| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.6 CrAccepted-AOC 93 AMIT APT SECTOR 13 ROHINI ND 110085 | NORTH WEST | DELHI | 110085 | ₹2.6 Cr | 1 | Accepted-AOC L1 Agency |
| 2 | 2₹2.9 Cr+₹24.6 L (9.42%)Rejected-AOC | ₹2.9 Cr+₹24.6 L (9.42%) | 2 | Rejected-AOC L2 Agency |
| 3 | 3₹2.9 Cr+₹33.5 L (12.8%)Rejected-AOC | ₹2.9 Cr+₹33.5 L (12.8%) | 3 | Rejected-AOC L3 Agency |
| 4 | 4₹3.0 Cr+₹39.8 L (15.2%)Rejected-AOC N I T NO M 111 WZ 2025 26 TC 71 MUNICIPAL CORPORATION OF DELHI OFFICE OF THE EXECUTIVE ENGINEER M 111 WEST ZONE C BLOCK VISHAL ENCLAVE NEW DELHI 27 | CENTRAL DELHI | DELHI | 110002 | ₹3.0 Cr+₹39.8 L (15.2%) | 4 | Rejected-AOC L4 Agency |
| 5 | 5₹3.2 Cr+₹60.7 L (23.2%)Rejected-AOC | ₹3.2 Cr+₹60.7 L (23.2%) | 5 | Rejected-AOC L5 Agency |
Tender Value
₹3.5 Cr
Closing Date
3 Dec 2021, 6:00 pmClosed
Asst. Gen. Manager (Engg-C)
O/o HOD (Civil), Engineering Wing, AAI, Calicut Intl. Airport-673647
Reconstruction of weaker sections of security compound wall and associated works at Calicut International Airport- Phase II
2021_AAI_84573_1
AAI/CL/AGM (ENGG-C)/COMPOUND WALL/21-22/
Open Tender
Civil Works
Item Rate
210 days
Calicut Intl.Airport
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,180
Exempted
21 Jan 2022
17 Nov 2021
6 Dec 2021
18 Nov 2021
3 Dec 2021
18 Nov 2021
18 Nov 2021 - 24 Nov 2021
Amount
Carriage of materials by mechanical transport including loading, unloading, stacking etc. Complete as per the direction of Engineer-in-charge. 3km Earth
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. Ordinary rock
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth up to and including 120 cm girth
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 120 cm girth up to and including 240 cm girth
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing : 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Suspended floors, roofs, landings, balconies and access platform
Centering and shuttering including strutting, propping etc. and removal of form for all heights: Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for all heights: Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. and removal of form for all heights: Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Edges of slabs and breaks in floors and walls Above 20 cm wide
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
6 mm cement plaster of mix : 1:3 (1 cement : 3 fine sand)
Finishing walls with water proofing cement paint of required shade: New work (Two or more coats applied @ 3.84 kg/10 sqm)
Lettering with black Japan/Synthetic enamel paint paint of approved brand and manufacture
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix)
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead upto a lead of 10 km, including all lifts involved.
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 no's rounds per 6 metre length, up to 5 m height of wall with existing angle iron 'Y' shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape (R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Removing and stacking the existing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length (total length 90 m), up to 5m height of wall, along with 9 horizontal R.B.T. reinforced barbed wire, including unfastening of G.I. staples and G.I. clips, bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge. The item should be stacked properly in bundles so as to enable reuse of the same after construction of the compound wall in that area.
Dismantling laterite masonry work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. : In cement mortar.
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material (rubble/ stone) within the operational area in location/s at any lead and/ or lift, as directed by the Engineer-in-charge; and disposal of Moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved stacking location for all leads including all lifts involved as per directions of Engineer-in-charge In cement mortar
Laterite Stone Masonry Work in foundation and plinth by laying in position dressed laterite stone supplied by department in laterite stone masonry with cement mortar 1:6 (1 cement :6 coarse sand) including dressing of sides etc. complete as per the direction of Engineer-in-charge. Note: All work up to 1.20m above plinth beam will be measured under this item.
Laterite Stone Masonry Work above plinth level up to floor V level by laying in position dressed laterite stone supplied by department in laterite stone masonry with cement mortar 1:6 (1 cement :6 coarse sand) including dressing of sides etc. complete as per the direction of Engineer-in-charge.
Providing & fixing weep holes/ air holes in all kinds of masonry work at all levels using 110 mm (4”) PVC pipe (4kgf) of approved quality as per the directions of Engineer-in-charge
Fixing available concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 no's rounds per 6 metre length, up to 5 m height of wall with existing angle iron 'Y' shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape (R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Carriage of materials by mechanical transport including loading, unloading, stacking etc. Complete as per the direction of Engineer-in-charge. Laterite blocks for a lead of 1 km
Carriage of materials by mechanical transport including loading, unloading, stacking etc. Complete as per the direction of Engineer-in-charge. Laterite blocks for a lead of 2 km
Carriage of materials by mechanical transport including loading, unloading, stacking etc. Complete as per the direction of Engineer-in-charge. Laterite blocks for a lead of 3 km
Carriage of materials by mechanical transport including loading, unloading, stacking etc. Complete as per the direction of Engineer-in-charge. Laterite blocks for a lead of 4 km
Providing and fixing temporary sheet fencing, repeating the procedure till the material becomes unserviceable, with ISA 65 x 65 x 6mm as vertical members, ISA 50 x 50 x 6mm as horizontal members, connected with nut and bolt arrangement. Vertical members to be fixed at 3m centre to centre and embedded in concrete block of size 60 x 60 x 60 cm. 0.4mm thick colour coated sheet to be fixed with J hook to the horizontal member to form sheet fencing. The temporary fencing should be provided at locations where compound wall is broken for reconstruction as per the security standards and for prevention of animal entry. Once the work is completed, the sheet fencing should be dismantled, taken out and re-fixed at new locations. After completion of the whole work, the material will be returned to the agency. The rate shall include materials for the work, excavation of pit for embedding concrete block for fencing post, concreting, loading, unloading, transportation to new location, erection and repetition of process etc. complete as per the direction of Engineer-in-Charge
Providing and operating the hydraulic excavator cum back hoe loader on pneumatic tyre like J.C.B 2DX max or equivalent for cutting, levelling etc. in the operational area including transportation to and from the site of operation, fuel and driver charges and other incidental expenses on this account etc. as directed by the Engineer-in-Charge. (The payment will be based on the number of hours worked at the site for items that are not quantified otherwise.)
Dry laterite stone pitching with laterite stone blocks issued by department free of cost at various stacked locations in the operational area and preparing surface etc. complete.
Random rubble masonry with available hard stone, issued by department free of cost at various stacked locations in operational area in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement: 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) up to plinth level with: Cement mortar 1:6 (1 cement: 6 coarse sand). The hard stone boulders made available need to be broken to required size using mechanical breaker/ jack hammer, loaded, transported by mechanical transport, and unloaded at the work site to cover any lead and lift etc as directed by EIC. The rate is inclusive of all items mentioned above and nothing extra shall be paid in this regard.
Random rubble masonry with available hard stone, issued by department free of cost at various stacked locations in operational area, in superstructure above plinth level and up to floor five level including leveling up with cement concrete 1:6:12 (1 cement: 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) above plinth level with Cement mortar 1:6 (1 cement: 6 coarse sand). The hard stone boulders made available need to be broken to required size using mechanical breaker/ jack hammer, loaded, transported by mechanical transport, and unloaded at the work site to cover any lead and lift etc as directed by EIC. The rate is inclusive of all items mentioned above and nothing extra shall be paid in this regard.
Dismantling G.I. pipes manually/ by mechanical means including stacking of pipes at the designated stacking locations/stores, for any/all lead and lift as per direction of Engineer-in-charge : Above 40 mm nominal bore
SABIR CONSTRUCTION
DORALL INFRASTRUCTURES AND DEVELOPERS PVT LTD
SINGHAL ENTERPRISES
TATI CONSTRUCTION PVT LTD
SHAJIKUMAR SKSINTERIORS
M/S SAI VISHNU CONSTRUCTIONS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .