Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.6 LAccepted-AOC MOONIDIH DHANBAD 828129 | DHANBAD | DHANBAD | JHARKHAND | 828129 | ₹20.6 L Quoted ₹15.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹16.0 LRejected-AOC COAL INDIA LIMITED | ₹16.0 L | L2 | Rejected-AOC L2 |
| 3 | L3₹16.1 LRejected-AOC | ₹16.1 L | L3 | Rejected-AOC L3 |
Tender Value
₹15.5 L
EMD Value
₹19,340
Closing Date
26 Feb 2026, 5:00 pmClosed
S.K.Panja
Office of the Project Officer,WJ Area
Transportation and laying fitting 60lb track line at D19 in XVI(T ) Moonidih Colliery, W J Area
2026_BCCL_353327_1
BCCL/WJA/MND/SUR/2025-26/104
Open Tender
Miscellaneous Works
40 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹19,340
15 Apr 2026
16 Feb 2026
27 Feb 2026
16 Feb 2026
26 Feb 2026
16 Feb 2026
Transportation and laying fitting 60lb track line at D19 in XVI(T ) Moonidih Colliery, W J Area
transportation (540m TG + 290 9th dip rise +30 X 2 sick line ) 890m, (890/5)x 2= 356 numbers of 60 lb track line(both trackline) from D18 BG/ 9th dip to d19 TG /9th dip and face .Analysis :- 6 unskilled manshift transport avg 12 numbers of tracks. Cost/track= (6x1402.6) /12= Rs 701.3/track
transport of ng sleeper from for 9th rise D18 BG to D19 TG and up to face. Number of sleeper 890 . Analysis 1 unskilled manshift required for transport 5 NG sleeper. Cost/sleeper= 1402.6/5 = Rs280.52/sleeper
laying fitting 890m, ( both track) 60lb track line from D18TG / 9th dip to D19 TG and upto , ( level face, 9 th dip rise, 2 sick line of 30m each. Analysis 6 unskilled manshift is required for 25m laying and fitting both tracks. Cost /m= (1402.6x6)/25= Rs336.62/m
packing track 890m. Analysis for 25m packing 6 unskilled is required. Cost/m= (1402.6x6)/25= Rs336.62/m.
(1) manual transportation of 4 number v from DR3 ROK to D19 TG face . For transrort 1 v , 8 Unskilled manshift and 3 shift is required. Total Manshift= 8 X 3shift X 4 number V= 96 manshift is required. (2) 1 number of V transport from D18 BG/9 rise to D19 TG/ 9th rise. manshift is required 8 manshift and 1 shift is required. total unskilled manshift = 96 + 8= 104 manshift.
fitting of 4 number of V in sick line. analysis 6 unskilled and 2 shift is required for 1 number V. Total manshift = 6 X 2 shift X 4 number V =48 manshift.
making 1 number of curve and fitting with pully and V. analysis 8 unskilled manshift and 3 shift is required. Total manshift = 8 x3 shift= 24manshift
Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR
CMPF, Pension and admin. Charge of Employee Un Skilled
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
techsummary_366114.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.60 MB
BOQ_366114.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid