| 1 | 1₹15.2 LAccepted-AOC II 171 A MALAYIDAMTHURUTH PUKKATTUPADY ERNAKULAM ERNAKULAM KERALA 683561 | ERNAKULAM | KERALA | 683561 | ₹15.2 L | 1 | Accepted-AOC ACCEPTED OFFER L1 |
| 2 | Not Admitted-Finance 0 ATALA MOSQUE RIZWIKHAN JAUNPUR RIZVI KHAN JAUNPUR UTTAR PRADESH 222001 | JAUNPUR | UTTAR PRADESH | 222001 | - | - | Not Admitted-Finance Others-GST not Quoted |
| 3 | Not Admitted-Finance | - | - | Not Admitted-Finance Others-GST not quoted |
| Sl No | Description | Qty | Unit | classic electrical company L1 |
|---|---|---|---|---|
| 1.01 | Rewinding of LT Motors (AC) of following ratings, as per the scope of work. All winding materials such as winding wires, insulation papers, insulation tapes, cotton tapes, varnish, sleeve, glass lead etc., shall be in the scope of the contractor. However bearings and its replacement is excluded from the scope this contract. After rewinding, the motor shall be checked as per prescribed format and test reports shall be submitted. Rewound motors shall be accepted subject to verification of Test Reports and no load test run at our works for its satisfactory performance. Unit rate shall be inclusive of to & fro transportation after considering the scrap value of removed copper 0.18 kW, 4 pole | 2 | Nos. | 1,995 ₹2,354.1 Lowest |
| 1.02 | 0.37 kW, 4 pole | 2 | Nos. | 2,415 ₹2,849.7 Lowest |
| 1.03 | 0.55 kW, 6 pole | 1 | No | 1,995 ₹2,354.1 Lowest |
| 1.04 | 0.55 kW, 4 pole | 2 | Nos | 3,045 ₹3,593.1 Lowest |
| 1.05 | 0.75 kW, 6 pole | 1 | No. | 2,205 ₹2,601.9 Lowest |
| 1.06 | 0.75 kW, 4 pole | 1 | Nos. | 1,627.5 ₹1,920.45 Lowest |
| 1.07 | 0.75 kW, 2 pole | 1 | Nos. | 1,785 ₹2,106.3 Lowest |
| 1.08 | 1.1 kW, 4 pole | 4 | Nos. | 6,720 ₹7,929.6 Lowest |
| 1.09 | 1.1 kW, 2 pole | 1 | Nos. | 1,785 ₹2,106.3 Lowest |
| 1.10 | 1.5 kW, 6 pole | 1 | No. | 1,732.5 ₹2,044.35 Lowest |
Tender Value
₹16 L
EMD Value
₹40,000
Closing Date
30 Mar 2026, 3:00 pmClosed
HOU (TP)
Office of HOU (TP) TP unit KMML
AMC towards rewinding/repairs of LT induction motors
2026_KMML_844288_1
TP/ELE/AMC-MTR/2025-26
Open Tender
Electrical Works
Supply and Service
TP Unit of KMML
As per tender document
2 documents required · 2 mandatory
₹2,832
₹40,000
TP Unit of KMML
1 Jun 2026
6 Mar 2026
31 Mar 2026
6 Mar 2026
30 Mar 2026
16 Mar 2026
6 Mar 2026 - 16 Mar 2026
16 Mar 2026
Select, Excess (+), Less (-)
Tender Inviting Authority: HEAD OF UNIT (TP)
Name of Work: AMC towards rewinding/repair of LT induction motors.
Contract No: Tender No: TP/ELE/AMC-MTR/2025-26 DTD. 06/03/2026
Sl. No. Item Description Item Code / Make Quantity Units Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder (Rs.) S-GST in % CGST in % Discount in % IGST in % Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
0.00;[Re31]0.00 Rewinding of LT Motors (AC) of following ratings, as per the scope of work. All winding materials such as winding wires, insulation papers, insulation tapes, cotton tapes, varnish, sleeve, glass lead etc., shall be in the scope of the contractor. However bearings and its replacement is excluded from the scope this contract. After rewinding, the motor shall be checked as per prescribed format and test reports shall be submitted. Rewound motors shall be accepted subject to verification of Test Reports and no load test run at our works for its satisfactory performance. Unit rate shall be inclusive of to & fro transportation after considering the scrap value of removed copper 0.18 kW, 4 pole item1.1 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 0.37 kW, 4 pole item1.2 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 0.55 kW, 6 pole item1.3 0.0000 No Excess(+) Full Conversion INR
0.00;[Re31]0.00 0.55 kW, 4 pole item1.4 0.0000 Nos Excess(+) Full Conversion INR
0.00;[Re31]0.00 0.75 kW, 6 pole item1.5 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 0.75 kW, 4 pole item1.6 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 0.75 kW, 2 pole item1.7 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 1.1 kW, 4 pole item1.8 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 1.1 kW, 2 pole item1.9 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 1.5 kW, 6 pole item1.10 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 1.5 kW, 4 pole item1.11 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 1.5 kW, 2 pole item1.12 0.0000 No. Excess(+) Full Conversion INR
0.99;[Re31]0.99 2.2 kW, 6 pole item1.13 0.0000 No. Excess(+) Full Conversion INR
0.99;[Re31]0.99 2.2 kW, 4 pole item1.14 0.0000 Nos. Excess(+) Full Conversion INR
0.99;[Re31]0.99 2.2 kW, 2 pole item1.15 0.0000 Nos. Excess(+) Full Conversion INR
0.99;[Re31]0.99 3.7 kW, 6 pole item1.16 0.0000 No. Excess(+) Full Conversion INR
0.99;[Re31]0.99 3.7 kW, 4 pole item1.17 0.0000 Nos. Excess(+) Full Conversion INR
0.99;[Re31]0.99 3.7 kW, 2 pole item1.18 0.0000 Nos. Excess(+) Full Conversion INR
0.99;[Re31]0.99 4 kW, 4 pole item1.19 0.0000 Nos. Excess(+) Full Conversion INR
0.99;[Re31]0.99 5.5 kW, 4 pole item1.20 0.0000 Nos. Excess(+) Full Conversion INR
0.99;[Re31]0.99 5.5 kW, 2 pole item1.21 0.0000 Nos. Excess(+) Full Conversion INR
0.99;[Re31]0.99 7.5 kW, 8 pole item1.22 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 7.5 kW, 6 pole item1.23 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 7.5 kW, 4 pole item1.24 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 7.5 kW, 2 pole item1.25 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 11 kW, 4 pole item1.26 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 11 kW, 2 pole item1.27 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 12.5 kW, 2 pole item1.28 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 15 kW, 6 pole item1.29 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 15 kW, 4 pole item1.30 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 15 kW, 2 pole item1.31 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 18.5 kW, 4 pole item1.32 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 18.5 kW, 2 pole item1.33 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 22 kW, 4 pole item1.34 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 22 kW,2 pole item1.35 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 30 kW, 6 pole item1.36 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 30 kW, 4 pole item1.37 0.0000 No. Excess(+) Full Conversion INR
0.99;[Re31]0.99 30 kW, 2 pole item1.38 0.0000 Nos. Excess(+) Full Conversion INR
0.99;[Re31]0.99 37 kW, 10 pole item1.39 0.0000 Nos. Excess(+) Full Conversion INR
0.99;[Re31]0.99 37 kW, 6 pole item1.40 0.0000 Nos. Excess(+) Full Conversion INR
0.99;[Re31]0.99 37 kW, 4 pole item1.41 0.0000 Nos. Excess(+) Full Conversion INR
0.99;[Re31]0.99 37 kW, 2 pole item1.42 0.0000 Nos. Excess(+) Full Conversion INR
0.99;[Re31]0.99 45 kW, 4 pole item1.43 0.0000 Nos. Excess(+) Full Conversion INR
0.99;[Re31]0.99 55 kW, 6 pole item1.44 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 55 kW, 4 pole item1.45 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 75 kW, 4 pole item1.46 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 75 kW, 2 pole item1.47 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 90 kW, 4 pole item1.48 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 90 kW, 6 pole item1.49 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 90 kW, 2 pole item1.50 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 110 kW, 6 pole item1.51 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 110 kW, 4 pole item1.52 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 110 kW, 2 pole item1.53 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 132 kW, 6 pole item1.54 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 132 kW, 4 pole item1.55 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 150 kW, 4 pole item1.56 0.0000 Nos. Excess(+) Full Conversion INR
0.00;[Re31]0.00 200 kW, 6 pole item1.57 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 200 kW, 8 pole item1.58 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 200 kW, 10 pole item1.59 0.0000 No. Excess(+) Full Conversion INR
0.00;[Re31]0.00 250 kW, 2 pole item1.60 0.0000 No. Excess(+) Full Conversion INR
0.99;[Re1]0.99 Rewinding of brake coils after removal of old winding, new coil to be wound (single wound), insulated, varnished to be placed inside the magnet drum and to be filled with hardener. Lead wires to be sleeved and taken outside the brake coil magnet, with minimum 30 cm length. item2.1 0.0000 Nos. Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select %
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.11 MB
tenderdoc.pdf
Tender Documents • 0.32 MB
BOQ_1425389.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .