Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.6 LAccepted-AOC MOONIDIH DHANBAD 828129 | DHANBAD | DHANBAD | JHARKHAND | 828129 | ₹20.6 L Quoted ₹15.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹16.0 L+₹23,362.29 (1.48%)Rejected-AOC COAL INDIA LIMITED | ₹16.0 L+₹23,362.29 (1.48%) | L2 | Rejected-AOC L2 |
| 3 | L3₹16.1 L+₹34,966.08 (2.22%)Rejected-AOC | ₹16.1 L+₹34,966.08 (2.22%) | L3 | Rejected-AOC L3 |
Tender Value
₹15.5 L
EMD Value
₹19,340
Closing Date
26 Feb 2026, 5:00 pmClosed
S.K.Panja
Office of the Project Officer,WJ Area
Transportation and laying fitting 60lb track line at D19 in XVI(T ) Moonidih Colliery, W J Area
2026_BCCL_353327_1
BCCL/WJA/MND/SUR/2025-26/104
Open Tender
Miscellaneous Works
Percentage
40 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹19,340
15 Apr 2026
16 Feb 2026
27 Feb 2026
16 Feb 2026
26 Feb 2026
16 Feb 2026
Transportation and laying fitting 60lb track line at D19 in XVI(T ) Moonidih Colliery, W J Area
transportation (540m TG + 290 9th dip rise +30 X 2 sick line ) 890m, (890/5)x 2= 356 numbers of 60 lb track line(both trackline) from D18 BG/ 9th dip to d19 TG /9th dip and face .Analysis :- 6 unskilled manshift transport avg 12 numbers of tracks. Cost/track= (6x1402.6) /12= Rs 701.3/track
transport of ng sleeper from for 9th rise D18 BG to D19 TG and up to face. Number of sleeper 890 . Analysis 1 unskilled manshift required for transport 5 NG sleeper. Cost/sleeper= 1402.6/5 = Rs280.52/sleeper
laying fitting 890m, ( both track) 60lb track line from D18TG / 9th dip to D19 TG and upto , ( level face, 9 th dip rise, 2 sick line of 30m each. Analysis 6 unskilled manshift is required for 25m laying and fitting both tracks. Cost /m= (1402.6x6)/25= Rs336.62/m
packing track 890m. Analysis for 25m packing 6 unskilled is required. Cost/m= (1402.6x6)/25= Rs336.62/m.
(1) manual transportation of 4 number v from DR3 ROK to D19 TG face . For transrort 1 v , 8 Unskilled manshift and 3 shift is required. Total Manshift= 8 X 3shift X 4 number V= 96 manshift is required. (2) 1 number of V transport from D18 BG/9 rise to D19 TG/ 9th rise. manshift is required 8 manshift and 1 shift is required. total unskilled manshift = 96 + 8= 104 manshift.
fitting of 4 number of V in sick line. analysis 6 unskilled and 2 shift is required for 1 number V. Total manshift = 6 X 2 shift X 4 number V =48 manshift.
making 1 number of curve and fitting with pully and V. analysis 8 unskilled manshift and 3 shift is required. Total manshift = 8 x3 shift= 24manshift
Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR
CMPF, Pension and admin. Charge of Employee Un Skilled
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
techsummary_366114.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.60 MB
BOQ_366114.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .