Loading…
Loading…
Tender Value
₹11.0 L
EMD Value
₹27,600
Closing Date
30 Sept 2026, 4:00 pm3d left
The Assistant Executive Engineer
Office of the Assistant Executive Engineer Electrical Sub Division, Kasaragod Vydyuthi Bhavanam, Near Municipal Stadium, Vidyanagar
Re-alignment of Existing KV Line and post in favour of PATEL DHARMESH BHAI MANSUKH BHAI
2026_KSEB_871483_1
03 /2026-27 /AEE/KSD dtd 18.09.2026
Open Tender
Electrical Works
Percentage
15 days
KUMBLA
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,900
₹27,600
22 Sept 2026
22 Sept 2026
3 Oct 2026
22 Sept 2026
30 Sept 2026
22 Sept 2026
22 Sept 2026 - 30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/
manual means over areas (exceeding 30 cm in depth, 1.5 m in width as
well as 10 sqm on plan) including getting out and disposal of excavated
earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-incharge
- Ordinary rock | 97.84 | cub.m | 645.33 | ₹63,139.09 |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation /
banking excavated or stacked materials- Ordinary or hard rock | 25.36 | cub.m | 292.86 | ₹7,426.93 |
| 3 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth level
: 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20
mm nominal size) | 11.05 | cub.m | 10,678.79 | ₹1,18,000.63 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of
form for Foundations, footings, bases of columns, etc. for mass concrete | 140.86 | sq.m | 481.24 | ₹67,787.47 |
| 5 | Stub setting in lines and levels using template in concrete foundation for
14 m A,B,C type lattice towers,etc as per specification and as directed by
the departmental staff at site. | 8 | Set | 2,597.27 | ₹20,778.16 |
| 6 | Providing and laying in position specified grade of reinforced cement
concrete, excluding the cost of centering, shuttering, finishing and
reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse
sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 24.92 | cub.m | 13,071.03 | ₹3,25,730.07 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting,Thermo-Mechanically Treated bars of grade Fe-500D or more.
bending, placing in position and binding all complete up to plinth level | 681.36 | kg | 140.1 | ₹95,458.54 |
| 8 | Erection of tower superstructures above the ground level including
erection of normal and special hill side members, wherever necessary,
providing insulators, cross arms tower accessories etc for 14m A,B,C type
lattice towers, 14 m A poles etc as per approved drawing and direction of
the departmental staff at site. | 17.92 | mt | 9,123.87 | ₹1,63,499.75 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth,
sides of foundations etc. in layers not exceeding 20cm in depth,
consolidating each deposited layer by ramming and watering, lead up to
50 m and lift upto 1.5 m. | 67 | cub.m | 396.86 | ₹26,589.62 |
| 10 | Conveyance of tower extensions and other structures and all other
materials including earthing materials | 11.28 | mt | 1,282.54 | ₹14,467.05 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.56 MB
BOQ_1477182.xls
BOQ • 0.28 MB
BIDDERDEAILS.pdf
Other Document • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .