| 1 | ₹16.4 CrAdmitted-Finance | Admitted-Finance | |
| 2 | Rejected-Technical | Rejected-Technical Not eligible as per CE WRD Zone Jodhpur wide Letter No. 6804-07 dt 10.04.2026. | |
| 3 | Rejected-Technical | Rejected-Technical Not eligible as per CE WRD Zone Jodhpur wide Letter No. 6804-07 dt 10.04.2026. |
| Sl No | Description | Qty | Unit | CHOUDHARY AND BROTHERS |
|---|---|---|---|---|
| 1.00 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Top or intermediate bed plates, in between masonry or piers, abutments sluice wells etc. | 861.96 | sqm | 2,72,379.36 ₹3,21,407.64 Lowest |
| 2.00 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete) | 262.15 | cum | 29,360.8 ₹34,645.74 Lowest |
| 3.00 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Aqueduct troughs, siphon conduits, box type sluice barrels, domes spiral shafts or stair cases ( thin walled section) and ogee crests, baffle or chute blocks, end sills, buckets, projects coping, extended sill etc. | 57.76 | cum | 9,703.68 ₹11,450.34 Lowest |
| 4.00 | Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and removing | 613.23 | sqm | 1,08,492.65 ₹1,28,021.33 Lowest |
| 5.00 | 10.21 Providing and fixing Tubular Steel Railing on Precast RCC posts, 1.2 m high above ground level Providing, fencing and erecting 50 mm dia G.I pipe railing in 3 rows on precast M20 grade RCC vertical posts1.8 metres high (1.2 m above GL) with 3 holes 50 mm dia for pipe, fixed 2 metres centre to, complete as per approved drawing including all material, labour. | 20 | mtr | 28,480 ₹33,606.4 Lowest |
| 6.00 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 33,835.96 | kg | 23,67,840.48 ₹27,94,051.77 Lowest |
| 7.00 | Vitreous china foot rests 250x125x25 mm | 10 | pair | 1,920 ₹2,265.6 Lowest |
| 8.00 | Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia. of wire 0.63 mm | 25 | sqm | 7,200 ₹8,496 Lowest |
| 9.00 | Design, Drawing, fabrication, supply, erection, testing and commissioning of Vertical lift sliding type gate with frame consisting of skin plate, sealing frame, stiffeners, horizontal and vertical girders, guide, stainless steel flat/Brass flat, rivets, wedges, lifting rods etc., with all accessories as per relevant IS code including frame & gate complete set for Canal Cross, Escape, Head regulator /Tank head regulator including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, seal fixing, tools and tackles etc., applying two coat of zinc rich epoxy primer to give dry film thickness of 70 5 microns and finish coat (two coats) of solvent less coal tar epoxy paint using airless spray to provide dry film thickness of 150 5 microns per coat thus total dry film thickness of all coats, including primer coating, should not be less than 350 microns., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding, transportation charges for structural steel components and other materials. | 8.7 | tonne | 11,96,405.9 ₹14,11,758.96 Lowest |
| 10.00 | Providing, lowering, laying, aligning, fixing in position and jointing in trenches. Ductile Iron(DI) ISI marked K-7 grade S&S pipes as per IS: 8329-2000 (amended up to date) with internal cement mortar lining suitable for potable water with rubber ring (EPDM) joints as per IS:5382-1985 including all taxes(central and local), transportation and freight charges, inspection charges, loading/unloading charges stacking of pipes including cost of labour and material special (T-bend etc.) satisfactorily hydraulic testing, disinfection etc complete as per technical specification and direction of engineer incharge (excluding earthwork ).
Note-Providing and fixing of all requisite sepecials as per drawing, design and layout are inclusive in RM measurement of the item and shall not be paid seperately. 1000 mm | 186 | rm | 47,22,805.98 ₹55,72,911.06 Lowest |
Tender Value
₹17.7 Cr
EMD Value
₹35.5 L
Closing Date
20 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE WR Zone Jodhpur
CE WR Zone Jodhpur Lal Sagar Jodhpur
Rehabilitation of Jaswant Sagar Irrigation Project, District-Jodhpur
2026_WRDAS_527654_1
03/2025-26
Open Tender
Civil Works
Item Rate
Bilara
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Executive Engineer WR division Jodhpur
₹35.5 L
Yes
CE WR Zone Jodhpur Lal Sagar Jodhpur
28 Apr 2026
15 Jan 2026
23 Feb 2026
15 Jan 2026
20 Feb 2026
15 Jan 2026
23 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Top or intermediate bed plates, in between masonry or piers, abutments sluice wells etc. | 861.96 | sqm | 185 | ₹1,59,462.6 |
| 2 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete) | 262.15 | cum | 140 | ₹36,701 |
| 3 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Aqueduct troughs, siphon conduits, box type sluice barrels, domes spiral shafts or stair cases ( thin walled section) and ogee crests, baffle or chute blocks, end sills, buckets, projects coping, extended sill etc. | 57.76 | cum | 400 | ₹23,104 |
| 4 | Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and removing | 613.23 | sqm | 225 | ₹1,37,976.75 |
| 5 | 10.21 Providing and fixing Tubular Steel Railing on Precast RCC posts, 1.2 m high above ground level Providing, fencing and erecting 50 mm dia G.I pipe railing in 3 rows on precast M20 grade RCC vertical posts1.8 metres high (1.2 m above GL) with 3 holes 50 mm dia for pipe, fixed 2 metres centre to, complete as per approved drawing including all material, labour. | 20 | mtr | 1,841 | ₹36,820 |
| 6 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 33,835.96 | kg | 89 | ₹30,11,400.44 |
| 7 | Vitreous china foot rests 250x125x25 mm | 10 | pair | 140 | ₹1,400 |
| 8 | Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia. of wire 0.63 mm | 25 | sqm | 200 | ₹5,000 |
| 9 | Design, Drawing, fabrication, supply, erection, testing and commissioning of Vertical lift sliding type gate with frame consisting of skin plate, sealing frame, stiffeners, horizontal and vertical girders, guide, stainless steel flat/Brass flat, rivets, wedges, lifting rods etc., with all accessories as per relevant IS code including frame & gate complete set for Canal Cross, Escape, Head regulator /Tank head regulator including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, seal fixing, tools and tackles etc., applying two coat of zinc rich epoxy primer to give dry film thickness of 70 5 microns and finish coat (two coats) of solvent less coal tar epoxy paint using airless spray to provide dry film thickness of 150 5 microns per coat thus total dry film thickness of all coats, including primer coating, should not be less than 350 microns., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding, transportation charges for structural steel components and other materials. | 8.7 | tonne | 1,74,880 | ₹15,21,456 |
| 10 | Providing, lowering, laying, aligning, fixing in position and jointing in trenches. Ductile Iron(DI) ISI marked K-7 grade S&S pipes as per IS: 8329-2000 (amended up to date) with internal cement mortar lining suitable for potable water with rubber ring (EPDM) joints as per IS:5382-1985 including all taxes(central and local), transportation and freight charges, inspection charges, loading/unloading charges stacking of pipes including cost of labour and material special (T-bend etc.) satisfactorily hydraulic testing, disinfection etc complete as per technical specification and direction of engineer incharge (excluding earthwork ).
Note-Providing and fixing of all requisite sepecials as per drawing, design and layout are inclusive in RM measurement of the item and shall not be paid seperately. 1000 mm | 186 | rm | 32,290 | ₹60,05,940 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.39 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
FinalBidon13_01_2026.pdf
Tender Documents • 2.88 MB
BOQ_941728.xls
BOQ • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .