 nos worker. (23 heads for 24 months) This allowance @ 400/ per month shall be paid to these workers subject to minimum 06 days work per month by the worker. Payment will be made accordingly by per head per month. Category I.
Statutory component (i. e ESI, PF & Bonus) for 23 Nos. workers. Category I.
Engagement of unskilled labour (01 No Listed) for the work as mentioned in scope of work as per direction of the EIC. Category II. Note: - i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs.75. 37 per day for each labour. ii) Mandays means physical attendance & CL if any. iii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including supply/ hire charges of necessary tools & tackles.
Provision of overtime for emergency works against labourers. Category II
Cost of listed holiday including PF & Bonus. (Max. 14 days /year/head) Note: Engaging of labourer on Holiday is depended on the requirement of service which is to be decided by E. I. C. on need basis. Category II.
House rent allowance for 01 nos worker. This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month. Category II.
Welfare allowance for 01 nos worker. This allowance @ 400/ per month shall be paid to these workers subject to minimum 06 days work per month by the worker. Payment will be made accordingly by per head per month. Category II.
Statutory component (i. e ESI, PF & Bonus) for 02 Nos. workers. Category II.
Engagement of unskilled labour (01 No Listed) for the work as mentioned in scope of work as per direction of EIC. Category III. Note :- i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs.75. 37 per day for each labour. ii) Mandays means physical attendance & CL if any. iii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including supply/ hire charges of necessary tools & tackles.
Provision of overtime for emergency works against labourer. Category III
SCost of listed holiday including PF & Bonus. (Max. 14 days /year/ head) Note: Engaging of labourer on Holiday is depended on the requirement of service which is to be decided by E. I. C. on need basis. Category III.
House rent allowance for 01 nos worker. This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month. Category III.
Welfare allowance for 01 nos worker. This allowance @ 400/ per month shall be paid to these workers subject to minimum 06 days work per month by the worker. Payment will be made accordingly by per head per month. Category III.
Statutory component (i. e., ESI, PF & BONUS) for 01 No. worker. Category III.
Engagement of unskilled labour (01 No. Listed) for the work as mentioned in scope of work as per direction of the EIC. Category IV. Note :- i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs.75.37 per day for each labour. ii) Mandays means physical attendance & CL if any. iii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including supply/ hire charges of necessary tools & tackles
Provision of overtime for emergency works against labourers. Category IV.
Cost of listed holiday including PF & Bonus. (Max. 14 days/ year/ head) Note: Engaging of labourers on Holiday is depended on the requirement of service which is to be decided by E. I. C. on need basis. Category IV.
House rent allowance for 01 nos worker. This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month. Category IV.
Statutory components (i. e ESI, PF & Bonus) for 01 no workers. Category-IV.
Engagement of unskilled labour (04 Nos. Non-Listed) for the work as mentioned in scope of work as per direction of the EIC. Category V. Note :- i) Mandays means physical attendance & CL if any & Holiday if any. ii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including supply/ hire charges of necessary tools & tackles.
Provision of overtime for emergency works against labourers. Category-V.
Cost of listed holiday including PF & Bonus. (Max. 07 days/year/head). Note- Engaging of labourers on Holiday is depended on the requirement of service which is to be decided by EIC. on need basis. Category-V.
House rent allowance for 04 nos workers. This allowance @ 19% of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly (per month per workman). Category V.
Statutory components (i. e. ESI, PF, Bonus) for 04 nos workers. Category V.
Engagement of unskilled labour (02 Nos. No-Category Ladies) for the work as mentioned in scope of work as per direction of the EIC. Category VI. Note :- i) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including supply/ hire charges of necessary tools & tackles.
House rent allowance for 02 nos worker. This allowance @ 5% of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month. Category VI.
Statutory components (i. e. ESI, PF, Bonus) for 02 nos workers. Category VI.
Welfare allowance for 01 nos worker. This allowance @ 400/ per month shall be paid to these workers subject to minimum 06 days work per month by the worker. Payment will be made accordingly by per head per month. Category IV.
Provision of EL for 04 nos workers. Category V.
Annual Cost of PPE (on reimbursement basis at actual) for 26 workers. (All Categories except Category V & VI) For each worker; soap (06 nos per month), Duster (04nos per year), Helmet (01 no per 02 year), Safety shoe (BATA make, Model-ENDURA L/C, Model No. 825-6051) (01 No/2 years), Gumboot (01 pair per year), Hand gloves (01 pair per month) , Nose guard (02 nos per month) to be supplied in consultation with Fire & Safety Deptt., HR & A Deptt., and Utilizer Deptt., BTPS.
Annual Cost of PPE (on reimbursement basis at actual) for 04 (Non-Listed) workers. (For Categories -V)For each worker; Helmet (01 no per 02 year), Safety shoe (BATA make, Model-ENDURA L/C, Model No. 825-6051) ( 01 No/2 years), Gumboot (01 pair per year), Hand gloves (01 pair per month), Nose guard (02 nos per month) to be supplied in consultation with Fire & Safety Deptt., HR & A Deptt., and Utilizer Deptt., BTPS.
Annual Cost of PPE (on reimbursement basis at actual) for 02 (NO-Category) workers. (Category VI) For each worker; Helmet(01 no per 02 year), Safety shoe (BATA make, Model-ENDURA L/C, Model No. 825-6051) (01 No/2 years), Gumboot (01no. per 02 year), Hand gloves (01 pair per month) , Nose guard (02 nos per month) to be supplied in consultation with Fire & Safety Deptt., HR & A Deptt., and Utilizer Deptt., BTPS.
Annual Cost of PPE (on reimbursement basis at actual) for 01 workers. (07 months w. e. f 01. 07. 20 to 31. 01. 21) (Categories -VII) For 01 worker; soap (06 nos per month), Duster (04 nos per year), Helmet(01 no per 02 year), Safety shoe ( BATA make, Model-ENDURA L/C, Model No. 825-6051) (01 No/2 years), Gumboot (01 pair per year), Hand gloves (01 pair per month) , Nose guard (02 nos per month) to be supplied in consultation with Fire & Safety Deptt., HR & A Deptt., and Utilizer Deptt., BTPS.
Engagement of unskilled labour (01 head for 07 months i. e. 01. 07. 2020 to 31. 01. 2021) for different sweeping and cleaning jobs at various locations of all offices, toilets, roof & stairs of BTPS. Details of work as mentioned in Scope of work as per direction of EIC. Category VII. Note: - i) In case of enjoying C. L (Max. 14 days), this rate will be reduced by Rs. 75. 37 per day for each labour. ii) Mandays means physical attendance & CL if any. iii) ESI, PF, Bonus, House rent allowance and Welfare allowance are not included in rates. Including supply/ hire charges of necessary tools & tackles.
Provision of overtime for emergency works against labourers. (01 head for 07 months i. e 01.07.2020 to 31.01. 2021). Category VII.
Cost of listed holiday including PF & Bonus. (Max. 10 days w. e. f. 01. 07. 20 to 31. 01. 21) Note: Engaging of labourers on Holiday is depended on the requirement of service which is to be decided by E. I. C. on need basis. Category I.
House rent allowance for 01 nos worker for 07 months w. e. f. 01. 07. 20 to 31. 01. 21. This allowance @ 20 % of basic shall be paid to these workers for the full month subject to performing minimum 06 days work within a month by a particular worker. Payment will be made accordingly by per head per month. Category VII.
Welfare allowance for 01 nos worker. (01 heads for 07months w. e. f 01. 07. 20 to 31. 01. 21) This allowance @ 400/ per month shall be paid to these workers subject to minimum 06 days work per month by the worker. Payment will be made accordingly by per head per month. Category VII.
Statutory component (i. e., ESI, PF & Bonus) for 01 Nos. workers w. e. f 01. 07. 20 to 31. 01. 21. Category VII.
GST @18% (SAC-995429)
BTPS TOWNSHIP YOUTH CO OP LABOUR CONTRACT AND CONSTRUCTION SOCIETY LIMITED
STARLINE CONTRACTORS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .