| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63,498Accepted-AOC VILL DOH PO BADHANI TEHSIL BHORANJ DISTT H PUR H P | ₹63,498 Quoted ₹63,498.44 | L1 | Accepted-AOC Award letter |
| 2 | L2₹66,835.44+₹3,337 (5.26%)Rejected-Finance VILL BHANTREHED PO BAROTI SUB TEH DEHAR MANDI HP 175030 | MANDI | HIMACHAL PRADESH | 175030 | ₹66,835.44+₹3,337 (5.26%) | L2 | Rejected-Finance On higher Side |
| 3 | L3₹69,288.94+₹5,790.50 (9.12%)Rejected-Finance DEGREE COLLAGE 001 NEAR HAMIRPUR ANU HAMIRPUR H P | ₹69,288.94+₹5,790.50 (9.12%) | L3 | Rejected-Finance On higher Side |
Tender Value
₹63,562
Closing Date
16 Apr 2026, 11:00 amClosed
Sr. Executive Engineer
Electrical Division HPSEBL, Ghumarwin.
Tender for prov. in additional ST pole for proper ground clearance of 3-phase from various DTRs in (E) section Marhana under ESD HPSEBL, Bharari
2026_HPSEB_133489_1
NIT-04/2026-27
Open Tender
Electrical Works
Percentage
30 days
Ghumarwin
Please refer Tender documents.
4 documents required · 4 mandatory
₹236
16 Jul 2026
7 Apr 2026
17 Apr 2026
7 Apr 2026
16 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.000 | Erection of LT Line | - | - | - | - |
| 0.000 | Erection of Steel tubular pole 9/11 mtr. Long (LT) :-Digging of pit for poles, drilling of holes in poles,,erection of poles, erection of RCC muff, erection of D-iron, shackle insulator,earth hook filling of pit and ramming,Painting of poles etc, complete in all respect. | 6 | Nos. | - | - |
| 0.000 | Stay set(LT):- Digging of pit(0.8x1.2x1.35m),fixing of stay rod, filling and ramming of pit, nozzelling and tightening, . complete in all respect. | 2 | Set | - | - |
| 0.000 | Laying, stringing and sagging of AAAC/ACSR 7/3.15mm (50 mm2), (4 wire) of 3- Ø LT line:- Laying of conductor, stringing and sagging, binding with insulator, making jumpers on dead poles etc. complete in all respect.(Rate to be quoted per KM per wire) | 1 | KM | - | - |
| 0.000 | Mannual carriage of 1 phase LT line material for an average lead of 1.000 Km. from road head to site of work i.e 0.305 (length/Qty) x 0.100 (lead)= 0.030 KM (Avg. lead of material).( Rate to be quoted for 1 Km lead ) | - | Km | - | - |
| 2Providing and supply of material | |||||
| 0.999 | Supply part of LT line | - | - | - | - |
| 0.000 | Prov. Muff.with concerete filling | 6 | Each | 0.96 | ₹5.76 |
| 0.999 | Prov. Shackle Insulator with D-iron | 24 | Each | 0.32 | ₹7.68 |
| 0.000 | Prov. LT Stay set (i.c Stay Clamp) | 2 | Nos. | 0.56 | ₹1.12 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.13 MB
Biddocument01.pdf
Tender Documents • 0.43 MB
BOQ_197359.xls
BOQ • 0.29 MB
COR.pdf
PDF • 0.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .