Loading…
Loading…
Tender Value
₹33.5 L
EMD Value
₹66,935
Closing Date
23 Jul 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
Executive Egnineer, PWD (R and B), Sabroom Divn
Mtc. of Non-Residential Office building of Sabroom PWD (R and B) Division/ SH - Horizontal extension of existing office building including Internal water supply, Sanitary installation, Sewage and Drainage works etc.
2026_CEPWD_74724_1
05/PNIeT/2026-27. 11/NIT/SE-III/B/2026-27
Open Tender
Civil Works - Building
Percentage
180 days
Sabroom
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
₹66,935
16 Jul 2026
16 Jul 2026
23 Jul 2026
16 Jul 2026
23 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil | 1 | Cum | 231.6 | ₹231.37 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
All kinds of soil | - | Cum | 161.3 | - |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1 | Cum | 1,177.3 | ₹1,176.12 |
| 4 | Supplying chemical emulsion in sealed containers including delivery as specified.
Chlorpyriphos/Lindane emulsifiable concentrate of 20% | 1 | Litre | 225.6 | ₹225.37 |
| 5Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment as per IS: 6313 (Part III)- Latest revision (excluding the cost of chemical emulsion): | |||||
| 5.01 | Along the external wall below concrete or masonry apron using chemical emulsion @ 2.25 litres per linear metre including drilling and plugging holes etc.
With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. | - | Metre | 22.9 | - |
| 5.02 | Treatment of soil under plinth filling using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with sand filling:
With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. | - | Sqm | 127.3 | - |
| 6Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level: | |||||
| 6.01 | 1:4:8 ( 1 Cement: 4 fine sand : 8 graded stone aggregate 40 mm nominal size) | - | Cum | 9,960.7 | - |
| 6.02 | 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size) | - | Cum | 10,570 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_76080.xls
BOQ • 0.52 MB
DNIT_Final_Ltst_office_building.pdf
Tender Documents • 3.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .