Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | L1 | Accepted-AOC Lowest quoted amount | |
| 2 | L2₹2.1 L+₹8,022.18 (3.95%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical ARISHAD HOUSE AHMED NAGAR PANTAS KUTTER MALAPPURAM KERALA | MALAPPURAM | MALAPPURAM | KERALA | 676305 | - | Rejected-Technical L3 |
Tender Value
₹2.1 L
EMD Value
₹5,281
Closing Date
15 Dec 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE KARULAI
OFFICE OF AE KARULAI
CONSTRUCTION OF MILLUMPADI KULAVATTOM DRAINAGEL
2023_LSGD_627647_3
03 2023 AE LID EW KLI
Open Tender
Civil Works - Roads
Item Rate
180 days
KARULAI
Please refer Tender documents.
8 documents required · 8 mandatory
₹555
Yes
₹5,281
Yes
30 May 2024
4 Dec 2023
16 Dec 2023
4 Dec 2023
15 Dec 2023
4 Dec 2023
Amount
DRAINAGE
3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
OD176864/2023-2024:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6
11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br>II. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5)
75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification (i) Nominal mix (1:2:4)
12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204<br> For height upto 5 m <br> III. R.C.C grade M 20
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
OD235015/2023-2024:[OD from DAR 60.7.1]DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD235445/2023-2024:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
OD235483/2023-2024:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20
AJEESH T
MUHAMMED
Bidder Name
AJEESH T
MUHAMMED
RAJAGOPALAN T C
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_947854.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .