| 1 | L1₹8.7 LAccepted-AOC | L1 | Accepted-AOC AOC done | |
| 2 | Rejected-Technical THIRUVILAKKIL SANATHANAPURAM P O ALAPPUZHA AMBALAPPUZHA TALUK ALAPPUZHA DISTRICT | - | Rejected-Technical L3 bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical L2 BIDDER |
Tender Value
₹8.9 L
EMD Value
₹22,240
Closing Date
19 Feb 2022, 3:00 pmClosed
Asst.Executive Engineer
LID AND EW DIVISION ALAPPUZHA
compound wall
2022_LSGD_474229_7
JP22(5)/T/LIDEW/ALPY
Open Tender
Civil Works - Others
Item Rate
180 days
see work item details
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,780
Yes
₹22,240
Yes
26 Mar 2022
11 Feb 2022
21 Feb 2022
11 Feb 2022
19 Feb 2022
11 Feb 2022
Amount
compound wall
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
15.7.4 : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.2.2 : Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.44.1 : Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
10.2 : Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
od1649593/2021_2022 : Providing and fixing aluminium Trafold sheet pre coated (size, shape and pitch of<br>corrugation as approved by Engineer-incharge) 0.45 mm or nearest available thickness,total coated 240 mpa<br>steel grade, 5-7 microns epoxy primer on both side of the sheet and thickness with zinc coating 120 grams<br>per sqm as per IS: 277, inpolyester top coat 15-18 microns. Sheet should have protective guard film of<br>25microns minimum to avoid scratches during transportation and should be supplied in single length upto<br>12 metre or as desired by Engineer-in-charge.The sheet shall be fixed using self drilling /self tapping screws<br>of size (5.5x55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curvedsurfaces,<br>excluding the cost of purlins, rafters and trusses and including cuttingto size and shape wherever required
SHOUKATHALI V M
BAIJU V
Bidder Name
BAIJU V
SHOUKATHALI V M
LAKSHYA PROJECTS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_680357.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .