Loading…
Loading…
Tender Value
₹80 L
EMD Value
₹1.4 L
Closing Date
29 Jun 2026, 6:00 pm
CWE (AF) Ambala
HQ CWE (AF) Ambala Cantt-133001
CWE/AF AMB/AMB-T06/2026-27 REPAIR MAINT OF CENTRALIZED AC PLANTS AT GURTH COMPLEX 601 SU AND BAKNAUR UNDER GE AF AMBALA
2026_MES_768614_1
CWE/AF AMB/AMB-T06/2026-27
Open Tender
Civil Works
365 days
Ambala
For MES enlisted contractor Class C Category c i and for un-enlisted contractor
refer NIT
8 documents required · 8 mandatory
₹1,000
GE (AF) Ambala
₹1.4 L
Yes
1 Jun 2026
1 Jun 2026
1 Jul 2026
1 Jun 2026
29 Jun 2026
23 Jun 2026
1 Jun 2026 - 20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Preventive, Non Comprehensive & Periodical maintenance/ Breakdown maintenance of Water cooled screw type compressor chiller plant of Capacity 3x100TR, checking serviceability of the parts of Microprocessor Based Control Panel such as microcontroller cards, sensors, relays, contactor, switches etc., compressor oil checking, checking of leakage of refrigerant piping etc.and descaling of condensor with suitable descaling chemical complete all as specified & directed.
Make of installed AC plant: Voltas, Model No: GSWCDXR100-1 | 4 | Each Quarter (Three Months) | - | - | itemH1Code1 |
| 2 | Preventive, Non Comprehensive & Periodical maintenance/ Breakdown maintenance of Water cooled screw type compressor chiller plant of Capacity 3x60TR, checking serviceability of the parts of Microprocessor Based Control Panel such as microcontroller cards, sensors, relays, contactor, switches etc., compressor oil checking, checking of leakage of refrigerant piping etc. and descaling of condensor with suitable descaling chemical complete all as specified & directed.
Make of installed AC plant: Blue Star, Model No: LCWR1-60A | 4 | Each Quarter (Three Months) | - | - | itemH1Code2 |
| 3 | Preventive, Non Comprehensive & Periodical maintenance/ Breakdown maintenance of Water cooled scroll type chiller plant of Capacity 3x25TR, checking serviceability of the parts of Microprocessor Based Control Panel such as microcontroller cards, sensors, relays, contactor, switches etc., compressor oil checking, checking of leakage of refrigerant piping etc. and descaling of condensor with suitable descaling chemical complete all as specified & directed.
Make of installed AC plant: Blue Star, Model No: XWC2S-026AR2 | 4 | Each Quarter (Three Months) | - | - | itemH1Code3 |
| 4 | Preventive, Non Comprehensive & Periodical maintenance / break down maintenance of 3x150TR Central Air Conditioning Plant semi-hermetic/open type compressor along with motor and its condenser, flooded chiller, microprocessor based control panel, sensors, relays, contactors, switches complete as per manufacturer's manual of preventive and comprehensive maintenance with periodicity (monthly) mentioned therein and as per particular specifications detailed here-in-after complete all as specified & directed.
Make of installed AC plant: Blue Star, Model No: LCWX1-0525D. | 4 | Each Quarter (Three Months) | - | - | itemH1Code4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Tender06T.pdf
Tender Documents • 0.67 MB
BOQ_860746.xls
BOQ • 6.03 MB
Download all tender documents and submit your bid