| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹70.1 LAdmitted-Finance | ₹70.1 L | L1 | Admitted-Finance |
| 2 | L2₹73.5 L+₹3.4 L (4.81%)Admitted-Finance | ₹73.5 L+₹3.4 L (4.81%) | L2 | Admitted-Finance |
| 3 | L3₹73.6 L+₹3.5 L (4.93%)Admitted-Finance | ₹73.6 L+₹3.5 L (4.93%) | L3 | Admitted-Finance |
| 4 | L4₹75.1 L+₹4.9 L (7.06%)Admitted-Finance | ₹75.1 L+₹4.9 L (7.06%) | L4 | Admitted-Finance |
| 5 | L5₹78.2 L+₹8.1 L (11.5%)Admitted-Finance 307 AGGARWAL PLAZA L S C CU BLOCK PITAMPURA DELHI 110088 | NORTH | DELHI | 110088 | ₹78.2 L+₹8.1 L (11.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ABHUJI PANAJI VANZARA L2 | sovereign enterprise L6 | Maruti Abhiyantriki L1 | M/s Mepabhai Mandan & Co L4 | P A SALES CORPORATION L5 | AKSHAR CONSTRUCTION L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Description of items and specification of work to executed (Complete work) | |||||||||
| 1.01 | Earth Work in Excavation - Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lifts, including getting out the excavated soil and disposal of surplus excavated soil within a lead of 50 m, complete as per direction of the Engineer-in-Charge. (Including excavation for column pits, trenches for wall foundations and provision for weep holes at base level as per instruction) | 667.69 | cum | 189 ₹1,26,193.41 | 190 ₹1,26,861.1 | 175 ₹1,16,845.75 | 150 ₹1,00,153.5 Lowest | 220 ₹1,46,891.8 | 150 ₹1,00,153.5 Lowest |
| 1.02 | Plain Cement Concrete (1:4:8) Bed
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering —with 1:4:8 (1 Cement: 4 coarse sand (Zone-III) : 8 graded stone aggregate 40 mm nominal size), including mixing, placing, compacting and curing complete as per direction of the Engineer-in-Charge. | 133.54 | cum | 5,200 ₹6,94,408 | 6,000 ₹8,01,240 | 3,700 ₹4,94,098 | 3,500 ₹4,67,390 Lowest | 5,500 ₹7,34,470 | 4,500 ₹6,00,930 |
| 1.03 | Random Rubble Masonry in Foundation and Plinth Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) in cement mortar 1:6 (1 cement : 6 coarse sand), including raking of joints, curing, scaffolding, and providing weep holes at 1.0 m c/c using 100 mm dia PVC pipes laid with slope towards drainage side, all complete as per drawing and direction of Engineer-in-Charge. | 320.1 | cum | 6,364 ₹20,37,116.4 | 5,400 ₹17,28,540 | 6,500 ₹20,80,650 | 6,000 ₹19,20,600 | 5,000 ₹16,00,500 Lowest | 6,100 ₹19,52,610 |
| 1.04 | Coursed Rubble Masonry in Superstructure
Coursed rubble masonry with hard stone (first sort) in superstructure above plinth level and up to floor five level, with cement mortar 1:6 (1 cement : 6 coarse sand), including raking of joints, curing, scaffolding, finishing of joints, and providing vertical expansion joints at intervals as per IS:3414 filled with bitumen-impregnated fibre board and sealed with approved sealant, all complete as per direction of Engineer-in-Charge. | 423.5 | cum | 7,400 ₹31,33,900 | 7,100 ₹30,06,850 | 7,170 ₹30,36,495 | 8,200 ₹34,72,700 | 6,500 ₹27,52,750 Lowest | 7,200 ₹30,49,200 |
| 1.05 | Reinforced Cement Concrete (1:2:4) up to Plinth Level Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering — all work with 1:2:4 (1 Cement : 2 coarse sand (Zone-III) : 4 graded stone aggregate 20 mm nominal size), including RCC in coping, bed blocks, column foundations and other elements as per drawing, compacted with mechanical vibrators, finished smooth with neat cement slurry and cured, complete. | 34.74 | cum | 10,500 ₹3,64,770 | 7,000 ₹2,43,180 | 4,500 ₹1,56,330 Lowest | 7,000 ₹2,43,180 | 6,500 ₹2,25,810 | 6,800 ₹2,36,232 |
| 1.06 | Reinforcement Steel
Providing, cutting, bending, binding and placing in position steel reinforcement bars for RCC columns, footings, coping and stirrups with 10% wastage, including binding wire, spacers, cover blocks, chairs etc., complete as per structural drawings and direction of Engineer-in-Charge. | 4,726 | Kg | 85 ₹4,01,710 | 180 ₹8,50,680 | 75 ₹3,54,450 | 65 ₹3,07,190 Lowest | 180 ₹8,50,680 | 97 ₹4,58,422 |
| 1.07 | Structural Steel (Angle Sections / Bracings)
Erection and fabrication of available angle sections at site including cutting, welding, hoisting, painting with one coat of red oxide primer and two coats of synthetic enamel paint, and fixing new wherever required, all complete as directed by the Engineer-in-Charge. | 240 | Nos | 250 ₹60,000 Lowest | 1,200 ₹2,88,000 | 450 ₹1,08,000 | 500 ₹1,20,000 | 1,100 ₹2,64,000 | 450 ₹1,08,000 |
| 1.08 | Concertina Wire / Barbed Wire Fencing
Providing and fixing concertina coil (RBT) fencing above boundary wall including fabrication and fixing of supports, necessary labour charges, materials, scaffolding and finishing complete as directed by the Engineer-in-Charge. | 1,770 | Kg | 35 ₹61,950 Lowest | 180 ₹3,18,600 | 125 ₹2,21,250 | 95 ₹1,68,150 | 175 ₹3,09,750 | 225 ₹3,98,250 |
| 1.09 | Reinforced Cement Concrete (1:2:4) in Walls / Copings / Columns
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, struts, buttresses, string or lacing courses, parapets, copings, anchor blocks etc. up to floor five level, excluding centering/shuttering and finishing, with 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm), including provision for coping over wall and expansion joints as shown in drawing, complete. | 32.34 | cum | 10,000 ₹3,23,400 | 3,500 ₹1,13,190 | 5,000 ₹1,61,700 | 7,000 ₹2,26,380 | 3,300 ₹1,06,722 Lowest | 6,800 ₹2,19,912 |
Tender Value
₹88.9 L
EMD Value
₹2.2 L
Closing Date
13 Nov 2025, 2:00 pmClosed
SA, ASI, Rajkot
Office of the Superintending Archaeologist, Rajkot
Construction of boundary wall at Sun Temple, Thangadh, Dist. Surendranagar for the year 2025-26
2025_ASI_884504_1
3C/1(20)/RJT/2025-26/C
Open Tender
Civil Works
Works
180 days
Thangadh
as per tender document
2 documents required · 2 mandatory
₹0
₹2.2 L
Yes
Office of the Superintending Archaeologist, Rajkot
27 Nov 2025
6 Nov 2025
14 Nov 2025
6 Nov 2025
13 Nov 2025
6 Nov 2025
6 Nov 2025 - 13 Nov 2025
11 Nov 2025
stage.html
html • 0.04 MB
technical_929685.pdf
techsummary_929685.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.71 MB
nitdocfinalretender.pdf
Tender Documents • 8.69 MB
BOQ_929685.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .