Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
29 May 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NITHIN C S
SM (P and P)-CD
MODIFICATION AND ERECTION OF SS TRUCK UNLOADING TANK
2025_FACT_859955_1
04096/2025-2026/E31502
Limited
Miscellaneous Works
Item Rate
25 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹12,000
Yes
30 May 2025
14 May 2025
30 May 2025
14 May 2025
29 May 2025
14 May 2025
MODIFICATION & ERECTION OF SS TRUCK UNLOADING TANK
MODIFICATION & ERECTION OF SS TRUCK UNLOADING TANK Work Involves: The scope of the work involves the modification of the SS tank to shorten its height and its erection. The contractor shall collect and transport necessary tools and tackles from the Tool Crib to the Worksite. Before beginning the modification, a thorough site assessment must be conducted, necessary permits secured, and safety measures implemented. Accurately mark the section to be removed as per the drawings/instructions of the Officer-in-Charge. Plasma cutting will then be employed to precisely cut the designated section of the tank. Once the section is removed, edge preparation must be carried out to ensure a clean and accurate fit for rejoining. Rejoining of the two halves shall be done by TIG welding. To prevent distortion during cutting and welding, temporary structural supports and reinforcement braces must be installed at critical points to stabilize the tank throughout the process. Transportation of necessary structurals and plates to the worksite from the Stores/Plant area for fabrication of the temporary structures falls under the scope of the contractor. Following shell to shell welding, post-weld inspections such as radiographic testing (All T joints & 10% of Total) must be conducted to verify joint integrity. After transportation of the Tank to the PAT area, erection at the PAT site falls under the scope of the contract (Transportation of the tank is not in the scope of this contract). The tank shall be erected properly at the location as per the drawings/instructions of the Technician/Officer-in-Charge. To ensure operational reliability, hydrostatic leak testing will be performed to confirm that the tank is leak-proof and capable of withstanding pressure requirements. In addition to this, the contractor must also provide and install manholes, inlet and outlet nozzles as per the approved design drawings. Manhole dummy fabrication also falls under the scope of the contractor. During the modification process, any unwanted nozzles, drain lines, and pipe connections in the existing tank must be identified, cut, and sealed to ensure a clean, functional final structure. Shortening of the inspection ladder attached to the tank also falls under the scope of the contract. Compressor for plasma cutting & Scaffolding shall be arranged by the contractor. The scope of this contract also includes the transportation of dummies and flanges to and from the workshop, as well as their handling within the workshop
REPAIR OF WELD JOINTS Work involves: Collection of required tools and tackles from the Tool Crib and tranport it to the worksite. If a joint is found to be defective during the leak test, the contractor must immediately carry out necessary repairs. This includes grinding out the defective weld, performing proper edge preparation, and re-welding the joint using TIG welding. Work to be carried out only after obtaining clearance from the concerned department. Hydrostatic testing will then be repeated to verify the leak-proof quality of the joint and ensure compliance with pressure requirements.
CUTTING AND STACKING SS PLATE Work involves: Collection of required tools and tackles from the tool crib and tranport it to the worksite. Detach the stiffeners from the removed section, and further divide the cut sections into smaller segments according to the drawings or instructions provided by the Technician or Officer-in-Charge. These cut pieces shall be stacked properly in the designated locations. Plasma cutting shall be employed for the cutting of the SS Plates.
AMMA CONSTRUCTION CORPORATION (BID ID -3222295)
M A Shamsudeen (BID ID -3218999)
BABY B (BID ID -3221936)
M A ALI (BID ID -3219008)
M K ALIAS (BID ID -3221815)
stage.html
html • 0.03 MB
finance_904047.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .